Electric Power

The second stage of ANEEL Transmission Auction starts today with expectation of R$ 12.6 billion investments.

Press Office MME/T&B Petroleum
28/10/2016 17:20
The second stage of ANEEL Transmission Auction starts today with expectation of R$ 12.6 billion investments. Imagem: Divulgation Visualizações: 2485 (0) (0) (0) (0)

The National Electric Energy Agency (ANEEL) held on Friday (28/10) the second stage of Transmission Auction No. 13/2015 for hiring public service of electricity transmission in 10 states (Bahia, Ceará, Goiás, Espírito Santo, Minas Gerais, Pará, Paraíba, Pernambuco, Piauí and Rio Grande do Norte) with expected investments of R $ 12.6 billion and generate 25,658 direct jobs.

 

The event will take place at 11:30 am, at BM & FBOVESPA, in Sao Paulo. They represent the Ministry of Mines and Energy Secretary of Energy, Fabio Alves, and the Deputy Secretary of the Secretariat of Energy Planning and Development, Moacir Bertol.

 

In all, they auctioned 24 lots containing approximately 6800 kilometers (km) of transmission lines and 6,000 megavolt-ampere (MVA) of power substations.

 

The facilities are expected to enter commercial operation within 42-60 months from the date of signing of the concession contracts. The sum of the Permitted Annual Revenues (RAP) * maximum of 24 lots is $ 2.6 billion. The concessionaire winner will be entitled to receive, for 30 years, the RAP * for the service to be received from the commercial operation of the project.

 

The documents on the second stage of the Auction No. 13/2015 are available on the website of ANEEL.

Most Read Today
see see
FIRJAN
Agrega + Indústria brings together entities, companies, ...
29/07/26
SOG 2026
ABPIP brings to Sergipe Oil & Gas a debate on strengthen...
28/07/26
Event
BR Aviation presents its portfolio of customized solutio...
23/07/26
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
IBP Positioning
Change of the instrument does not fix the illegalities o...
07/07/26
Energy Summit
Energy Summit 2026: Embrapii technologies strengthen Bra...
22/06/26
Energy Summit
Biodiesel and renewable fuels move to the center of the ...
22/06/26
Natural Gas
ANP extends public consultation on the calculation of th...
22/06/26
Rio de Janeiro
Firjan’s Oil Yearbook in Rio highlights that positive pr...
22/06/26
Biomethane
With a market five times larger since 2020, the biometha...
22/06/26
Petrobras
Petrobras approves investment in bio-jet fuel and renewa...
22/06/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.