Solar Energy

Brazil Announces Huge 350 MW Floating Solar Power Plant

Brazil’s energy ministry has ranked the country’s various sources of energy as per their abundance, cheapness, renewability, and availability of the necessary technology.

Clean Technica
06/04/2015 14:38
Visualizações: 1829 (0) (0) (0) (0)

Brazil’s energy ministry has ranked the country’s various sources of energy as per their abundance, cheapness, renewability, and availability of the necessary technology. Among the available options, hydropower comes top, followed by wind power and biomass (mostly bagasse).

 

However the country has been reeling under its worst drought in 80 years. The Cantareira reservoir system, which serves more than nine million people in the state, is only 5% full. At the Alto Tietê reservoir network, which supplies three million people in greater Sao Paulo (South America’s largest city), water levels are below 15%.

 

A number of cities have taken to water rationing. With the reservoir levels falling too low to generate electricity, energy crises could be next in line due to the country’s dependence on hydropower on which it relies for up to 80% of its energy.

 

For sometime now, Brazil has been warming up to solar energy. Last year, Brazil’s National Electric Energy Agency (ANEEL), concluded its first exclusive solar power auction, providing 20-year PPAs to companies that will invest over $1.66 billion in 1,048 MW of solar power spread over 31 solar parks. Power production is expected to start by 2017. The country has now decided to further push solar energy.

 

According to reports, Brazil’s energy minister Eduardo Braga recently announced his government’s intentions to begin a series of pilot tests of floating solar power plants on hydroelectric dam reservoirs within a period of four months.

 

A 350 MW pilot project is being planned at the Balbina hydroelectric plant in the Amazon. The electricity thus generated is expected to cost between approximately $69 and $77 per MWh.

 

Ironically, the host for the project, the 250 MW Balbina hydroelectric plant, has long been a controversial project. In addition to the loss of habitat that occurred with its construction, it is claimed that methane released from the dam reservoir spread over 2,360 square kilometres, causing the facility to emit more greenhouse gases than most coal plants.

 

Floating PV systems have been gaining a lot of traction across several solar markets, those in the foray include Australia, India, Japan, Korea, and the US.

Most Read Today
see see
Rio Pipeline & Logistics 2025
ITP Brasil showcases high-performance engineering soluti...
10/09/25
Rio Pipeline & Logistics 2025
Overview of investments in pipeline and logistics infras...
10/09/25
Rio Pipeline & Logistics 2025
Young talents present innovative solutions at the Young ...
10/09/25
Rio Pipeline & Logistics 2025
Ministry of Ports and Airports aims to expand the role o...
10/09/25
Auction
PPSA makes available access to the Hybrid Data Package f...
10/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
FIRJAN
Brazilian industry records four consecutive months witho...
03/09/25
Copel
EPE President presents future outlook for the power sector
03/09/25
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
RD&I
CEPETRO develops for Petrobras a tool that integrates mu...
19/08/25
Pre-Salt
Búzios Field surpasses the record level of 900 thousand ...
19/08/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2