Statoil’s oil sands production decreased slightly in 2013. CO2 intensity rose due to facility maintenance and the integration of pilot technologies to reduce long-term CO2 intensity. Statoil’s 2020 CO2 intensity reduction target of 25% remains firm.
The 2013 Oil Sands Report presents performance indicators for production, energy consumption,  emissions intensity and resource use at the Leismer Demonstration Project and in the Kai Kos Dehseh (KKD) leases in northern Alberta.
As indicated in the 2012 report , production was expected to decrease slightly in 2013 due to a planned multi-week plant shutdown for facility maintenance and the integration of new scientific research and experimental development measures. 
These technology pilot measures are intended to both increase production and decrease CO2 intensity in the long term. 
Production decreased from 16,000 barrels of oil per day in 2012 to 15,000 barrels of oil per day in 2013.  CO2 intensity increased from 55.6 kg CO2/barrel to 69.7 kg CO2/barrel. The CO2 intensity in 2011 was 72.7 kg CO2/barrel.
“Our long-term CO2 targets for reduced carbon dioxide intensity in the production process with 25% by 2020 and 40% by 2025 remain firm,” says Statoil Canada country manager and senior vice president  Ståle Tungesvik.
The increase in CO2 intensity was anticipated due to two primary operational factors:
More steam was utilised in 2013 when a fourth steam generator was added to support new well pads and our current production wells.
We experienced an imbalance in the reservoir after a planned maintenance period. As a result, production levels were lower and steam use higher than usual—and this impacted our overall CO2 intensity rate.
“In 2013 we introduced new technologies to help further our ambitions. These include solvent co-injection, which has the potential to reduce the amount of steam and water used to produce a barrel of bitumen,” Tungesvik says.
Carbon dioxide intensity is expected to decrease as operations normalise and additional technology is introduced. However, in the near term, the CO2 intensity for Leismer may be higher than the projected segment target.
“Statoil’s technology plan remains on course. We have identified a group of 14 technologies we aim to test and deploy over the next five to 10 years.  A number of these technologies support our strategy to reduce CO2 emissions at their source,” says Tungesvik.
2013 demonstrated Statoil’s commitment to safety and the positive results of programs implemented in previous years with no serious health, safety and environmental incidents and no lost-time injuries.
Results of the first full year of Statoil’s surface water monitoring program showed no indication that the development of the Kai Kos Dehseh leases is having an effect on the natural water cycle of lakes and rivers monitored on our leases.
Production at Leismer began in January 2011 and is a steam-assisted gravity drainage (SAGD) facility. In January 2014, Statoil and the Thai exploration and production company PTTEP signed an agreement to divide their respective interests in the Kai Kos Dehseh (KKD) oil sands project.
Following the transaction, Statoil will continue as operator and 100% owner for the Leismer and Corner development projects. PTTEP will own 100% of the Thornbury, Hangingstone and South Leismer areas.

Statoil’s oil sands production decreased slightly in 2013. CO2 intensity rose due to facility maintenance and the integration of pilot technologies to reduce long-term CO2 intensity. Statoil’s 2020 CO2 intensity reduction target of 25% remains firm. The 2013 Oil Sands Report presents performance indicators for production, energy consumption,  emissions intensity and resource use at the Leismer Demonstration Project and in the Kai Kos Dehseh (KKD) leases in northern Alberta.
As indicated in the 2012 report , production was expected to decrease slightly in 2013 due to a planned multi-week plant shutdown for facility maintenance and the integration of new scientific research and experimental development measures. 


These technology pilot measures are intended to both increase production and decrease CO2 intensity in the long term.  Production decreased from 16,000 barrels of oil per day in 2012 to 15,000 barrels of oil per day in 2013.  CO2 intensity increased from 55.6 kg CO2/barrel to 69.7 kg CO2/barrel. The CO2 intensity in 2011 was 72.7 kg CO2/barrel.


