E&P

Total fields with extended production phase reaches 56

T&B Petroleum/Press Office ANP
20/05/2022 16:51
Total fields with extended production phase reaches 56 Imagem: Divulgation Visualizações: 2249 (0) (0) (0) (0)

The collegiate Board of ANP approved yesterday (19/5) the contractual extension of the production phase of three producing fields: east of Poço Xavier (Potiguar Basin), Boa Esperança (Potiguar Basin) and Atlanta (Santos Basin). The initial maturity of the contracts was scheduled for 05/08/2025 (east of Poço Xavier and Boa Esperança) and 26/12/2033 (Atlanta) and was extended until 31/12/2036, 05/08/2052 and 30/06/2044 respectively. With today's approvals there are a total of 56 Fields, mostly Round Zero (1998), with the production phase extended, being 29 on land and 27 at sea, in the basins of Campos, Reconcavo, Potiguar, Alagoas, Espirito Santo, Amazonas, Santos and Camamu.

 

With the extension phase of production, instead of the closure of the concession contract on the originally scheduled date, production is not interrupted, thus maintaining the benefits associated with it, such as the payment of government contributions, the contracting of services associated with operations and maintenance and the generation of new jobs. Another benefit is that the knowledge held by the current operator allows him to build more accurate models on the behavior of the field, maximizing production and generating efficiency gains.

 

Over the next five years, the fields that have already been extended are expected to invest 17.3 billion dollars.

 

The ANP has been working to analyze in an agile way the claims for contractual extension of the production phase and has promoted continuous improvements, such as the optimization of internal processes and the use of the framework of fields and accumulations of marginal economy for a simplified model of Development Plan, in the regulatory Agenda of the ANP for 2022-2023 period.

 

The possibility of extending the production phase of field contracts from Round Zero is foreseen in resolution 2/2016 of the National Energy Policy Council (CNPE), an understanding that was extended to fields from other rounds by CNPE resolution 6/2020. In all, 65 requests for the extension of the contract production phase have been analyzed by the ANP since 2016.

 

In order to be approved, applications for an extension must meet the following guidelines: the extension must be made only for Fields whose extension of the production period proves feasible beyond the original contractual period; concessionaires interested in the extension referred to in caput must submit the New Development Plan for approval by the ANP, indicating the investments to be made; the extension period must be compatible with the production expectations arising from the New Development Plan and the new investments, limited to twenty-seven years. Failure to comply with investment and production commitments, after ANP's analysis, may initiate an administrative process aimed at the loss of effectiveness of the extension.

 

The list of applications for extension of the production phase can be found at:https://www.gov.br/anp/pt-br/assuntos/exploracao-e-producao-de-oleo-e-gas/gestao-de-contratos-de-e-p/dados-de-e-p

Most Read Today
see see
Rio Pipeline & Logistics 2025
ITP Brasil showcases high-performance engineering soluti...
10/09/25
Rio Pipeline & Logistics 2025
Overview of investments in pipeline and logistics infras...
10/09/25
Rio Pipeline & Logistics 2025
Young talents present innovative solutions at the Young ...
10/09/25
Rio Pipeline & Logistics 2025
Ministry of Ports and Airports aims to expand the role o...
10/09/25
Auction
PPSA makes available access to the Hybrid Data Package f...
10/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
FIRJAN
Brazilian industry records four consecutive months witho...
03/09/25
Copel
EPE President presents future outlook for the power sector
03/09/25
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
RD&I
CEPETRO develops for Petrobras a tool that integrates mu...
19/08/25
Pre-Salt
Búzios Field surpasses the record level of 900 thousand ...
19/08/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2