Pre-Salt

Petrobras starts production from FPSO Guanabara in the Mero field, in the pre-salt of Santos Basin

T&B Petroleum/Petrobras Agency
04/05/2022 20:44
Petrobras starts production from FPSO Guanabara in the Mero field, in the pre-salt of Santos Basin Imagem: Courtesy Modec Visualizações: 1557 (0) (0) (0) (0)

On April 30, Petrobras started producing oil and natural gas through the FPSO Guanabara, the first definitive production system installed in the Mero field, in the Santos Basin pre-salt.

 

The platform, an FPSO (floating unit for the production, storage, and transfer of oil and gas) type, is capable of processing up to 180 thousand barrels of oil and 12 million m3 of gas, which represents 6% of the production operated by Petrobras, contributing to the company's expected production growth. Mero is the third biggest pre-salt oil field (behind only Búzios and Tupi).

 

The platform arrived at the Mero field in late January 2022. During this period, it was connected to wells and subsea equipment, and underwent final tests before starting production. In the first wave, six producing wells and seven injectors will be connected to the FPSO. The platform is expected to reach peak production by the end of 2022.

 

Built and operated by Modec, the unit is located more than 150 km off the coast of the state of Rio de Janeiro in water depths that reach 1,930 meters.

 

FPSO Guanabara has gas re-injection systems, where the gas production with 45% carbon dioxide (CO2) content, after self-consumption in the FPSO, will be all re-injected into the reservoir to maintain pressure and improve oil recovery, in addition to reducing the release of CO2 into the atmosphere. The gas re-injection will be done alternately with water injection (Water Alternating Gas - WAG).

 

Additionally, the Mero field is developing an unprecedented technology to separate, on the seabed, CO2-rich gas from oil for reinjection from the seabed, reducing the amount of gas reaching the FPSO, thus increasing the FPSO's availability to oil and the project's efficiency.

 

The Mero 1 project is part of one of the most robust CO2 capture, use and geological storage programs in the world - called CCUS. These initiatives are aligned with Petrobras' commitment to reduce carbon intensity in the Exploration & Production area by 32% by 2025.

 

The unitized Mero field is operated by Petrobras (38.6%), in partnership with Shell Brasil Petroléo Ltda (19.3%), TotalEnergies EP Brasil Ltda. (19.3%), CNODC Brasil Petróleo e Gás Ltda (9.65%), CNOOC Petroleum Brasil Ltda (9.65%) and Pré-Sal Petróleo S.A-PPSA (3.5%), as the Federal Union's representative in the non-contracted area.

Most Read Today
see see
International Company News
Fulkrum Successfully Completes Vendor Surveillance for S...
14/03/25
E&P
Operational Safety: ANP Launches Dynamic Incident Panel ...
10/03/25
Ethanol
Anhydrous and Hydrated Ethanol Close Lower in a Week Sho...
10/03/25
International Women's Day
Celebrating Women's Day, Mobil™ Brings Drivers Antonella...
10/03/25
International Women's Day
Female Leadership in the Chemical Industry: Braskem Rein...
10/03/25
International Women's Day
Women in the Electric Sector: Driving Advances and Trans...
10/03/25
Merger
Saipem and Subsea7 join forces to create Saipem7
25/02/25
Royalties
Values related to December's production for production-s...
24/02/25
Drilling Operations
Constellation Oil Services Holding S.A. announces intent...
21/02/25
Permanent Offer
CNPE Approves Inclusion of Four New Pre-Salt Blocks in t...
21/02/25
Royalties
Values related to December production for concession and...
21/02/25
Natural Gas
Eneva and Samarco Sign Contract for Natural Gas Supply i...
21/02/25
Results
Four FPSOs operated by MODEC rank among the 10 largest o...
20/02/25
Record
Fulkrum Achieves Record Growth in 2024 with Global Expan...
20/02/25
Results
Foresea Closes 2024 with a Net Profit of $18 Million and...
20/02/25
Results
Sergipe Maintains 1st Place in the Free Gas Market Ranking
10/02/25
International Company News
Interocean awarded Morgan, Mona, and Morven Offshore Win...
06/02/25
Natural Gas
ANP approves prior consultation aiming at new regulation...
06/02/25
Permanent Offer
Permanent Sharing Offer (OPP): ANP approves update of th...
06/02/25
Paraná
Renewable energy with savings of up to 35% drives the ex...
06/02/25
Pre-Salt
PPSA launches a new spot sale process for Union oil carg...
06/02/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.