Production

Petrobras production start-up in Iracema Norte

Petrobras Agency
03/08/2015 12:54
Petrobras production start-up in Iracema Norte Imagem: Petrobras Agency Visualizações: 1674 (0) (0) (0) (0)

FPSO Cidade de Itaguaí begins operations in the Santos Basin pre-salt

 

This Friday (July 31), the Cidade de Itaguaí started up production to commence the operational phase of the Iracema Norte project. This area is located in the Lula oilfield off the coast of Rio de Janeiro, in the Santos Basin pre-salt.

 

The floating, production, storage and offloading vessel (FPSO) Cidade de Itaguaí is anchored at 2,220 meters, some 240 km offshore. It has capacity to process up to 150,000 barrels of oil and 8 million m3 of gas per day, and storage capacity of 1.6 million barrels of oil.

 

The 7-LL-36A-RJS well, the first to be connected to the FPSO, has a daily production potential of 32,000 barrels. The oil produced in the Iracema Norte area is high quality and of medium density (30º API) and will be transported by shuttle tankers. FPSO Cidade de Itaguaí will be connected to eight production wells and nine injection wells. It is expected to reach peak production of 150,000 oil barrels per day at the beginning of 2017.

 

The vessel’s modules were built and integrated in Brazil at shipyards in Rio de Janeiro (Itaguaí and Angra dos Reis) and São Paulo (São Sebastião). The Iracema Norte area is located in the BM-S-11 concession, operated by Petrobras (65%) in association with BG E&P Brasil Ltda (25%) and Petrogal Brasil S.A. (10%).

 

Technical characteristics

 

Oil production capacity: 150,000 barrels per day

Natural gas treatment capacity: 8 million m3 per day

Storage capacity: 1.6 million barrels of oil

Living quarters for 150 staff

Water depth: 2,220 meters

Most Read Today
see see
Rio Pipeline & Logistics 2025
ITP Brasil showcases high-performance engineering soluti...
10/09/25
Rio Pipeline & Logistics 2025
Overview of investments in pipeline and logistics infras...
10/09/25
Rio Pipeline & Logistics 2025
Young talents present innovative solutions at the Young ...
10/09/25
Rio Pipeline & Logistics 2025
Ministry of Ports and Airports aims to expand the role o...
10/09/25
Auction
PPSA makes available access to the Hybrid Data Package f...
10/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
FIRJAN
Brazilian industry records four consecutive months witho...
03/09/25
Copel
EPE President presents future outlook for the power sector
03/09/25
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
RD&I
CEPETRO develops for Petrobras a tool that integrates mu...
19/08/25
Pre-Salt
Búzios Field surpasses the record level of 900 thousand ...
19/08/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2