Brazil

Tug is made ​​in Santa Catarina

Brazilian Ministry of Transport
23/01/2014 17:31
Tug is made ​​in Santa Catarina Imagem: TugBrasil Divulgation Visualizações: 1800 (0) (0) (0) (0)

 

The tug Arthur, belonging to the company Tug Brasil and built at Estaleiro Detroit Brasil, in Santa Catarina, was delivered 21th January. Funded by Merchant Marine Fund (FMM), the vessel had 59% of local content and counted with an investment of R$ 12.2 milion, of which approximately 84% was financed by FMM throught the Brazilian Bank of Economic, Development and Social (BNDES). 
The boat has 23.8 meters long, 4.14 meters draft and will be incorporated into the company to operate in Brazilian ports fleet. This is the first delivery of a series of 10 vessels Tugbrasil, all financed by the FMM.
The Merchant Marine Fund reaches, over this delivery, the total of 329 vessels in shipyards and six projects completed since 2007. Currently, there are 158 other vessels underway and eight works on construction sites funded by FMM.

The tug Arthur, belonging to the company Tug Brasil and built at Estaleiro Detroit Brasil, in Santa Catarina, was delivered 21th January. Funded by Merchant Marine Fund (FMM), the vessel had 59% of local content and counted with an investment of R$ 12.2 milion, of which approximately 84% was financed by FMM throught the Brazilian Bank of Economic, Development and Social (BNDES). 


The boat has 23.8 meters long, 4.14 meters draft and will be incorporated into the company to operate in Brazilian ports fleet. This is the first delivery of a series of 10 vessels Tugbrasil, all financed by the FMM.


The Merchant Marine Fund reaches, over this delivery, the total of 329 vessels in shipyards and six projects completed since 2007. Currently, there are 158 other vessels underway and eight works on construction sites funded by FMM.

Most Read Today
see see
OTC Brasil 2025
OTC Brazil connects the Equatorial Margin’s potential to...
30/10/25
OTC Brasil 2025
New Version of ANP’s Greenhouse Gas Emissions Dynamic Da...
30/10/25
OTC Brasil 2025
Port of Açu and IKM Advance Partnership to Create Brazil...
30/10/25
OTC Brasil 2025
Port of Açu and SISTAC Sign Agreement to Provide Decommi...
29/10/25
Royalties
Royalties from August Production Distributed to States a...
29/10/25
OTC Brasil 2025
iUP Innovation Connections Links Innovation Strategy to ...
29/10/25
ANP
Permanent Production Sharing Offer: Registered Companies...
29/10/25
OTC Brasil 2025
Firjan Showcases Technology and Innovation Solutions for...
29/10/25
OTC Brasil 2025
O&G exploration is key to social development and a just ...
28/10/25
OTC Brasil 2025
Experts warn regulatory instability threatens US$100 bil...
28/10/25
International Company News
Sercel Awarded Major Contract by ONGC to Supply Sercel 5...
28/10/25
Record
Petrobras announces production record of FPSO Almirante ...
28/10/25
OTC Brasil 2025
Event brings together global offshore industry leaders a...
28/10/25
OTC Brasil 2025
Petrobras participates in OTC Brasil 2025, in Rio de Janeiro
28/10/25
Petrobras
Petrobras produced 3.14 million barrels of oil equivalen...
27/10/25
FIRJAN
By 2035+, Rio de Janeiro State’s Energy Potential Could ...
23/10/25
Pre-Salt
PPSA to auction in December the first share of governmen...
23/10/25
Auction
Petrobras wins auction and leases RDJ07 terminal at the ...
23/10/25
Permanent Offer
Equinor acquires two new blocks in the Campos Basin duri...
23/10/25
OTC Brasil 2025
OTC Brasil 2025 Kicks Off in One Week with a Packed Prog...
22/10/25
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2