FPSO

P-66 hull on its way for integration in Angra dos Reis

On Monday, December 8, Petrobras began transporting the hull of P-66, the first platform in a series of eight “replicant” FPSOs being constructed to meet oil production demands in Brazil.

Petrobras Agency
10/12/2014 17:16
P-66 hull on its way for integration in Angra dos Reis Imagem: Petrobras Agency Visualizações: 1813 (0) (0) (0) (0)

On Monday, December 8, Petrobras began transporting the hull of P-66, the first platform in a series of eight “replicant” FPSOs (floating production, storage and offloading units) being constructed to meet oil production demands in Brazil. This is the first FPSO hull completely built in the country.

 

Having left the Rio Grande 1 shipyard, located in the city of Rio Grande, state of Rio Grande do Sul, the first replicant hull is now on its way to the Brasfels shipyard, in Angra dos Reis, Rio de Janeiro, where it is expected to arrive on December 18. At Brasfels, the modules will be installed on the hull, and equipment and systems will be integrated, interconnected and tested.

 

P-66 will be deployed in the Lula field, on the Lula South module, in the pre-salt layer of Santos Basin, operated by Petrobras (65%) in partnership with BG E&P Brasil (25%) and Petrogal Brasil (10%).

 

Details of P-66 hull:

Width of hull: 54 m

Depth (from centerline to full height of hull): 31.5 m

Maximum draft: 23.1 m

Total weight: 353,500 metric tons

Weight of steel: 42,800 metric tons

 

Details of complete FPSO:

To be moored at a water depth of 2,200 m

Total length: 288 m

living quarters: 110 people

Oil storage: 1,670,000 barrels

Power generation: four 25 MW turbo-generators

Processing capacity: 150,000 barrels per day of oil, and 6 million m³ per day of natural gas (maximum)

Most Read Today
see see
OTC Brasil 2025
Experts warn regulatory instability threatens US$100 bil...
28/10/25
International Company News
Sercel Awarded Major Contract by ONGC to Supply Sercel 5...
28/10/25
Record
Petrobras announces production record of FPSO Almirante ...
28/10/25
OTC Brasil 2025
Event brings together global offshore industry leaders a...
28/10/25
OTC Brasil 2025
Petrobras participates in OTC Brasil 2025, in Rio de Janeiro
28/10/25
Petrobras
Petrobras produced 3.14 million barrels of oil equivalen...
27/10/25
FIRJAN
By 2035+, Rio de Janeiro State’s Energy Potential Could ...
23/10/25
Pre-Salt
PPSA to auction in December the first share of governmen...
23/10/25
Auction
Petrobras wins auction and leases RDJ07 terminal at the ...
23/10/25
Permanent Offer
Equinor acquires two new blocks in the Campos Basin duri...
23/10/25
OTC Brasil 2025
OTC Brasil 2025 Kicks Off in One Week with a Packed Prog...
22/10/25
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.