Petrobras Agency
Petrobras informs that it obtained on 04/28/2023, authorization from the National Agency of Petroleum, Natural Gas and Biofuels (ANP) to resume production from 6 more facilities located in the fields of Taquipe, Buracica, Fazenda Alvorada, Rio do Bu, and Cidade de Entre Rios, thus continuing the disinterdiction works at the Bahia Terra Cluster.
The company started the operational procedures required for the safe return of the production process of these facilities which, added to the production of the facilities previously authorized for operational return, will allow the reestablishment of approximately 43% of the total production of the Bahia Terra Cluster.
The Cluster's operations were paralyzed by an ANP decision and Petrobras has been making all efforts to meet the conditions set by the regulator and to ensure the Bahia Terra Cluster's facilities are back in operation in the shortest possible time.
Contact us