Divestment Plan

Petrobras on LNG Regasification Terminal leasing

Petrobras Agency
01/02/2021 17:50
Visualizações: 1084 (0) (0) (0) (0)

Petrobras informs that the bidding process started on August 3, 2020 was ended, with no valid proposals, and that the company published, on today's date, Bid Notice 002, aiming to determine a new deadline for the accreditation of companies that manifest interest in participating in the new bidding for the leasing of the LNG Regasification Terminal of Bahia (TR-BA) and associated facilities. The bidding will be restricted to pre-qualified companies, respecting the conditions presented in the Call for Pre-qualification of December 9, 2019, available at Petrobras website (https://petrobras.com.br/en/business-channels).

 

The leasing is aligned with the company's strategy of improvement in its capital allocation and in consonance with the agreement for the natural gas market, celebrated with the Administrative Council of Economic Defense (CADE), on July 8, 2019, for the construction of a favorable environment for the entrance of new investors in the natural gas sector.

 

About the terminal 

The TR-BA consists of an island type pier with all the necessary facilities for mooring a FSRU (Floating Storage and Regasification Unit) ship directly to the pier and a supply ship on the port side of the FSRU. LNG transfer is made directly between FSRU and the supplier in a side by side configuration. The maximum TR-BA regasification flow rate is 20 million m³/d (@ 1 atm and 20°C). The FSRU is not part of the TR-BA leasing process.

 

The terminal's gas pipeline is 45 km long and 28 inches in diameter, connecting the TR-BA to two delivery points, the São Francisco do Conde Pressure Reduction Station and the São Sebastião do Passé Flow Control Station.

 

Also included in the scope of the transaction are the power generation and supply equipment located at the Madre de Deus Waterway Terminal (TEMADRE), part of the TR-BA.

Most Read Today
see see
Selic Rate
Selic Rate Hike to 14.75% Signals Risks to Industry and ...
08/05/25
OTC Houston 2025
A Sergipe delegation at the fair in the USA met with Pet...
07/05/25
RD&I
ouronova and Equinor develop robots to operate in FPSO tanks
07/05/25
OTC Houston 2025
Petrobras, IBP, Sinaval, and ApexBrasil promote new busi...
07/05/25
Offshore
Decommissioning of Fixed Platforms in Shallow Waters Att...
07/05/25
OTC Houston 2025
Vesper, a leader in industrial EX Fans and Exhausters, m...
07/05/25
Sergipe Oil & Gas 2025
SOG25 to Highlight Sergipe’s Oil and Gas Production Pote...
07/05/25
OTC Houston 2025
EPE destaca oportunidades de investimento no setor energ...
07/05/25
OTC Houston 2025
PPSA announces revision of the volume to be offered in t...
06/05/25
OTC Houston 2025
Fábio Mitidieri attends the opening of the Brazil Pavili...
06/05/25
Logistics
Vast completes 1,000th oil transshipment operation
06/05/25
Offshore Wind Energy
Brazil and the Netherlands promote seminar on offshore w...
06/05/25
Company News
Prime Energy expands operations in Minas Gerais
06/05/25
OTC Houston 2025
Brazil Brings the Largest Foreign Delegation to Oil and ...
05/05/25
OTC Houston 2025
IBP Featured in OTC Houston 2025 Lineup
05/05/25
OTC Houston 2025
To showcase Rio de Janeiro’s energy potential, Firjan ar...
05/05/25
OTC Houston 2025
Petrobras participates in OTC 2025, in Houston (USA
05/05/25
OTC Houston 2025
MODEC Group Professionals to Be Honored at OTC 2025
05/05/25
International Company News
TVO Adds to Global Business Development Team
01/05/25
Ethanol
Sugarcane production estimated at 663.4 million tons for...
30/04/25
OTC Houston 2025
Brazilian industry to attend OTC 2025 aiming to expand i...
30/04/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.