Business

SLB OneSubsea Signs Contract with Petrobras for Subsea Equipment Acquisition for the Roncador Field

T&B Petroleum/Petrobras Agency
20/08/2024 18:30
SLB OneSubsea Signs Contract with Petrobras for Subsea Equipment Acquisition for the Roncador Field Imagem: Image SLB OneSubsea Visualizações: 918 (0) (0) (0) (0)

Last Friday (16th), Petrobras signed a contract for the acquisition of subsea equipment for the Roncador field in the Campos Basin. The contract is expected to generate approximately 500 direct and indirect jobs.

The agreement with the SLB OneSubsea group includes the supply of 2 Subsea Production Manifolds (SPM), 1 Electro-Hydraulic Distribution Unit (EHDU), and spare parts. The service provision includes installation, commissioning, intervention, maintenance, and preservation of the equipment.

The contract sets a minimum requirement of 40% local content for goods and services demands. However, it is expected to reach a percentage of 65%, contributing to the strengthening of the national economy.

The manufacturing of the SPM and EHDU will take place at SLB OneSubsea facilities in Taubaté (SP) and Curitiba (PR), with the production process scheduled to begin in the first quarter of 2025. The service demands will be met by factories in Macaé (RJ) and Rio das Ostras (RJ).

These subsea equipment components are essential for offshore oil and gas production projects. The Subsea Production Manifold (SPM) consolidates the production from two or more wells before directing it to the Floating Production Storage and Offloading Unit (FPSO). The Electro-Hydraulic Distribution Units (EHDU) provide the necessary hydraulic fluid for connecting subsea umbilicals between the wells and the FPSO.

About the Roncador Field

The P-52 (Mod 1A), P-54 (Mod 2), P-55 (Mod 3), and P-62 (Mod 4) platforms produce oil and gas from the Roncador field, which is a strategic partnership with Equinor. Petrobras holds a 75% stake in the Roncador field, while Equinor holds 25%.

While the P-54 and P-62 are FPSO units (Floating Production Storage and Offloading), the P-52 and P-55 are SS-type stationary production units (semi-submersible stationary units), having been installed in the years 2007, 2007, 2013, and 2014, respectively. They are installed at water depths between 1400m and 1840m.

 

 

 

 

Most Read
see see
Sustainability
Bahiagás Launches First Edition of its Sustainability Report
13/09/24
Business
Oil States Secures New External Workshop Services Contra...
13/09/24
RD&I
USP and FIT develop equipment for evaluating CO2 storage...
13/09/24
Pipeline
API Releases New Pipeline Safety Standard for Managing G...
27/08/24
ANP
Special Participation: Values related to the production ...
26/08/24
Shipbuilding Industry
Market Highlights Recovery and Advances in the Shipbuild...
26/08/24
ROG.E 2024
Subsea7 participates in ROG.e 2024.
26/08/24
Women in Industry
III Brazilian Women in Energy Congress takes place today...
26/08/24
ANP
Environmental database is available on the ANP website
22/08/24
Offshore Support
CMM has entered into a Memorandum of Understanding with ...
20/08/24
Business
SLB OneSubsea Signs Contract with Petrobras for Subsea E...
20/08/24
People
Luiz Césio Caetano is the New President of Firjan
20/08/24
SPE
Operational Safety of Wells in Focus
20/08/24
Seismic
Búzios Field Begins New Seismic Survey
20/08/24
Offshore Support
Camorim announces new contract with Petrobras to operate...
26/07/24
ROG.E
ROG.e 2024 confirms leaders from Ipiranga, Vestas, and U...
26/07/24
Production
ANP launches Dynamic Production Phase Wells Panel
26/07/24
Sergipe Oil &Gas 2024
The President of the National Petroleum Agency highlight...
26/07/24
Sergipe Oil &Gas 2024
Governor Fábio Mitidieri and ministers visit the constru...
26/07/24
Sergipe Oil &Gas 2024
Sergipe Oil & Gas highlights potential in exploration an...
26/07/24
Mature Fields
PRIO is investing in research, development, and innovati...
09/07/24
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

1