Electric Power

The second stage of ANEEL Transmission Auction starts today with expectation of R$ 12.6 billion investments.

Press Office MME/T&B Petroleum
28/10/2016 17:20
The second stage of ANEEL Transmission Auction starts today with expectation of R$ 12.6 billion investments. Imagem: Divulgation Visualizações: 2157 (0) (0) (0) (0)

The National Electric Energy Agency (ANEEL) held on Friday (28/10) the second stage of Transmission Auction No. 13/2015 for hiring public service of electricity transmission in 10 states (Bahia, Ceará, Goiás, Espírito Santo, Minas Gerais, Pará, Paraíba, Pernambuco, Piauí and Rio Grande do Norte) with expected investments of R $ 12.6 billion and generate 25,658 direct jobs.

 

The event will take place at 11:30 am, at BM & FBOVESPA, in Sao Paulo. They represent the Ministry of Mines and Energy Secretary of Energy, Fabio Alves, and the Deputy Secretary of the Secretariat of Energy Planning and Development, Moacir Bertol.

 

In all, they auctioned 24 lots containing approximately 6800 kilometers (km) of transmission lines and 6,000 megavolt-ampere (MVA) of power substations.

 

The facilities are expected to enter commercial operation within 42-60 months from the date of signing of the concession contracts. The sum of the Permitted Annual Revenues (RAP) * maximum of 24 lots is $ 2.6 billion. The concessionaire winner will be entitled to receive, for 30 years, the RAP * for the service to be received from the commercial operation of the project.

 

The documents on the second stage of the Auction No. 13/2015 are available on the website of ANEEL.

Most Read
see see
PPSA
Federal Government receives R$ 917.32 million from Tupi ...
07/04/26
Study
Brazil increases dependence on thermal power, but lack o...
07/04/26
Permanent Offer
Permanent Production Sharing Offer (OPP): ANP publishes ...
07/04/26
Taxation
Infis Consultoria promotes the 4th Oil & Gas Taxation Se...
07/04/26
Green Hydrogen
Study at RCGI maps regions with the greatest potential f...
07/04/26
iBEM26
Goldwind advances in Bahia with factory in Camaçari and ...
27/03/26
iBEM26
Bahia showcases its bioenergy potential and reinforces i...
27/03/26
iBEM26
ESG practices in the renewable energy sector are highlig...
26/03/26
iBEM26
ABPIP highlights the role of independent producers in en...
26/03/26
iBEM26
Jerônimo Rodrigues highlights Bahia’s potential in the e...
26/03/26
Campos Basin
New oil discovery in the pre-salt of the Campos Basin
26/03/26
Royalties
Royalties: amounts related to January production for con...
26/03/26
iBEM26
iBEM 2026 begins in Salvador with debates on energy secu...
25/03/26
iBEM26
iBEM 2026 brings together specialists and discusses the ...
25/03/26
Petrobras
Museum of Petroleum and New Energies will operate in the...
19/03/26
Macaé Energy
Macaé Energy: debates focus on the strategic role of nat...
18/03/26
Macaé Energy
Macaé Energy 2026 strengthens the municipality’s positio...
17/03/26
Macaé Energy
With record-breaking attendance, the Macaé Energy trade ...
17/03/26
Offshore Technology & Subsea Engineering
Trendsetter Vulcan Offshore Customizes Tethered BOP Tech...
17/03/26
Macaé Energy
FIRJAN: Technical Conference is a Highlight of Macaé Ene...
16/03/26
Permanent Offer
Inclusion of 15 New Blocks in Permanent Offer (OPP) Bid ...
14/03/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.