“Our long-term CO2 targets for reduced carbon dioxide intensity in the production process with 25% by 2020 and 40% by 2025 remain firm,” says Statoil Canada country manager and senior vice president  Ståle Tungesvik.

The increase in CO2 intensity was anticipated due to two primary operational factors:
More steam was utilised in 2013 when a fourth steam generator was added to support new well pads and our current production wells.
We experienced an imbalance in the reservoir after a planned maintenance period. As a result, production levels were lower and steam use higher than usual—and this impacted our overall CO2 intensity rate.“In 2013 we introduced new technologies to help further our ambitions. These include solvent co-injection, which has the potential to reduce the amount of steam and water used to produce a barrel of bitumen,” Tungesvik says.
Carbon dioxide intensity is expected to decrease as operations normalise and additional technology is introduced. However, in the near term, the CO2 intensity for Leismer may be higher than the projected segment target.
“Statoil’s technology plan remains on course. We have identified a group of 14 technologies we aim to test and deploy over the next five to 10 years.  A number of these technologies support our strategy to reduce CO2 emissions at their source,” says Tungesvik.

 

2013 demonstrated Statoil’s commitment to safety and the positive results of programs implemented in previous years with no serious health, safety and environmental incidents and no lost-time injuries. Results of the first full year of Statoil’s surface water monitoring program showed no indication that the development of the Kai Kos Dehseh leases is having an effect on the natural water cycle of lakes and rivers monitored on our leases.

 

Production at Leismer began in January 2011 and is a steam-assisted gravity drainage (SAGD) facility. In January 2014, Statoil and the Thai exploration and production company PTTEP signed an agreement to divide their respective interests in the Kai Kos Dehseh (KKD) oil sands project. Following the transaction, Statoil will continue as operator and 100% owner for the Leismer and Corner development projects. PTTEP will own 100% of the Thornbury, Hangingstone and South Leismer areas.

 

Most Read Today
see see
Petrobras
Museum of Petroleum and New Energies will operate in the...
19/03/26
Macaé Energy
Macaé Energy: debates focus on the strategic role of nat...
18/03/26
Macaé Energy
Macaé Energy 2026 strengthens the municipality’s positio...
17/03/26
Macaé Energy
With record-breaking attendance, the Macaé Energy trade ...
17/03/26
Offshore Technology & Subsea Engineering
Trendsetter Vulcan Offshore Customizes Tethered BOP Tech...
17/03/26
Macaé Energy
FIRJAN: Technical Conference is a Highlight of Macaé Ene...
16/03/26
Permanent Offer
Inclusion of 15 New Blocks in Permanent Offer (OPP) Bid ...
14/03/26
Rio de Janeiro
Rio City Hall Signs Agreement to Transfer Automóvel Club...
13/03/26
Result
Porto do Açu Sets Historic Record in Cargo Handling
13/03/26
Environment
Following COP30, IBP Organizes Meeting to Debate Brazil'...
13/03/26
Jet Fuel
Resolution Approved to Revise Aviation Kerosene Quality ...
13/03/26
Biofuels
ANP to Participate in Research Project on Increasing Bio...
13/03/26
Results
Petrobras Paid R$ 277.6 Billion in Taxes and Government ...
13/03/26
North Sea
Two new discoveries in the North Sea
11/03/26
Macaé Energy
At Macaé Energy 2026, FIRJAN Promotes Special Edition of...
09/03/26
iBEM26
Innovation, ESG, and Sustainability
06/03/26
iBEM26
Artificial Intelligence drives increased demand for elec...
02/03/26
FIRJAN
Despite Tariff Hikes, Oil Drives Rio's Trade Flow Up 9% ...
27/02/26
Royalties
December Production Royalty Payments Distributed to Stat...
26/02/26
Award
BRAVA Energia Wins Top Honor at OTC Houston for Atlanta ...
26/02/26
Strategic Agenda
ABPIP Presents 2026 Strategic Agenda to Chairman of the ...
26/02/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.