Business

Petronas produces first oil from KBM Cluster

Fields which commenced on 16 December 2013.

Petronas
14/01/2014 13:00
Visualizações: 2565 (0) (0) (0) (0)

 

Malaysian oil giant Petronas has produced first oil from the Kapal, Banang & Meranti (KBM) Cluster fields, offshore Peninsular Malaysia, which commenced on 16 December 2013.
The KBM Cluster, operated by Coastal Energy KBM Sdn Bhd, has been developed with JV partner Petra Energy under a Risk Service Contract (RSC) since June 2012. This is the third RSC that has successfully achieved oil production, after the Balai Cluster and Berantai Fields.
The KBM Cluster is an eight-year development project with Kapal being in its first development and production phase. The Kapal field facilities consist of one mobile offshore production unit (MOPU), one storage tanker with approximately 600,000 barrels capacity, one drilling rig with an attached well bay module and two flexible flow lines.
Through this mobile offshore production concept, Petronas plans to continue determining the potential production from the three KBM fields. The initial production rates from the cluster were over 10,000 barrels/day, with peak production reaching 13,000 barrels/day.
To date, Petronas has awarded 10 fields in four clusters under the RSC arrangement. Four fields have commenced production with a total of over 30,000 barrels of oil equivalent (boe) per day.

Malaysian oil giant Petronas has produced first oil from the Kapal, Banang & Meranti (KBM) Cluster fields, offshore Peninsular Malaysia, which commenced on 16 December 2013.


The KBM Cluster, operated by Coastal Energy KBM Sdn Bhd, has been developed with JV partner Petra Energy under a Risk Service Contract (RSC) since June 2012. This is the third RSC that has successfully achieved oil production, after the Balai Cluster and Berantai Fields.


The KBM Cluster is an eight-year development project with Kapal being in its first development and production phase. The Kapal field facilities consist of one mobile offshore production unit (MOPU), one storage tanker with approximately 600,000 barrels capacity, one drilling rig with an attached well bay module and two flexible flow lines.


Through this mobile offshore production concept, Petronas plans to continue determining the potential production from the three KBM fields. The initial production rates from the cluster were over 10,000 barrels/day, with peak production reaching 13,000 barrels/day.


To date, Petronas has awarded 10 fields in four clusters under the RSC arrangement. Four fields have commenced production with a total of over 30,000 barrels of oil equivalent (boe) per day.

 

Most Read Today
see see
Memorandum of Understanding
Wärtsilä and Abu Dhabi Maritime Academy explore collabor...
12/02/26
Pre-Salt
Petrobras platform P-79 arrives at the Búzios field
12/02/26
Results
Petrobras’ oil and gas production rises 11% and reaches ...
12/02/26
Permanent Offer
Comprehensive and Unprecedented Joint Statement Speeds U...
12/02/26
PPSA
MME and MMA Clear Strategic Pre-Salt Areas, Enabling the...
12/02/26
Biomethane
Biomethane in Focus with Debate on Credit, Regulation, a...
12/02/26
People
Mario Ferreira is the New Commercial Manager at Wiz Corp...
11/02/26
Visas Agreement
Brazil implements electronic VISIT Visa for Chinese citizens
22/01/26
Biofuels
Sifaeg Highlights New Investment Cycle and the Consolida...
21/01/26
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
Offshore Operations
Crew training and connectivity are the true enablers of ...
23/12/25
Recognition
IBP Wins the “Events Oscar” Once Again with ROG.e 2024
11/12/25
FIRJAN
Rio Could Generate 676,000 New Jobs by Stimulating Nine ...
11/12/25
Inland Navigation
Grease-Free Revolution in Latin America’s Workboat Sector
10/12/25
PPSA
Production-Sharing Contracts to Produce 2 Million Barrel...
10/12/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.