FPSO

P-66 hull on its way for integration in Angra dos Reis

On Monday, December 8, Petrobras began transporting the hull of P-66, the first platform in a series of eight “replicant” FPSOs being constructed to meet oil production demands in Brazil.

Petrobras Agency
10/12/2014 17:16
P-66 hull on its way for integration in Angra dos Reis Imagem: Petrobras Agency Visualizações: 1814 (0) (0) (0) (0)

On Monday, December 8, Petrobras began transporting the hull of P-66, the first platform in a series of eight “replicant” FPSOs (floating production, storage and offloading units) being constructed to meet oil production demands in Brazil. This is the first FPSO hull completely built in the country.

 

Having left the Rio Grande 1 shipyard, located in the city of Rio Grande, state of Rio Grande do Sul, the first replicant hull is now on its way to the Brasfels shipyard, in Angra dos Reis, Rio de Janeiro, where it is expected to arrive on December 18. At Brasfels, the modules will be installed on the hull, and equipment and systems will be integrated, interconnected and tested.

 

P-66 will be deployed in the Lula field, on the Lula South module, in the pre-salt layer of Santos Basin, operated by Petrobras (65%) in partnership with BG E&P Brasil (25%) and Petrogal Brasil (10%).

 

Details of P-66 hull:

Width of hull: 54 m

Depth (from centerline to full height of hull): 31.5 m

Maximum draft: 23.1 m

Total weight: 353,500 metric tons

Weight of steel: 42,800 metric tons

 

Details of complete FPSO:

To be moored at a water depth of 2,200 m

Total length: 288 m

living quarters: 110 people

Oil storage: 1,670,000 barrels

Power generation: four 25 MW turbo-generators

Processing capacity: 150,000 barrels per day of oil, and 6 million m³ per day of natural gas (maximum)

Most Read Today
see see
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
International Company News
Alkhorayef Petroleum Company acquires GRC Technologies, ...
01/10/25
Pre-Salt
FPSO P-78 arrives at the Búzios Field
01/10/25
RD&I
Brazil Has the Capacity to Develop Its Own Technology fo...
01/10/25
Equatorial Margin
Ibama Approves Pre-Operational Assessment (APO) Conducte...
26/09/25
Sustainable Aviation
Embraer Advances SAF Studies Following Acquisition of Bi...
26/09/25
International Company News
ExxonMobil Guyana Expands Capacity With Seventh Offshore...
24/09/25
International Company News
More LNG for Europe
24/09/25
International Company News
Viking Completes Milestone Delivery to African Energy Pr...
24/09/25
Company News
CHC Helicopter Opens Hangar at Farol de São Tomé Helipor...
22/09/25
International Company News
“Sercel supplies sensors and trucks for major North Afri...
22/09/25
Geological Studies
R&D Clause Enables Project to Strengthen Critical Minera...
15/09/25
Fuels
ANP Approves Pilot Project with New Fuel Inspection Equi...
15/09/25
RD&I
Sensor Developed by Unicamp and UnB Advances in Internat...
15/09/25
Event
ABPIP Hosts SMS Oil & Gas Meeting Focused on Leadership,...
15/09/25
International
Petrobras announces participation in exploratory block i...
15/09/25
REVAP
Revap Maintenance Shutdown Involves R$ 1 Billion Investment
15/09/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.