Business

Petronas produces first oil from KBM Cluster

Fields which commenced on 16 December 2013.

Petronas
14/01/2014 13:00
Visualizações: 1559 (0) (0) (0) (0)

 

Malaysian oil giant Petronas has produced first oil from the Kapal, Banang & Meranti (KBM) Cluster fields, offshore Peninsular Malaysia, which commenced on 16 December 2013.
The KBM Cluster, operated by Coastal Energy KBM Sdn Bhd, has been developed with JV partner Petra Energy under a Risk Service Contract (RSC) since June 2012. This is the third RSC that has successfully achieved oil production, after the Balai Cluster and Berantai Fields.
The KBM Cluster is an eight-year development project with Kapal being in its first development and production phase. The Kapal field facilities consist of one mobile offshore production unit (MOPU), one storage tanker with approximately 600,000 barrels capacity, one drilling rig with an attached well bay module and two flexible flow lines.
Through this mobile offshore production concept, Petronas plans to continue determining the potential production from the three KBM fields. The initial production rates from the cluster were over 10,000 barrels/day, with peak production reaching 13,000 barrels/day.
To date, Petronas has awarded 10 fields in four clusters under the RSC arrangement. Four fields have commenced production with a total of over 30,000 barrels of oil equivalent (boe) per day.

Malaysian oil giant Petronas has produced first oil from the Kapal, Banang & Meranti (KBM) Cluster fields, offshore Peninsular Malaysia, which commenced on 16 December 2013.


The KBM Cluster, operated by Coastal Energy KBM Sdn Bhd, has been developed with JV partner Petra Energy under a Risk Service Contract (RSC) since June 2012. This is the third RSC that has successfully achieved oil production, after the Balai Cluster and Berantai Fields.


The KBM Cluster is an eight-year development project with Kapal being in its first development and production phase. The Kapal field facilities consist of one mobile offshore production unit (MOPU), one storage tanker with approximately 600,000 barrels capacity, one drilling rig with an attached well bay module and two flexible flow lines.


Through this mobile offshore production concept, Petronas plans to continue determining the potential production from the three KBM fields. The initial production rates from the cluster were over 10,000 barrels/day, with peak production reaching 13,000 barrels/day.


To date, Petronas has awarded 10 fields in four clusters under the RSC arrangement. Four fields have commenced production with a total of over 30,000 barrels of oil equivalent (boe) per day.

 

Most Read Today
see see
Rio Pipeline & Logistics 2025
Tanacas celebrates 25 years with the launch of the Smart...
10/09/25
Rio Pipeline & Logistics 2025
ITP Brasil showcases high-performance engineering soluti...
10/09/25
Rio Pipeline & Logistics 2025
Overview of investments in pipeline and logistics infras...
10/09/25
Rio Pipeline & Logistics 2025
Young talents present innovative solutions at the Young ...
10/09/25
Rio Pipeline & Logistics 2025
Ministry of Ports and Airports aims to expand the role o...
10/09/25
Auction
PPSA makes available access to the Hybrid Data Package f...
10/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
FIRJAN
Brazilian industry records four consecutive months witho...
03/09/25
Copel
EPE President presents future outlook for the power sector
03/09/25
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
RD&I
CEPETRO develops for Petrobras a tool that integrates mu...
19/08/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2