Divestment Plan

Petrobras on LNG Regasification Terminal leasing

Petrobras Agency
01/02/2021 17:50
Visualizações: 1085 (0) (0) (0) (0)

Petrobras informs that the bidding process started on August 3, 2020 was ended, with no valid proposals, and that the company published, on today's date, Bid Notice 002, aiming to determine a new deadline for the accreditation of companies that manifest interest in participating in the new bidding for the leasing of the LNG Regasification Terminal of Bahia (TR-BA) and associated facilities. The bidding will be restricted to pre-qualified companies, respecting the conditions presented in the Call for Pre-qualification of December 9, 2019, available at Petrobras website (https://petrobras.com.br/en/business-channels).

 

The leasing is aligned with the company's strategy of improvement in its capital allocation and in consonance with the agreement for the natural gas market, celebrated with the Administrative Council of Economic Defense (CADE), on July 8, 2019, for the construction of a favorable environment for the entrance of new investors in the natural gas sector.

 

About the terminal 

The TR-BA consists of an island type pier with all the necessary facilities for mooring a FSRU (Floating Storage and Regasification Unit) ship directly to the pier and a supply ship on the port side of the FSRU. LNG transfer is made directly between FSRU and the supplier in a side by side configuration. The maximum TR-BA regasification flow rate is 20 million m³/d (@ 1 atm and 20°C). The FSRU is not part of the TR-BA leasing process.

 

The terminal's gas pipeline is 45 km long and 28 inches in diameter, connecting the TR-BA to two delivery points, the São Francisco do Conde Pressure Reduction Station and the São Sebastião do Passé Flow Control Station.

 

Also included in the scope of the transaction are the power generation and supply equipment located at the Madre de Deus Waterway Terminal (TEMADRE), part of the TR-BA.

Most Read Today
see see
Carbon Capture
Impact Hub and Tencent launch program offering up to 1 m...
30/04/25
International
Petrobras presents investment opportunities in the naval...
30/04/25
Results
Petrobras production grows 5.4% and reaches 2.8 million ...
30/04/25
Carbon Reduction
Report: Baker Hughes Achieves Nearly 40% Reduction in Op...
29/04/25
Natural Gas
Comgás launches public call for natural gas acquisition
29/04/25
Royalties
Values related to February production under concession a...
29/04/25
Biogas
TBG develops Biogas Hub project to boost biofuel integra...
29/04/25
OTC Houston 2025
OTC 2025 Announces Emerging Leaders Class
25/04/25
OTC Houston 2025
Renown Deep-Sea Diver Chris Lemons to Speak at OTC 2025
15/04/25
SPE
Sustainability in the Oil and Gas Industry
15/04/25
Energy Efficiency
Foresea Develops Technologies to Reduce Emissions and In...
14/04/25
Permanent Offer
ANP Announces Sectors to Be Offered in the 5th Cycle of ...
14/04/25
Vitória Petroshow 2025
Vitória Petroshow 2025 establishes itself as the largest...
14/04/25
Opportunity
IBP President advocates for professional training to fil...
10/04/25
Vitória Petroshow 2025
Anchors' Night celebrates the success of Vitória Petrosh...
10/04/25
Bahia Oil & Gas Energy 2025
Bahia Oil & Gas Energy 2025 is now open for registration
10/04/25
Vitória Petroshow 2025
Vitória PetroShow Generates Nearly R$ 1 Billion in Busin...
09/04/25
Vitória Petroshow 2025
First Day of Vitória PetroShow 2025: Petrobras Announces...
09/04/25
Business
SBM Offshore signs US$400 million Sale and Leaseback agr...
09/04/25
Vitória Petroshow 2025
Vitória PetroShow 2025 reinforces Espírito Santo’s leade...
08/04/25
Vitória Petroshow 2025
Exploration of New Blocks Could Triple Reserves and Doub...
08/04/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.