LNG

Petrobras on leasing of the LNG Regasification Terminal

Petrobras Agency
02/10/2020 18:31
Visualizações: 964 (0) (0) (0) (0)

Petrobras, following up on the releases disclosed on 08/03/2020 and 09/29/2020, informs that on September 30, 2020, the Public Session was held in person to open the commercial bids of the bidders interested in the leasing of the Bahia LNG Regasification Terminal (TR-BA) and associated facilities, and the following companies attended:

 

• BP Energy do Brasil LTDA:

Registered the request to postpone the opening of commercial proposals to eventually solve pending issues and state that it intends to present its answers to the integrity questionnaire to allow Petrobras to grade the company's integrity risk. At the time, BP informed that the commercial proposal to be presented would be indicative and non-binding, not having signed the declaration of compliance with the requirements of the bidding process call, an essential document of the bidding process. In view of these facts, no commercial proposal was received.

 

• Compass Gás e Energia S.A.:

Presented letter of decline of the commercial proposal. In addition, it informed that it has already sent the integrity form answered to Petrobras and corroborates with the importance of compliance and evaluation of the company's integrity risk rating.

 

• Golar Power Comercializadora de Gás Natural LTDA:

Registered its opposition to the request made by BP for understanding it contrary to the terms of the Bidding Process Call and registered that he will forward an integrity questionnaire to allow Petrobras to grade the company's integrity risk and corroborates the importance of compliance and assessment of the company's integrity risk grade. A commercial proposal was received.

 

In the scope of the stages of (i) verification of effectiveness, in order to guarantee the alignment with the requirements of the Public Notice; and (ii) qualification, the integrity/compliance requirements were verified, having been assigned a high Risk Grade of Integrity (RGI) for the company Golar Power Comercializador de Gás Natural LTDA, implying its disqualification from the contest based on items 5.1.1 and 10.6.4 of the Bidding Process Call.

 

The bidding process enters its recursal phase. If the contest is closed without valid proposals having been obtained by Petrobras, the company will carry out a new bidding process.

 

About the terminal 

The TR-BA consists of a pier type island with all the necessary facilities for mooring a Floating Storage and Regasification Unit (FRSU) vessel directly to the pier and a supply vessel on the port side of the FSRU. LNG transfer is done directly between the FSRU and the suppressor in the side-by-side configuration. The maximum regasification flow rate of TR-BA is 20 million m³/d (@ 1 atm and 20°C). The FSRU is not part of the TR-BA lease process.

 

The integrated gas pipeline is 45 km long and 28 inches in diameter, connecting the TR-BA to two delivery points, the São Francisco do Conde Pressure Reduction Station and the São Sebastião do Passé Flow Control Station.

 

Also included in the scope of the transaction are the equipment for power generation and supply located at the Madre de Deus Waterway Terminal (TEMADRE), members of the TR-BA.

Most Read Today
see see
BOGE2026
Smart Control Gains Prominence at Bahia Oil & Gas Energy...
09/06/26
BOGE2026
Bahia Oil & Gas Energy Concludes Historic Edition and Se...
06/06/26
Branded Content
Boaventura Energy Complex drives Brazil’s energy future ...
06/06/26
BOGE2026
Mayekawa do Brasil present at Bahia Oil & Gas Energy
06/06/26
BOGE2026
Benel Marks Presence at Bahia Oil & Gas Energy and Annou...
02/06/26
BOGE2026
Bahiagás Highlights Bahia’s Leading Role in the Energy T...
30/05/26
Investments
Petrobras Announces Investments of More Than R$ 70 Billi...
30/05/26
BOGE2026
Oil States Reinforces Commitment to Innovation and Opera...
29/05/26
BOGE2026
PetroReconcavo Discusses the Future of Oil and Gas at Ba...
29/05/26
BOGE2026
Lumina Group Makes Its Presence Felt at Bahia Oil & Gas ...
29/05/26
BOGE2026
Bahia Brings Together Industry, Innovation, and Business...
28/05/26
Royalties
Amounts related to March production for concession and t...
28/05/26
BOGE2026
Oil & Gas Expansion Boosts Demand for Industrial Waste T...
28/05/26
BOGE2026
BRAVA Energia Marks Presence at Bahia Oil & Gas Energy 2...
27/05/26
IBP
Brazil Can Expand Its Prominence as a Global Energy Supp...
27/05/26
Investments
Petrobras and Transpetro announce R$ 2.8 billion in inve...
27/05/26
International Company News
Jumbo orders a new class of versatile heavy lift vessels
27/05/26
BOGE2026
The Largest Oil and Gas Event in the North and Northeast...
25/05/26
BOGE2026
With production on the rise, independent players lead di...
25/05/26
ANP
ANP Workshop Debates Boosting Oil and Gas Exploration in...
25/05/26
BOGE2026
ANP participates in Bahia Oil & Gas Energy 2026, in Salvador
25/05/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.