Pre-Salt

Second relief vessel contracted, concludes first operation in Búzios in BS pre-salt, Petrobras informs

T&B Petroleum/Petrobras Agency
10/09/2020 19:54
Second relief vessel contracted, concludes first operation in Búzios in BS pre-salt, Petrobras informs Imagem: Divulgation Visualizações: 2821 (0) (0) (0) (0)

Eagle Paulínia, the second of four new ships that are being added to Petrobras' fleet of relievers in 2020, carried out the first relief operations in Búzios, in the Santos Basin, and concluded its first operational cycle. In the last week of August, the vessel carried out two offloadings - oil transfer - from the P-74 and P-76 platforms, and transhipped the oil cargo to another exporting vessel in Angra dos Reis.

 

“The new vessels are essential to meet the great production potential of Petrobras, as well as the demand for export of the oil produced by the company. They represent a major leap in productivity in offloading operations, in line with our strategy of generating more value from our assets. With this strategy, we have obtained relevant results in the operation, with successive records of oil production in the Búzios field, for example; and in commercialization, with significant export volumes of oil and a record 1 million barrels per day exported in April ”, highlights André Chiarini, director of Commercialization & Logistics at Petrobras.

 

Like Eagle Petrolina, which has been operating since July in the Logistics relieving fleet, the new vessel has a transport and storage capacity of 1 million barrels. Custom-designed and built in South Korea, the Suezmax class vessel is equipped with a Dynamic Positioning (DP2) system, with high-powered thrusters and a dynamic positioning system. This mechanism allows the vessel to be stabilized automatically, ensuring safety and increasing the efficiency of the oil relief operation. The vessel is also equipped with electrically driven cargo pumps to increase the use of fuel and reduce costs.

 

The third vessel is in South Korea carrying out tests and is expected to arrive in Brazil in October. The fourth is scheduled for delivery in Singapore in November, and arrival in Brazil in December. The new vessels will integrate the company's current fleet of 21 DP vessels, which carry out about 1,800 offloadings per year. In addition to these relievers, Petrobras contracted, at the beginning of the year, three more tankers, with delivery scheduled for 2022.

Most Read Today
see see
Memorandum of Understanding
Wärtsilä and Abu Dhabi Maritime Academy explore collabor...
12/02/26
Pre-Salt
Petrobras platform P-79 arrives at the Búzios field
12/02/26
Results
Petrobras’ oil and gas production rises 11% and reaches ...
12/02/26
Permanent Offer
Comprehensive and Unprecedented Joint Statement Speeds U...
12/02/26
PPSA
MME and MMA Clear Strategic Pre-Salt Areas, Enabling the...
12/02/26
Biomethane
Biomethane in Focus with Debate on Credit, Regulation, a...
12/02/26
People
Mario Ferreira is the New Commercial Manager at Wiz Corp...
11/02/26
Visas Agreement
Brazil implements electronic VISIT Visa for Chinese citizens
22/01/26
Biofuels
Sifaeg Highlights New Investment Cycle and the Consolida...
21/01/26
Drilling
Foresea’s Norbe IX Drillship Undergoes Scheduled Mainten...
21/01/26
State of Ceará
Companies from Ceará lead the H2MOVER-Pecém project, sel...
08/01/26
Maritime Support
Ambipar carries out more than 600 port and maritime emer...
07/01/26
Petrobras
Petrobras celebrates 20 years of the Santos Basin Unit
07/01/26
Pelotas Basin
TGS launches maritime safety application for operations ...
07/01/26
Diesel
Petrobras and Vale move forward with fuel supply partnership
07/01/26
ANP
In November, Brazil produced 4.921 million boe/d
07/01/26
Offshore Operations
Crew training and connectivity are the true enablers of ...
23/12/25
Recognition
IBP Wins the “Events Oscar” Once Again with ROG.e 2024
11/12/25
FIRJAN
Rio Could Generate 676,000 New Jobs by Stimulating Nine ...
11/12/25
Inland Navigation
Grease-Free Revolution in Latin America’s Workboat Sector
10/12/25
PPSA
Production-Sharing Contracts to Produce 2 Million Barrel...
10/12/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.