Offshore

Production from KBM fields off Peninsular Malaysia to Peak at 13,000 BOPD

The KBM Cluster is an eight-year development project.

Petra Energy Berhad
05/02/2014 12:33
Visualizações: 2209 (0) (0) (0) (0)

 

Petra Energy Berhad reported yesterday that the country's state-owned firm Petroliam Nasional Berhad (Petronas) had announced the first oil production from the Kapal, Banang & Meranti (KBM) Cluster fields, offshore Peninsular Malaysia which commenced Dec. 16, 2013.
The KBM Cluster, operated by Coastal Energy KBM Sdn Bhd, was developed with the JV (joint venture) partner of the Company under a Risk Service Contract (RSC) since June 2012. This is the third RSC that has successfully achieved oil production, after the Balai Cluster and Berantai Fields.
The KBM Cluster is an eight-year development project with Kapal being in its first development and production phase. The Kapal field facilities consist of one mobile offshore production unit (MOPU), one storage tanker with approximately 600,000 barrels capacity, one drilling rig with an attached well bay module and two flexible flow lines.
According to Petronas, through this mobile offshore production concept, there is plan to continue determining the potential production from the three KBM fields. The initial production rates from the cluster were over 10,000 barrels of oil per day (bopd), with peak production reaching 13,000 bopd.
The content of the above Announcement was approved by Petronas Jan. 29.

Petra Energy Berhad reported yesterday that the country's state-owned firm Petroliam Nasional Berhad (Petronas) had announced the first oil production from the Kapal, Banang & Meranti (KBM) Cluster fields, offshore Peninsular Malaysia which commenced Dec. 16, 2013.


The KBM Cluster, operated by Coastal Energy KBM Sdn Bhd, was developed with the JV (joint venture) partner of the Company under a Risk Service Contract (RSC) since June 2012. This is the third RSC that has successfully achieved oil production, after the Balai Cluster and Berantai Fields.


The KBM Cluster is an eight-year development project with Kapal being in its first development and production phase. The Kapal field facilities consist of one mobile offshore production unit (MOPU), one storage tanker with approximately 600,000 barrels capacity, one drilling rig with an attached well bay module and two flexible flow lines.


According to Petronas, through this mobile offshore production concept, there is plan to continue determining the potential production from the three KBM fields. The initial production rates from the cluster were over 10,000 barrels of oil per day (bopd), with peak production reaching 13,000 bopd.

 

Most Read Today
see see
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
International Company News
Alkhorayef Petroleum Company acquires GRC Technologies, ...
01/10/25
Pre-Salt
FPSO P-78 arrives at the Búzios Field
01/10/25
RD&I
Brazil Has the Capacity to Develop Its Own Technology fo...
01/10/25
Equatorial Margin
Ibama Approves Pre-Operational Assessment (APO) Conducte...
26/09/25
Sustainable Aviation
Embraer Advances SAF Studies Following Acquisition of Bi...
26/09/25
International Company News
ExxonMobil Guyana Expands Capacity With Seventh Offshore...
24/09/25
International Company News
More LNG for Europe
24/09/25
International Company News
Viking Completes Milestone Delivery to African Energy Pr...
24/09/25
Company News
CHC Helicopter Opens Hangar at Farol de São Tomé Helipor...
22/09/25
International Company News
“Sercel supplies sensors and trucks for major North Afri...
22/09/25
Geological Studies
R&D Clause Enables Project to Strengthen Critical Minera...
15/09/25
Fuels
ANP Approves Pilot Project with New Fuel Inspection Equi...
15/09/25
RD&I
Sensor Developed by Unicamp and UnB Advances in Internat...
15/09/25
Event
ABPIP Hosts SMS Oil & Gas Meeting Focused on Leadership,...
15/09/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2