Equipments

Wärtsila Bags Integrated Solutions Order from Cosco Offshore

The Wärtsila solution includes the main power generation system.

Wärtsila
14/02/2014 12:32
Visualizações: 239 (0) (0) (0) (0)

 

Wärtsila Corporation, a marine industry provider of innovative products, solutions and services reported Thursday that the firm has signed a repeat integrated solution order with the Cosco (Qidong) Offshore shipyard covering another DP3 Dynamically Positioned offshore accommodation rig being built for Singapore based Axis Offshore. The Wärtsila solution includes the main power generation system, the propulsion system, the electric and automation system, and the automation safety system.
The vessel, which is expected to enter service in January 2016, will be equipped with a DP3 dynamic positioning system and will be available for worldwide operations. The dynamic positioning is a system that automatically maintains a vessel's position and heading by using its own propellers and thrusters.
The order was signed in December 2013. Wärtsila will begin deliveries of its equipment during the first half of 2014.This follows a similar order placed earlier last year by the same company for an identical comprehensive, fully integrated Wärtsila power, propulsion and positioning system.
“This second order to supply the same yard and owners during the same year with an identical integrated Wartsila solution undoubtedly proves the success of our offering. Being able to have the complete power, propulsion, and positioning system delivered from a single supplier means that all elements can be integrated into a synchronized, efficient and optimized total solution. The benefits are many fold, and the Wartsila concept can certainly be considered a winner,” says Magnus Miemois, vice president Wärtsila Ship Power Solutions.
The complex semi-submersible accommodation rig is being built by Cosco in China. Wärtsila will co-operate closely with the yard’s project team and will have a site management team to supervise installation of the Wärtsila equipment.

Wärtsila Corporation, a marine industry provider of innovative products, solutions and services reported Thursday that the firm has signed a repeat integrated solution order with the Cosco (Qidong) Offshore shipyard covering another DP3 Dynamically Positioned offshore accommodation rig being built for Singapore based Axis Offshore. The Wärtsila solution includes the main power generation system, the propulsion system, the electric and automation system, and the automation safety system.


The vessel, which is expected to enter service in January 2016, will be equipped with a DP3 dynamic positioning system and will be available for worldwide operations. The dynamic positioning is a system that automatically maintains a vessel's position and heading by using its own propellers and thrusters. The order was signed in December 2013. Wärtsila will begin deliveries of its equipment during the first half of 2014.This follows a similar order placed earlier last year by the same company for an identical comprehensive, fully integrated Wärtsila power, propulsion and positioning system.


“This second order to supply the same yard and owners during the same year with an identical integrated Wartsila solution undoubtedly proves the success of our offering. Being able to have the complete power, propulsion, and positioning system delivered from a single supplier means that all elements can be integrated into a synchronized, efficient and optimized total solution. The benefits are many fold, and the Wartsila concept can certainly be considered a winner,” says Magnus Miemois, vice president Wärtsila Ship Power Solutions.


The complex semi-submersible accommodation rig is being built by Cosco in China. Wärtsila will co-operate closely with the yard’s project team and will have a site management team to supervise installation of the Wärtsila equipment.

 

Most Read Today
see see
ROG.e 2026
M&O and Belga Marine to Showcase Global Energy and Offsh...
17/09/26
26th WPC
WPC ENERGY announces the theme, date and location for it...
16/09/26
New Contracts
Petrobras awards Strohm a contract to supply thermoplast...
15/09/26
ROG.e 2026
Equinor Celebrates 25 Years in Brazil and Showcases Its ...
15/09/26
ROG.e 2026
Sindicom to Host Lubricants Arena at ROG.e 2026
15/09/26
ROG.e 2026
ROG.e 2026 Expected to Generate R$ 593 Million for Rio d...
14/09/26
ABPIP
Independent Producers Propose Nine Measures for the Next...
14/09/26
Products and Services
RiverTough Bearings and Seals
05/09/26
International Company News
OES Group Returns to Private Ownership Following Managem...
31/08/26
Pre-Salt
Petrobras platforms P-80 and P-82, which will operate in...
31/08/26
Royalties
Values related to June production were distributed to st...
27/08/26
People
bp appoints Felipe Arbelaez head of country for Brazil
27/08/26
ROG.e 2026
ROG.e 2026 brings global leaders together to discuss the...
26/08/26
Pre-Salt
Búzios field sets monthly and daily natural gas export r...
26/08/26
Navalshore
Firjan SENAI presents the Supplier Opportunities Network...
17/08/26
Equatorial Margin
Morpho Well: Petrobras discovers hydrocarbons in ultra-d...
15/08/26
Power Generation
Campo Grande hosts four days of debates on bioenergy and...
12/08/26
International
KPMG: fossil fuel consumption falls, despite oil's signi...
12/08/26
Fenasucro
Fenasucro & Agrocana opening highlights Brazil's leaders...
12/08/26
Event
IBP and BIP bring together leaders to discuss technology...
11/08/26
Event
Asset Management gains prominence in corporate strategy;...
11/08/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2