Santos Basin

Petrobras on the start of P-71 production

T&B Petroleum/Petrobras Agency
26/12/2022 16:35
Petrobras on the start of P-71 production Imagem: Petrobras Agency Visualizações: 3163 (0) (0) (0) (0)

Petrobras informs that it put into operation, last Wednesday (Dec,21), the P-71 platform vessel, installed in the Itapu field, in the Santos Basin pre-salt area, 200 km off the coast of Rio de Janeiro. The start of production has been anticipated, as it was originally scheduled for 2023.

From Petrobras' own platform portfolio, the P-71 is an FPSO (floating unit for the production, storage, and transfer of oil and gas) type with capacity to process up to 150,000 barrels of oil and 6 million m³ of gas per day, in addition to storing up to 1.6 million barrels of oil.

“We were able to anticipate the production of the P-71 platform, which was originally scheduled for 2023. We will also be able to anticipate the ramp-up (production evolution), which is excellent news not only for Petrobras but also for the country, which will receive the royalties from this production earlier," says Petrobras' Chief Production Development Officer, João Henrique Rittershaussen.

Positioned in a water depth of 2,010 meters, the P-71 will be the only one to produce in the Itapu field, fully operated by Petrobras under the Transfer of Rights and Production Sharing regimes. The company expects the unit to reach its maximum production capacity in 2023.

The P-71 is the sixth and last of the series of replicant platforms operated by Petrobras. These units are characterized by a standardized engineering design, high production capacity, and advanced technologies for operation and reduction of greenhouse gas emissions. One of the unit's low-carbon technologies is the so-called FGRU (Flare Gas Recovery Unity) system, which contributes to a greater utilization of the produced gas and reduction of emissions.

Most Read Today
see see
ADIPEC 2025
ADIPEC 2025 Day 3: Energy, finance and technology leader...
07/11/25
Results
Petrobras reaches net income of R$ 32.7 billion in the t...
07/11/25
Cop30
IBP Advocates Global Criteria for a Just Energy Transition
07/11/25
Offshore
Decommissioning Takes Center Stage
07/11/25
Natural Gas
ANP Approves Action Plan on Gas Pipeline Transportation ...
07/11/25
ADIPEC 2025
AI is no longer a side project: Technology leaders at AD...
05/11/25
Environment
ANP Holds Workshop on Methane Emissions in Partnership w...
05/11/25
International Event
International Energy Event Opens Registration for Activities
05/11/25
RD&I
Norway and Brazil Launch New Joint Research Funding Call...
05/11/25
Partnership
DeepOcean and Jana Marine enter Saudi Arabia subsea part...
04/11/25
ADIPEC 2025
ADIPEC 2025: Industry calls for policy pragmatism, embra...
04/11/25
ADIPEC 2025
Johnson Matthey: Leadership and Innovation Driving the G...
31/10/25
OTC Brasil 2025
OTC Brazil connects the Equatorial Margin’s potential to...
30/10/25
OTC Brasil 2025
New Version of ANP’s Greenhouse Gas Emissions Dynamic Da...
30/10/25
OTC Brasil 2025
Port of Açu and IKM Advance Partnership to Create Brazil...
30/10/25
OTC Brasil 2025
Port of Açu and SISTAC Sign Agreement to Provide Decommi...
29/10/25
Royalties
Royalties from August Production Distributed to States a...
29/10/25
OTC Brasil 2025
iUP Innovation Connections Links Innovation Strategy to ...
29/10/25
ANP
Permanent Production Sharing Offer: Registered Companies...
29/10/25
OTC Brasil 2025
Firjan Showcases Technology and Innovation Solutions for...
29/10/25
OTC Brasil 2025
O&G exploration is key to social development and a just ...
28/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.