Business

FoundOcean wins contracts to secure Solan foundations

The pipeline damage resulted from an anchor drag during bad weather.

FoundOcean
14/04/2014 21:37
Visualizações: 3453 (0) (0) (0) (0)

 

FoundOcean has completed installation and grouting for a clamp repair on an 18-in. pipeline in the Gulf of Mexico under contract from Saipem America.
The seabed a water depth of 750 m (2,460 ft) was dredged at around the damaged area of the pipeline. An ROV maneuvered the two steel half-shells of the clamp into position and pre-tightened the bolts. FoundOcean then connected the hose to the inlet valve on the clamp and delivered the grout using its deepwater grouting umbilical system. Due to the extra load, a fabric formwork was installed under the clamp to provide more support.
In total 28 metric tons (30.86 tons) of cement was used: 4 metric tons (4.4 tons) for the clamp and 24 metric tons (26.46 tons) for the fabric formwork.
The pipeline damage resulted from an anchor drag during bad weather.

FoundOcean has completed installation and grouting for a clamp repair on an 18-in. pipeline in the Gulf of Mexico under contract from Saipem America.


The seabed a water depth of 750 m (2,460 ft) was dredged at around the damaged area of the pipeline. An ROV maneuvered the two steel half-shells of the clamp into position and pre-tightened the bolts. FoundOcean then connected the hose to the inlet valve on the clamp and delivered the grout using its deepwater grouting umbilical system. Due to the extra load, a fabric formwork was installed under the clamp to provide more support.


In total 28 metric tons (30.86 tons) of cement was used: 4 metric tons (4.4 tons) for the clamp and 24 metric tons (26.46 tons) for the fabric formwork.


The pipeline damage resulted from an anchor drag during bad weather.

Most Read
see see
ROG.e 2026
ROG.e 2026 kicks off next Monday (21) with global energy...
19/09/26
ROG.e 2026
Camorim invests R$ 250 million in 2026 to expand fleet a...
18/09/26
ROG.e 2026
Firjan SENAI SESI Presents New Technologies at ROG.e Dev...
18/09/26
ADIPEC 2026
ADIPEC 2026 to mobilise investment in resilient, intelli...
18/09/26
Acquisition
CoreMarine takes a decisive step to expand its offshore ...
17/09/26
ROG.e 2026
M&O and Belga Marine to Showcase Global Energy and Offsh...
17/09/26
26th WPC
WPC ENERGY announces the theme, date and location for it...
16/09/26
New Contracts
Petrobras awards Strohm a contract to supply thermoplast...
15/09/26
ROG.e 2026
Equinor Celebrates 25 Years in Brazil and Showcases Its ...
15/09/26
ROG.e 2026
Sindicom to Host Lubricants Arena at ROG.e 2026
15/09/26
ROG.e 2026
ROG.e 2026 Expected to Generate R$ 593 Million for Rio d...
14/09/26
ABPIP
Independent Producers Propose Nine Measures for the Next...
14/09/26
Products and Services
RiverTough Bearings and Seals
05/09/26
International Company News
OES Group Returns to Private Ownership Following Managem...
31/08/26
Pre-Salt
Petrobras platforms P-80 and P-82, which will operate in...
31/08/26
Royalties
Values related to June production were distributed to st...
27/08/26
People
bp appoints Felipe Arbelaez head of country for Brazil
27/08/26
ROG.e 2026
ROG.e 2026 brings global leaders together to discuss the...
26/08/26
Pre-Salt
Búzios field sets monthly and daily natural gas export r...
26/08/26
Navalshore
Firjan SENAI presents the Supplier Opportunities Network...
17/08/26
Equatorial Margin
Morpho Well: Petrobras discovers hydrocarbons in ultra-d...
15/08/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.