Company News

Alstom completes Brazil’s first M-Upgrades on GT11N2 gas turbines at Enel´s Fortaleza power plant

Alstom
28/09/2015 16:39
Alstom completes Brazil’s first M-Upgrades on GT11N2 gas turbines at Enel´s Fortaleza power plant Imagem: Alstom Visualizações: 1932 (0) (0) (0) (0)

Alstom has completed the implementation of the first M-upgrades on two GT11N2 gas turbines installed in Central Geradora Termelétrica Fortaleza (CGTF), a combined-cycle power plant owned by Enel located in the northeast of Brazil. The upgrades were successfully implemented within the 30 days window of a regular major scheduled outage, part of a contract award to Alstom in 2013 for maintenance of gas turbines, including support on site and remote support for all types of inspections until 2023.

 

The M-upgrade is a product developed by Alstom that enhances power output, efficiency and availability of the gas turbine in a flexible way through extended intervals between outages. In the case of CGTF, the product increased the capacity by more than 8MW for each gas turbine.

 

“This is an important milestone for us since it is not only about the conclusion of another successful outage in Fortaleza, but also the first time that a company does this type of upgrade in Brazil. The completion of this task reinforces that our technology and technical support will ensure high availability of the plant with a safe and reliable operation”, commented Michael Rechsteiner, Senior Vice President of Alstom Thermal Services.

 

Alstom has a long contribution to the Brazilian market for power generation. In addition to CGTF (Enel) plant, Alstom has supplied similar equipment and services for other gas fired power plants such as UTE Leonel Brizola, UTE Fernando Gasparian and Celso Furtado (Petrobras) and for CSA Siderúrgica do Atlântico (ThyssenKrupp).

Most Read Today
see see
Rio Pipeline & Logistics 2025
Tanacas celebrates 25 years with the launch of the Smart...
11/09/25
Rio Pipeline & Logistics 2025
Offshore Projects to Strengthen Energy Security in Brazi...
11/09/25
Rio Pipeline & Logistics 2025
IBP Booth Hosts Inspiring Debate on Women in Midstream a...
11/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline 2025 Exhibition Showcases Innovations in En...
11/09/25
Production
Brazil’s Federal Government Oil and Natural Gas Producti...
11/09/25
Rio Pipeline & Logistics 2025
Brazil and Argentina Close to Agreement on Natural Gas T...
11/09/25
Rio Pipeline & Logistics 2025
ITP Brasil showcases high-performance engineering soluti...
10/09/25
Rio Pipeline & Logistics 2025
Overview of investments in pipeline and logistics infras...
10/09/25
Rio Pipeline & Logistics 2025
Young talents present innovative solutions at the Young ...
10/09/25
Rio Pipeline & Logistics 2025
Ministry of Ports and Airports aims to expand the role o...
10/09/25
Auction
PPSA makes available access to the Hybrid Data Package f...
10/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.