Divestment Plan

Petrobras on LNG Regasification Terminal leasing

Petrobras Agency
01/02/2021 17:50
Visualizações: 1083 (0) (0) (0) (0)

Petrobras informs that the bidding process started on August 3, 2020 was ended, with no valid proposals, and that the company published, on today's date, Bid Notice 002, aiming to determine a new deadline for the accreditation of companies that manifest interest in participating in the new bidding for the leasing of the LNG Regasification Terminal of Bahia (TR-BA) and associated facilities. The bidding will be restricted to pre-qualified companies, respecting the conditions presented in the Call for Pre-qualification of December 9, 2019, available at Petrobras website (https://petrobras.com.br/en/business-channels).

 

The leasing is aligned with the company's strategy of improvement in its capital allocation and in consonance with the agreement for the natural gas market, celebrated with the Administrative Council of Economic Defense (CADE), on July 8, 2019, for the construction of a favorable environment for the entrance of new investors in the natural gas sector.

 

About the terminal 

The TR-BA consists of an island type pier with all the necessary facilities for mooring a FSRU (Floating Storage and Regasification Unit) ship directly to the pier and a supply ship on the port side of the FSRU. LNG transfer is made directly between FSRU and the supplier in a side by side configuration. The maximum TR-BA regasification flow rate is 20 million m³/d (@ 1 atm and 20°C). The FSRU is not part of the TR-BA leasing process.

 

The terminal's gas pipeline is 45 km long and 28 inches in diameter, connecting the TR-BA to two delivery points, the São Francisco do Conde Pressure Reduction Station and the São Sebastião do Passé Flow Control Station.

 

Also included in the scope of the transaction are the power generation and supply equipment located at the Madre de Deus Waterway Terminal (TEMADRE), part of the TR-BA.

Most Read Today
see see
OTC Houston 2025
Brazilian Companies Generate US$316 Million in Deals Dur...
22/05/25
Bahia Oil & Gas Energy 2025
The Largest Oil and Gas Event in Northern and Northeaste...
22/05/25
Pre-Salt
ANP Authorizes Start of Operations for Platform in the M...
22/05/25
ANP
Amounts related to March production from concession and ...
22/05/25
Bahia Oil & Gas Energy 2025
Tenaris highlights field-proven solutions for onshore pr...
22/05/25
Results
Oil Production Under Production-Sharing Regime Surpasses...
21/05/25
Equatorial Margin
Petrobras Obtains Authorization from Ibama for Deepwater...
21/05/25
International Event
4 Weeks to Go: North America’s Largest CCUS Event Approaches
20/05/25
Bahia Oil & Gas Energy 2025
BOGE25 to Offer Business Opportunities for Oil and Gas C...
16/05/25
Petrobras
The Búzios and Atapu fields received nearly the entire U...
13/05/25
Petrobras
Petrobras informs about shareholder remuneration
13/05/25
Pre-Salt
Petrobras informs about new oil discovery in the Santos ...
09/05/25
OTC Houston 2025
ABEMI reinforces strategic presence at OTC 2025
09/05/25
OTC Houston 2025
Oil States stands out at OTC Houston 2025 with award-win...
09/05/25
Natural Gas
Petrobras and Portobello establish unprecedented partner...
09/05/25
OTC Houston 2025
Offshore Technology Conference 2025: Waves of Innovation...
09/05/25
OTC Houston 2025
At OTC Houston 2025, Firjan takes part in MoU signing be...
09/05/25
Santos Basin
Karoon completes acquisition of FPSO Cidade de Itajaí
08/05/25
OTC Houston 2025
Brazilian company gains recognition at OTC with pioneeri...
08/05/25
OTC Houston 2025
Technology from Brazilian company Vidya is being used in...
08/05/25
OTC Houston 2025
Tenenge and Enseada are present at OTC 2025 in Houston
08/05/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.