Pre-Salt

Petrobras starts production from FPSO Guanabara in the Mero field, in the pre-salt of Santos Basin

T&B Petroleum/Petrobras Agency
04/05/2022 20:44
Petrobras starts production from FPSO Guanabara in the Mero field, in the pre-salt of Santos Basin Imagem: Courtesy Modec Visualizações: 2446 (0) (0) (0) (0)

On April 30, Petrobras started producing oil and natural gas through the FPSO Guanabara, the first definitive production system installed in the Mero field, in the Santos Basin pre-salt.

 

The platform, an FPSO (floating unit for the production, storage, and transfer of oil and gas) type, is capable of processing up to 180 thousand barrels of oil and 12 million m3 of gas, which represents 6% of the production operated by Petrobras, contributing to the company's expected production growth. Mero is the third biggest pre-salt oil field (behind only Búzios and Tupi).

 

The platform arrived at the Mero field in late January 2022. During this period, it was connected to wells and subsea equipment, and underwent final tests before starting production. In the first wave, six producing wells and seven injectors will be connected to the FPSO. The platform is expected to reach peak production by the end of 2022.

 

Built and operated by Modec, the unit is located more than 150 km off the coast of the state of Rio de Janeiro in water depths that reach 1,930 meters.

 

FPSO Guanabara has gas re-injection systems, where the gas production with 45% carbon dioxide (CO2) content, after self-consumption in the FPSO, will be all re-injected into the reservoir to maintain pressure and improve oil recovery, in addition to reducing the release of CO2 into the atmosphere. The gas re-injection will be done alternately with water injection (Water Alternating Gas - WAG).

 

Additionally, the Mero field is developing an unprecedented technology to separate, on the seabed, CO2-rich gas from oil for reinjection from the seabed, reducing the amount of gas reaching the FPSO, thus increasing the FPSO's availability to oil and the project's efficiency.

 

The Mero 1 project is part of one of the most robust CO2 capture, use and geological storage programs in the world - called CCUS. These initiatives are aligned with Petrobras' commitment to reduce carbon intensity in the Exploration & Production area by 32% by 2025.

 

The unitized Mero field is operated by Petrobras (38.6%), in partnership with Shell Brasil Petroléo Ltda (19.3%), TotalEnergies EP Brasil Ltda. (19.3%), CNODC Brasil Petróleo e Gás Ltda (9.65%), CNOOC Petroleum Brasil Ltda (9.65%) and Pré-Sal Petróleo S.A-PPSA (3.5%), as the Federal Union's representative in the non-contracted area.

Most Read Today
see see
Sergipe Oil & Gas 2025
Sergipe Reinforces National Leadership in the Energy Sec...
24/07/25
Sergipe Oil & Gas 2025
Sergipe’s Oil and Gas Potential Highlighted at SOG25 Opening
23/07/25
Sergipe Oil & Gas 2025
Sergas Participates in Sergipe Oil & Gas 2025 with Focus...
23/07/25
Sergipe Oil & Gas 2025
Fourth Edition of Sergipe Oil & Gas Highlights State’s R...
23/07/25
RD&I
ANP Holds Workshop on Private Equity Investment Fund (FIP)
23/07/25
Campos Basin
Petrobras announces Approval of the Production Individua...
23/07/25
ADIPEC 2025
ADIPEC 2025 Technical Conferences achieve record submiss...
22/07/25
People
BCCK names Andres Martinez as business development manager
21/07/25
Fenasucro
Brazil Holds Global Leadership in Renewable Cogeneration...
21/07/25
Results
Revap Achieves Historic Records in H1 with S10 Diesel an...
21/07/25
Solar Energy
Transpetro Inaugurates Solar Plant to Supply the Belém T...
21/07/25
Company News
Strohm completes successful field trials for Petrobras
16/07/25
Natural Gas
Gasmig: 39 Years of Energy, Innovation, and Commitment t...
16/07/25
Sustainability
Foresea earns Social Seal and reports significant result...
11/07/25
Results
Oil and Gas Sector Leads Dividend Distribution in 2024 w...
10/07/25
Natural Gas
Comgás Receives 41 Proposals in Public Call for Natural ...
10/07/25
People
Lucas Mota de Lima Appointed Executive Manager of ABPIP
10/07/25
Biomethane
Presidente Prudente (SP) Begins R$12 Million Biomethane ...
10/07/25
E&P
Hitachi Energy to evaluate electrification of offshore p...
10/07/25
Digitalization
TGS and Equinor Collaborate to Drive Digital Transformat...
10/07/25
People
Julia Cruz Appointed as New Secretary of Green Economy, ...
03/07/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2