Production

Petrobras production start-up in Iracema Norte

Petrobras Agency
03/08/2015 12:54
Petrobras production start-up in Iracema Norte Imagem: Petrobras Agency Visualizações: 1680 (0) (0) (0) (0)

FPSO Cidade de Itaguaí begins operations in the Santos Basin pre-salt

 

This Friday (July 31), the Cidade de Itaguaí started up production to commence the operational phase of the Iracema Norte project. This area is located in the Lula oilfield off the coast of Rio de Janeiro, in the Santos Basin pre-salt.

 

The floating, production, storage and offloading vessel (FPSO) Cidade de Itaguaí is anchored at 2,220 meters, some 240 km offshore. It has capacity to process up to 150,000 barrels of oil and 8 million m3 of gas per day, and storage capacity of 1.6 million barrels of oil.

 

The 7-LL-36A-RJS well, the first to be connected to the FPSO, has a daily production potential of 32,000 barrels. The oil produced in the Iracema Norte area is high quality and of medium density (30º API) and will be transported by shuttle tankers. FPSO Cidade de Itaguaí will be connected to eight production wells and nine injection wells. It is expected to reach peak production of 150,000 oil barrels per day at the beginning of 2017.

 

The vessel’s modules were built and integrated in Brazil at shipyards in Rio de Janeiro (Itaguaí and Angra dos Reis) and São Paulo (São Sebastião). The Iracema Norte area is located in the BM-S-11 concession, operated by Petrobras (65%) in association with BG E&P Brasil Ltda (25%) and Petrogal Brasil S.A. (10%).

 

Technical characteristics

 

Oil production capacity: 150,000 barrels per day

Natural gas treatment capacity: 8 million m3 per day

Storage capacity: 1.6 million barrels of oil

Living quarters for 150 staff

Water depth: 2,220 meters

Most Read Today
see see
Logistics
PetroReconcavo and Dislub build an unprecedented oil out...
19/08/25
IBP
NAVE Program advances with 21 energy sector startups
19/08/25
International Event
The 3rd Annual World ReAM Show Returns to Dubai, Bridgin...
13/08/25
Sustainability
ATPI Expands Global Sustainability Portfolio with Brazil...
06/08/25
Results
ANP releases consolidated 2024 data in English for the r...
29/07/25
Sergipe Oil & Gas 2025
SOG25 Surpasses Expectations in Its 4th Edition and Sets...
28/07/25
Sergipe
Government of Sergipe and Petrobras Strengthen Partnersh...
28/07/25
Sergipe Oil & Gas 2025
Sergipe Oil & Gas 2025 Highlights the Competitiveness of...
25/07/25
Sergipe Oil & Gas 2025
Márcio Félix, President of ABPIP, Sees a Promising Futur...
25/07/25
Sergipe Oil & Gas 2025
Sergas Highlights Progress and Expansion of Natural Gas ...
25/07/25
Permanent Offer
ANP Approves Studies for the Calcita Project, Potentiall...
25/07/25
Sergipe Oil & Gas 2025
Natural Gas Market Takes Center Stage on Second Day of S...
25/07/25
People
New Interim Director to Take Office on 7/25 at ANP’s Dir...
24/07/25
Sergipe Oil & Gas 2025
Sebrae Participates in the Opening of Sergipe Oil & Gas 2025
24/07/25
Royalties
Royalties: May Production Revenues for Concession and Tr...
24/07/25
Sergipe Oil & Gas 2025
Sergipe Reinforces National Leadership in the Energy Sec...
24/07/25
Sergipe Oil & Gas 2025
Sergipe’s Oil and Gas Potential Highlighted at SOG25 Opening
23/07/25
Sergipe Oil & Gas 2025
Sergas Participates in Sergipe Oil & Gas 2025 with Focus...
23/07/25
Sergipe Oil & Gas 2025
Fourth Edition of Sergipe Oil & Gas Highlights State’s R...
23/07/25
RD&I
ANP Holds Workshop on Private Equity Investment Fund (FIP)
23/07/25
Campos Basin
Petrobras announces Approval of the Production Individua...
23/07/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2