Offshore

Production from KBM fields off Peninsular Malaysia to Peak at 13,000 BOPD

The KBM Cluster is an eight-year development project.

Petra Energy Berhad
05/02/2014 12:33
Visualizações: 2211 (0) (0) (0) (0)

 

Petra Energy Berhad reported yesterday that the country's state-owned firm Petroliam Nasional Berhad (Petronas) had announced the first oil production from the Kapal, Banang & Meranti (KBM) Cluster fields, offshore Peninsular Malaysia which commenced Dec. 16, 2013.
The KBM Cluster, operated by Coastal Energy KBM Sdn Bhd, was developed with the JV (joint venture) partner of the Company under a Risk Service Contract (RSC) since June 2012. This is the third RSC that has successfully achieved oil production, after the Balai Cluster and Berantai Fields.
The KBM Cluster is an eight-year development project with Kapal being in its first development and production phase. The Kapal field facilities consist of one mobile offshore production unit (MOPU), one storage tanker with approximately 600,000 barrels capacity, one drilling rig with an attached well bay module and two flexible flow lines.
According to Petronas, through this mobile offshore production concept, there is plan to continue determining the potential production from the three KBM fields. The initial production rates from the cluster were over 10,000 barrels of oil per day (bopd), with peak production reaching 13,000 bopd.
The content of the above Announcement was approved by Petronas Jan. 29.

Petra Energy Berhad reported yesterday that the country's state-owned firm Petroliam Nasional Berhad (Petronas) had announced the first oil production from the Kapal, Banang & Meranti (KBM) Cluster fields, offshore Peninsular Malaysia which commenced Dec. 16, 2013.


The KBM Cluster, operated by Coastal Energy KBM Sdn Bhd, was developed with the JV (joint venture) partner of the Company under a Risk Service Contract (RSC) since June 2012. This is the third RSC that has successfully achieved oil production, after the Balai Cluster and Berantai Fields.


The KBM Cluster is an eight-year development project with Kapal being in its first development and production phase. The Kapal field facilities consist of one mobile offshore production unit (MOPU), one storage tanker with approximately 600,000 barrels capacity, one drilling rig with an attached well bay module and two flexible flow lines.


According to Petronas, through this mobile offshore production concept, there is plan to continue determining the potential production from the three KBM fields. The initial production rates from the cluster were over 10,000 barrels of oil per day (bopd), with peak production reaching 13,000 bopd.

 

Most Read Today
see see
International
Petrobras announces participation in exploratory block i...
15/09/25
REVAP
Revap Maintenance Shutdown Involves R$ 1 Billion Investment
15/09/25
Rio Pipeline & Logistics 2025
Tanacas celebrates 25 years with the launch of the Smart...
11/09/25
Rio Pipeline & Logistics 2025
Offshore Projects to Strengthen Energy Security in Brazi...
11/09/25
Rio Pipeline & Logistics 2025
IBP Booth Hosts Inspiring Debate on Women in Midstream a...
11/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline 2025 Exhibition Showcases Innovations in En...
11/09/25
Production
Brazil’s Federal Government Oil and Natural Gas Producti...
11/09/25
Rio Pipeline & Logistics 2025
Brazil and Argentina Close to Agreement on Natural Gas T...
11/09/25
Rio Pipeline & Logistics 2025
ITP Brasil showcases high-performance engineering soluti...
10/09/25
Rio Pipeline & Logistics 2025
Overview of investments in pipeline and logistics infras...
10/09/25
Rio Pipeline & Logistics 2025
Young talents present innovative solutions at the Young ...
10/09/25
Rio Pipeline & Logistics 2025
Ministry of Ports and Airports aims to expand the role o...
10/09/25
Auction
PPSA makes available access to the Hybrid Data Package f...
10/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2