Products and Services

Kraken FPSO to receive topside power module from Wärtsilä

Vessel to be deployed at the Kraken oilfield.

Bumi Armada
28/01/2014 12:53
Visualizações: 668 (0) (0) (0) (0)

 

Wärtsilä will supply a 62 MW topside power module solution for a Floating Production, Storage and Offloading (FPSO) vessel to be deployed at the Kraken oilfield located in the UK sector of the North Sea.
This EPC (engineering, procurement and construction) award has been given in December 2013 by Armada Kraken Pte.Ltd, a wholly owned subsidiary of the Malaysia based international offshore oilfield services provider, Bumi Armada.
The project will comprise the EPC delivery of two identical power generation modules, each housing two 16-cylinder Wärtsilä 50DF multi-fuel engines with generators, waste heat recovery units and all related fuel, oil and air and other utility systems. 
The modules are designed by Wärtsilä Ship Design. The engines are capable of being operated on a variety of fuel types, including treated well gas, heavy crude oil, and marine diesel oil (MDO). The ability to utilise produced gas and crude means that little or no MDO will need to be shipped to the FPSO. This will notably reduce operating costs. Furthermore, the efficient gas-fired power solution will have significantly lower levels of CO2 emissions compared to conventional technologies.
Bumi Armada Enters North Sea Market with Kraken FPSO Deal
Bumi Armada will be using a recently built Suezmax tanker for the FPSO conversion, which will have a storage capacity of 600,000 barrels. The Wärtsilä equipment will be delivered in mid 2015, and the FPSO is scheduled to start the production at the Kraken field in 2016.
“Wärtsilä is the marine and oil & gas industries’ leading solutions and services provider of power solutions. Our vast experience with multi-fuel technology and our ability to integrate complex projects provide the level of reliability that global operators expect. This engagement with Bumi Armada endorses the fact that our integrated power module solutions offer the critical fuel flexibility and the high levels of efficiency and availability that successful offshore operations demand,” says Magnus Miemois, Vice President Solutions, Wärtsilä Ship Power.
The Kraken oilfield development is one of the largest new oilfields in the U.K. sector of the North Sea, and among the largest investments announced for this sector in 2013. Approximately 140 million barrels of heavy oil are expected to be extracted from the Kraken field over the coming 25 years.

Wärtsilä will supply a 62 MW topside power module solution for a Floating Production, Storage and Offloading (FPSO) vessel to be deployed at the Kraken oilfield located in the UK sector of the North Sea.


This EPC (engineering, procurement and construction) award has been given in December 2013 by Armada Kraken Pte.Ltd, a wholly owned subsidiary of the Malaysia based international offshore oilfield services provider, Bumi Armada.The project will comprise the EPC delivery of two identical power generation modules, each housing two 16-cylinder Wärtsilä 50DF multi-fuel engines with generators, waste heat recovery units and all related fuel, oil and air and other utility systems. 


The modules are designed by Wärtsilä Ship Design. The engines are capable of being operated on a variety of fuel types, including treated well gas, heavy crude oil, and marine diesel oil (MDO). The ability to utilise produced gas and crude means that little or no MDO will need to be shipped to the FPSO. This will notably reduce operating costs. Furthermore, the efficient gas-fired power solution will have significantly lower levels of CO2 emissions compared to conventional technologies.


Bumi Armada enters North Sea market with Kraken FPSO Deal


Bumi Armada will be using a recently built Suezmax tanker for the FPSO conversion, which will have a storage capacity of 600,000 barrels. The Wärtsilä equipment will be delivered in mid 2015, and the FPSO is scheduled to start the production at the Kraken field in 2016.


“Wärtsilä is the marine and oil & gas industries’ leading solutions and services provider of power solutions. Our vast experience with multi-fuel technology and our ability to integrate complex projects provide the level of reliability that global operators expect. This engagement with Bumi Armada endorses the fact that our integrated power module solutions offer the critical fuel flexibility and the high levels of efficiency and availability that successful offshore operations demand,” says Magnus Miemois, Vice President Solutions, Wärtsilä Ship Power.


The Kraken oilfield development is one of the largest new oilfields in the U.K. sector of the North Sea, and among the largest investments announced for this sector in 2013. Approximately 140 million barrels of heavy oil are expected to be extracted from the Kraken field over the coming 25 years.

Most Read Today
see see
OTC Brasil 2025
Experts warn regulatory instability threatens US$100 bil...
28/10/25
International Company News
Sercel Awarded Major Contract by ONGC to Supply Sercel 5...
28/10/25
Record
Petrobras announces production record of FPSO Almirante ...
28/10/25
OTC Brasil 2025
Event brings together global offshore industry leaders a...
28/10/25
OTC Brasil 2025
Petrobras participates in OTC Brasil 2025, in Rio de Janeiro
28/10/25
Petrobras
Petrobras produced 3.14 million barrels of oil equivalen...
27/10/25
FIRJAN
By 2035+, Rio de Janeiro State’s Energy Potential Could ...
23/10/25
Pre-Salt
PPSA to auction in December the first share of governmen...
23/10/25
Auction
Petrobras wins auction and leases RDJ07 terminal at the ...
23/10/25
Permanent Offer
Equinor acquires two new blocks in the Campos Basin duri...
23/10/25
OTC Brasil 2025
OTC Brasil 2025 Kicks Off in One Week with a Packed Prog...
22/10/25
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.