Post-Salt

Petrobras reduces cost of post-salt well construction

Petrobras Agency
14/07/2020 15:16
Petrobras reduces cost of post-salt well construction Imagem: Petrobras Agency Visualizações: 542 (0) (0) (0) (0)

Petrobras informs that in early July, it completed, in half the time, the construction of the 7 GLF 49H ESS offshore well, in the Golfinho field, in the Espírito Santo Basin, 100 km from Vitória. This was the first post-salt well built with the application of the True One Trip Ultra Slender (TOTUS) concept, which consists of simplifying and reducing the time spent in the drilling and completion stages, based on optimizations and innovations inserted in the design and planning phases.

 

The pioneering use of TOTUS allowed the completion of this first well in only 44 days compared to the historical average of the field of 96 days, resulting in a cost reduction of approximately 50%, equivalent to US$ 30 million. Petrobras can apply this new concept in its new wells, in several mature fields in the post-salt, in the period from 2021 to 2025, with potential for cost reduction between US$ 20 - 35 million per well.

 

The TOTUS concept, developed and patented by Petrobras, is part of the company's effort to find technological solutions that aim to reduce costs in its activities in a safe and efficient way. The concept consists of drilling the well in only 3 phases (Ultra Slender) and the completion installed in a single maneuver (True One Trip), different from traditional configurations (4 or 5 drilling phases and 2 or more maneuvers to install the completion).

 

TOTUS can be used in certain mature fields of the post-salt where the geological and reservoir characteristics favor its application.

Most Read
see see
International
5th Congress of the Federation of Portuguese-Speaking La...
05/11/26
FIRJAN
Public-private partnership seen as vital to petrochemica...
05/11/26
Drilling
Norbe VIII, operated by Foresea, is ready to operate in ...
05/11/26
Refineries
TEM Boaventura Consortium completes lift of first reacto...
04/11/26
FIRJAN
Greater natural gas availability strengthens Rio de Jane...
03/11/26
Result
Oil and natural gas production hits a new record in Sept...
03/11/26
Pre-Salt
P-78 Platform (Búzios 6) reaches peak production of 180,...
03/11/26
Auction
Neoenergia wins Lots 1 and 7 in ANEEL Transmission Auction
30/10/26
WPC Energy
WPC Energy welcomes the Republic of Chad into membership
28/10/26
International
PortXL presents its 2026 cohort of 11 maritime startups ...
30/09/26
ADIPEC
ADIPEC 2026 set to welcome record Asian participation as...
29/09/26
ANP
Royalties: amounts referring to July production were dis...
29/09/26
25th WPC
Riyadh Takes Center Stage as Global Energy Heavyweights ...
28/09/26
ROG.e 2026
Petrobras president advocates active exploration and exp...
25/09/26
ROG.e 2026
Nikki Martin, president and CEO of EnerGeo Alliance, spo...
25/09/26
ROG.e 2026
Oil States Highlights Integration Between Engineering, M...
25/09/26
ROG.e 2026
Port of Açu and OceanPact sign agreement for expansion o...
25/09/26
ROG.e 2026
Lumina’s Role and the Impact of ROG.e 2026 on the Energy...
25/09/26
ROG.e 2026
Leaders Identify Brazil as a Pillar of Energy Security a...
24/09/26
ROG.e 2026
Firjan SENAI and Sebrae Rio Connect Small Businesses wit...
24/09/26
ROG.e 2026
PPSA Study Identifies Best Practices to Support Investme...
24/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.