Pre-Salt

By 2030, Búzios (BS) field will have 12 FPSOs installed producing 2 million barrels/day of oil

T&B Petroleum/Petrobras Agency
19/11/2020 14:45
By 2030, Búzios (BS) field will have 12 FPSOs installed producing 2 million barrels/day of oil Imagem: Petrobras Agency Visualizações: 3526 (0) (0) (0) (0)

With 27% of Petrobras' oil production, the Búzios field should reach the end of the decade with daily production above 2 million barrels of oil per day. Until then, 12 production units will be operating in the field, with the inclusion in the coming years of eight new FPSOs in the current framework of 4 units already in operation (P-74, P-75, P-76 and P-77). The information was provided by Petrobras executive manager Marcio Kahn, who participated, last Tuesday (11/17), in the 3rd Pre-Salt Petroleum Technical Forum, promoted by PPSA. “Búzios is a field of great value and low cost”, defined Marcio, at the online event, which brought together professionals from the oil and gas sector to discuss the scenario of the next ten years in the Pre-Salt Polygon. Located in the Santos Basin, the Búzios field currently produces around 600 thousand barrels per day.

 

According to the executive, the P-78 and P-79 platforms, scheduled to start operations in Búzios in 2025, represent the company's new generation of high-capacity FPSOs, incorporating the lessons learned from the FPSOs already installed in the pre-salt, including contracting and construction aspects. Together, the two new units will add a capacity of 360,000 barrels per day to the field's production.

 

Also present at the event, Libra's executive manager, Mariana Cavassin, presented the HISEP Submarino technology, which is expected to start operating in the Mero 3 field in 2024, and is currently in the testing phase. The project intends to accelerate the production of the field and increase the recovery factor, through the separation and underwater reinjection of the gas with high CO2 content produced together with the oil. The executive also highlighted the contribution of technology to mitigate impacts related to carbon emissions, since CO2 is reinjected into the reservoir from the seabed.

 

The executive defended the extension of the production sharing contract, a regulatory model valid for the Libra field, which provides for the return of the asset in a maximum of 35 years. According to Mariana, the possibility of extending the term, as in the concession regime, would reduce uncertainties for the development of production and increase the attractiveness of the sector. “The idea is for a Bill to extend the performance of this model, which increases the continuity of investments and reduces the decommissioning processes. The result is a win for everyone: Petrobras, partners and society ”, he said. The Libra Consortium was formed by Petrobras (operator, with 40%), Total (20%), Shell Brasil (20%), CNPC (10%) and CNOOC Limited (10%), in the first pre-salt auction in sharing scheme, in October 2013, with PPSA as the contract manager.

Most Read Today
see see
Royalties
Royalties: amounts related to January production for con...
26/03/26
iBEM26
iBEM 2026 begins in Salvador with debates on energy secu...
25/03/26
iBEM26
iBEM 2026 brings together specialists and discusses the ...
25/03/26
Petrobras
Museum of Petroleum and New Energies will operate in the...
19/03/26
Macaé Energy
Macaé Energy: debates focus on the strategic role of nat...
18/03/26
Macaé Energy
Macaé Energy 2026 strengthens the municipality’s positio...
17/03/26
Macaé Energy
With record-breaking attendance, the Macaé Energy trade ...
17/03/26
Offshore Technology & Subsea Engineering
Trendsetter Vulcan Offshore Customizes Tethered BOP Tech...
17/03/26
Macaé Energy
FIRJAN: Technical Conference is a Highlight of Macaé Ene...
16/03/26
Permanent Offer
Inclusion of 15 New Blocks in Permanent Offer (OPP) Bid ...
14/03/26
Rio de Janeiro
Rio City Hall Signs Agreement to Transfer Automóvel Club...
13/03/26
Result
Porto do Açu Sets Historic Record in Cargo Handling
13/03/26
Environment
Following COP30, IBP Organizes Meeting to Debate Brazil'...
13/03/26
Jet Fuel
Resolution Approved to Revise Aviation Kerosene Quality ...
13/03/26
Biofuels
ANP to Participate in Research Project on Increasing Bio...
13/03/26
Results
Petrobras Paid R$ 277.6 Billion in Taxes and Government ...
13/03/26
North Sea
Two new discoveries in the North Sea
11/03/26
Macaé Energy
At Macaé Energy 2026, FIRJAN Promotes Special Edition of...
09/03/26
iBEM26
Innovation, ESG, and Sustainability
06/03/26
iBEM26
Artificial Intelligence drives increased demand for elec...
02/03/26
FIRJAN
Despite Tariff Hikes, Oil Drives Rio's Trade Flow Up 9% ...
27/02/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.