Pre-Salt

Petrobras begins contracting for the construction of FPSO Búzios 12

New production vessel will consolidate Búzios as Petrobras' largest producer and serve as a hub for exporting natural gas produced from other units in the field

Petrobras Agency
03/10/2025 16:30
Petrobras begins contracting for the construction of FPSO Búzios 12 Imagem: André Ribeiro / Petrobras Agency Visualizações: 140 (0) (0) (0) (0)

Petrobras began, this Friday (10/3), the contracting process for the construction of FPSO Búzios 12, which will be installed in the Santos Basin, in the state of Rio de Janeiro. The new unit, P-91, will be the 12th platform assigned to the Búzios field, consolidating it as the company's largest producing field and increasing its importance in supplying natural gas in the country.
 
Búzios 12 will operate as a hub for exporting gas produced in Búzios. In addition to having systems to process and separate its own production, the unit will also be able to export gas produced in other platforms in the field that were not originally designed for gas export.
 
With this solution, Petrobras ensures the utilization of Búzios gas and the expansion of natural gas supply to the Brazilian market. The transported gas will be directed to the Boaventura Energy Complex, in Itaboraí (RJ), through the Rota 3 pipeline until it reaches the coast.
 
The P-91 will be interconnected to 16 wells, consisting of 8 producers and 8 alternating water and gas injectors, with a capacity to produce 180,000 barrels of oil per day and 12 million m³/day of natural gas. The development of Búzios 12 aims to expand the reservoir's production, adding economic value to the field, in partnership with CNPC (China National Petroleum Corporation, 3.67%) and CNOOC (China National Offshore Oil Corp, 7.34%), with Petrobras as the operator (88.99%).
 
Búzios is already on track to surpass Tupi as the company's largest producing field, and the new unit reinforces this growth trajectory.
 
"Starting the contracting process for Búzios 12 on Petrobras' anniversary is symbolic: it demonstrates the strength of our capacity for innovation and the work of generations of professionals committed to the country. This new unit expands the supply of natural gas to the Brazilian market, ensuring safe, competitive energy that is indispensable for a just energy transition. The P-91 is already being designed with solutions to increase gas supply to the market, reduce emissions, and improve energy efficiency, reflecting Petrobras' mission: to generate wealth for Brazilian society with responsibility and sustainability," said the company's president, Magda Chambriard.
 
For this contracting process, Petrobras is adopting the BOT (Build-Operate-Transfer) model, in which the contracted company is responsible for the design, construction, assembly, and operation of the asset for an initial period defined in the contract. Later, the operation will be transferred to Petrobras.

Companies interested in participating in the Búzios 12 contracting process will have 180 days, starting from the publication of the Request for Proposal (RFP), to submit their proposals. The RFP establishes a minimum local content requirement of 25%.

Most Read Today
see see
Production
Brazil’s Federal Government Oil and Natural Gas Producti...
11/09/25
Rio Pipeline & Logistics 2025
Brazil and Argentina Close to Agreement on Natural Gas T...
11/09/25
Rio Pipeline & Logistics 2025
ITP Brasil showcases high-performance engineering soluti...
10/09/25
Rio Pipeline & Logistics 2025
Overview of investments in pipeline and logistics infras...
10/09/25
Rio Pipeline & Logistics 2025
Young talents present innovative solutions at the Young ...
10/09/25
Rio Pipeline & Logistics 2025
Ministry of Ports and Airports aims to expand the role o...
10/09/25
Auction
PPSA makes available access to the Hybrid Data Package f...
10/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
FIRJAN
Brazilian industry records four consecutive months witho...
03/09/25
Copel
EPE President presents future outlook for the power sector
03/09/25
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2