Pre-Salt

Petrobras platform P-79 arrives at the Búzios field

Unit is capable of producing 180,000 barrels of oil and compressing 7.2 million m³ of gas per day

Petrobras Agency
12/02/2026 16:30
Petrobras platform P-79 arrives at the Búzios field Imagem: Petrobras Agency Visualizações: 43 (0) (0) (0) (0)

Petrobras's P-79 platform, an FPSO-type unit, arrived at the Santos Basin pre-salt this weekend, according to the planned schedule. The unit was towed to its location with the crew on board, a successful strategy already used with P-78 to reduce the time to start production.
 
"Embarking the crew during the voyage to the location allows complex FPSO systems to be brought into operational condition without interrupting the continuity of the commissioning process, in addition to enabling team training. All of this speeds up the start of production. The next steps will be anchoring the unit and connecting it to the producing wells," explains Petrobras's Director of Engineering, Technology and Innovation, Renata Baruzzi.
 
FPSO P-79 is another of the 12 units planned for installation in the Búzios field and joins the seven platforms already in operation: FPSOs P-74, P-75, P-76, P-77, Almirante Barroso, Almirante Tamandaré and P-78. P-79 has a production capacity of 180,000 barrels of oil, in addition to compressing 7.2 million m³ of gas per day. In October 2025, the field surpassed the milestone of 1 million barrels of oil produced per day, becoming Petrobras's largest-producing ultra-deepwater field.
 
The Búzios field is located in ultra-deep waters of the Santos Basin (depth of up to 2,100 meters), 180 km off the coast of the state of Rio de Janeiro. FPSO P-79 is part of the Búzios 8 Production Development project, which includes 14 wells, comprising 8 producers and 6 WAG injectors.
 
P-79 was built by SAME Netherlands BV, a Joint Venture formed by the Italian company SAIPEM Spa and South Korea's Hanwha Ocean, in Geoje-si, where the hull was constructed and the integration and commissioning of the topside modules were carried out. These modules were built in China, Brazil, South Korea, and Indonesia. The voyage from the shipyard to Brazil took approximately three months.
 
The Búzios consortium operating in the field is composed of Petrobras (operator), the Chinese partner companies CNOOC and CNODC, and PPSA, the company responsible for managing production sharing contracts.

Most Read Today
see see
Memorandum of Understanding
Wärtsilä and Abu Dhabi Maritime Academy explore collabor...
12/02/26
Pre-Salt
Petrobras platform P-79 arrives at the Búzios field
12/02/26
Results
Petrobras’ oil and gas production rises 11% and reaches ...
12/02/26
Permanent Offer
Comprehensive and Unprecedented Joint Statement Speeds U...
12/02/26
PPSA
MME and MMA Clear Strategic Pre-Salt Areas, Enabling the...
12/02/26
Biomethane
Biomethane in Focus with Debate on Credit, Regulation, a...
12/02/26
People
Mario Ferreira is the New Commercial Manager at Wiz Corp...
11/02/26
Visas Agreement
Brazil implements electronic VISIT Visa for Chinese citizens
22/01/26
Biofuels
Sifaeg Highlights New Investment Cycle and the Consolida...
21/01/26
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
Offshore Operations
Crew training and connectivity are the true enablers of ...
23/12/25
Recognition
IBP Wins the “Events Oscar” Once Again with ROG.e 2024
11/12/25
FIRJAN
Rio Could Generate 676,000 New Jobs by Stimulating Nine ...
11/12/25
Inland Navigation
Grease-Free Revolution in Latin America’s Workboat Sector
10/12/25
PPSA
Production-Sharing Contracts to Produce 2 Million Barrel...
10/12/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.