Products and Services

Kraken FPSO to receive topside power module from Wärtsilä

Vessel to be deployed at the Kraken oilfield.

Bumi Armada
28/01/2014 12:53
Visualizações: 1555 (0) (0) (0) (0)

 

Wärtsilä will supply a 62 MW topside power module solution for a Floating Production, Storage and Offloading (FPSO) vessel to be deployed at the Kraken oilfield located in the UK sector of the North Sea.
This EPC (engineering, procurement and construction) award has been given in December 2013 by Armada Kraken Pte.Ltd, a wholly owned subsidiary of the Malaysia based international offshore oilfield services provider, Bumi Armada.
The project will comprise the EPC delivery of two identical power generation modules, each housing two 16-cylinder Wärtsilä 50DF multi-fuel engines with generators, waste heat recovery units and all related fuel, oil and air and other utility systems. 
The modules are designed by Wärtsilä Ship Design. The engines are capable of being operated on a variety of fuel types, including treated well gas, heavy crude oil, and marine diesel oil (MDO). The ability to utilise produced gas and crude means that little or no MDO will need to be shipped to the FPSO. This will notably reduce operating costs. Furthermore, the efficient gas-fired power solution will have significantly lower levels of CO2 emissions compared to conventional technologies.
Bumi Armada Enters North Sea Market with Kraken FPSO Deal
Bumi Armada will be using a recently built Suezmax tanker for the FPSO conversion, which will have a storage capacity of 600,000 barrels. The Wärtsilä equipment will be delivered in mid 2015, and the FPSO is scheduled to start the production at the Kraken field in 2016.
“Wärtsilä is the marine and oil & gas industries’ leading solutions and services provider of power solutions. Our vast experience with multi-fuel technology and our ability to integrate complex projects provide the level of reliability that global operators expect. This engagement with Bumi Armada endorses the fact that our integrated power module solutions offer the critical fuel flexibility and the high levels of efficiency and availability that successful offshore operations demand,” says Magnus Miemois, Vice President Solutions, Wärtsilä Ship Power.
The Kraken oilfield development is one of the largest new oilfields in the U.K. sector of the North Sea, and among the largest investments announced for this sector in 2013. Approximately 140 million barrels of heavy oil are expected to be extracted from the Kraken field over the coming 25 years.

Wärtsilä will supply a 62 MW topside power module solution for a Floating Production, Storage and Offloading (FPSO) vessel to be deployed at the Kraken oilfield located in the UK sector of the North Sea.


This EPC (engineering, procurement and construction) award has been given in December 2013 by Armada Kraken Pte.Ltd, a wholly owned subsidiary of the Malaysia based international offshore oilfield services provider, Bumi Armada.The project will comprise the EPC delivery of two identical power generation modules, each housing two 16-cylinder Wärtsilä 50DF multi-fuel engines with generators, waste heat recovery units and all related fuel, oil and air and other utility systems. 


The modules are designed by Wärtsilä Ship Design. The engines are capable of being operated on a variety of fuel types, including treated well gas, heavy crude oil, and marine diesel oil (MDO). The ability to utilise produced gas and crude means that little or no MDO will need to be shipped to the FPSO. This will notably reduce operating costs. Furthermore, the efficient gas-fired power solution will have significantly lower levels of CO2 emissions compared to conventional technologies.


Bumi Armada enters North Sea market with Kraken FPSO Deal


Bumi Armada will be using a recently built Suezmax tanker for the FPSO conversion, which will have a storage capacity of 600,000 barrels. The Wärtsilä equipment will be delivered in mid 2015, and the FPSO is scheduled to start the production at the Kraken field in 2016.


“Wärtsilä is the marine and oil & gas industries’ leading solutions and services provider of power solutions. Our vast experience with multi-fuel technology and our ability to integrate complex projects provide the level of reliability that global operators expect. This engagement with Bumi Armada endorses the fact that our integrated power module solutions offer the critical fuel flexibility and the high levels of efficiency and availability that successful offshore operations demand,” says Magnus Miemois, Vice President Solutions, Wärtsilä Ship Power.


The Kraken oilfield development is one of the largest new oilfields in the U.K. sector of the North Sea, and among the largest investments announced for this sector in 2013. Approximately 140 million barrels of heavy oil are expected to be extracted from the Kraken field over the coming 25 years.

Most Read Today
see see
BOGE2026
Smart Control Gains Prominence at Bahia Oil & Gas Energy...
09/06/26
BOGE2026
Bahia Oil & Gas Energy Concludes Historic Edition and Se...
06/06/26
Branded Content
Boaventura Energy Complex drives Brazil’s energy future ...
06/06/26
BOGE2026
Mayekawa do Brasil present at Bahia Oil & Gas Energy
06/06/26
BOGE2026
Benel Marks Presence at Bahia Oil & Gas Energy and Annou...
02/06/26
BOGE2026
Bahiagás Highlights Bahia’s Leading Role in the Energy T...
30/05/26
Investments
Petrobras Announces Investments of More Than R$ 70 Billi...
30/05/26
BOGE2026
Oil States Reinforces Commitment to Innovation and Opera...
29/05/26
BOGE2026
PetroReconcavo Discusses the Future of Oil and Gas at Ba...
29/05/26
BOGE2026
Lumina Group Makes Its Presence Felt at Bahia Oil & Gas ...
29/05/26
BOGE2026
Bahia Brings Together Industry, Innovation, and Business...
28/05/26
Royalties
Amounts related to March production for concession and t...
28/05/26
BOGE2026
Oil & Gas Expansion Boosts Demand for Industrial Waste T...
28/05/26
BOGE2026
BRAVA Energia Marks Presence at Bahia Oil & Gas Energy 2...
27/05/26
IBP
Brazil Can Expand Its Prominence as a Global Energy Supp...
27/05/26
Investments
Petrobras and Transpetro announce R$ 2.8 billion in inve...
27/05/26
International Company News
Jumbo orders a new class of versatile heavy lift vessels
27/05/26
BOGE2026
The Largest Oil and Gas Event in the North and Northeast...
25/05/26
BOGE2026
With production on the rise, independent players lead di...
25/05/26
ANP
ANP Workshop Debates Boosting Oil and Gas Exploration in...
25/05/26
BOGE2026
ANP participates in Bahia Oil & Gas Energy 2026, in Salvador
25/05/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.