Santos Basin

Pre-salt: Equinor starts drilling in the Bacalhau field

The Phase 1 drilling campaign for Bacalhau comprises 19 wells in total

T&B Petroleum/Press Office
03/11/2022 16:35
Pre-salt: Equinor starts drilling in the Bacalhau field Imagem: Divulgation Visualizações: 2949 (0) (0) (0) (0)

Equinor Brasil, on behalf of the partners in the Bacalhau project, informs that Seadrill Management has safely started the drilling phase of the field. Drilling activities are being carried out by West Saturn, a rig adapted for subsea depths of up to 3,600 meters. The Bacalhau field is located in the Santos Basin, at a depth of more than 2,000 meters.

“The start of drilling at Bacalhau is an important milestone for Equinor's growing portfolio in Brazil. We have contracted a sixth-generation, high-tech rig for the first phase of the drilling campaign. It is expected to generate around three thousand jobs during the development phase of Bacalhau, which means more local value for our country”, says Veronica Coelho, president of Equinor Brasil.

The West Saturn is equipped with features such as a dual turret and automatic drill control. The contract duration with Seadrill is four years, including four one-year extension options. The contract encompasses mobilization, modernization and integrated services.

In addition to West Saturn, a second rig contract was announced in July 2022 for Bacalhau. It was granted to Valaris and comprises a duration of 540 days, with an expected start date for 2023. In total, the Phase 1 Cod drilling campaign will have 19 wells.

Once in production, Phase 1 of the Bacalhau field is expected to produce 220,000 barrels per day on the plateau. The Cod FPSO (Floating Storage and Offloading Unit) will also be the lowest emission autonomous vessel in the world due to the use of highly efficient Combined Cycle Gas Turbines (CCGTs). The use of this technology will reduce emissions by 110 thousand tons annually.

The partners in Bacalhau are: Equinor (40%, operator), ExxonMobil (40%), Petrogal Brasil (20%) and Pré-Sal Petróleo S.A. (PPSA, manager of the sharing agreement; non-investor).

Facts

  • Discovery was made by Petrobras in 2012
  • Equinor becomes operator in 2016
  • Bacalhau will be the first pre-salt field to be developed by an international operator
  • It is located 185 km off the coast of the municipality of Ilhabela/SP, in the state of São Paulo, in underwater depths of more than 2,000 meters.
  • Phase 1 development capacity: 220,000 bbls/day
Most Read Today
see see
Rio Pipeline & Logistics 2025
Tanacas celebrates 25 years with the launch of the Smart...
11/09/25
Rio Pipeline & Logistics 2025
Offshore Projects to Strengthen Energy Security in Brazi...
11/09/25
Rio Pipeline & Logistics 2025
IBP Booth Hosts Inspiring Debate on Women in Midstream a...
11/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline 2025 Exhibition Showcases Innovations in En...
11/09/25
Production
Brazil’s Federal Government Oil and Natural Gas Producti...
11/09/25
Rio Pipeline & Logistics 2025
Brazil and Argentina Close to Agreement on Natural Gas T...
11/09/25
Rio Pipeline & Logistics 2025
ITP Brasil showcases high-performance engineering soluti...
10/09/25
Rio Pipeline & Logistics 2025
Overview of investments in pipeline and logistics infras...
10/09/25
Rio Pipeline & Logistics 2025
Young talents present innovative solutions at the Young ...
10/09/25
Rio Pipeline & Logistics 2025
Ministry of Ports and Airports aims to expand the role o...
10/09/25
Auction
PPSA makes available access to the Hybrid Data Package f...
10/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.