Petrobras

Start-up of P-75 in Búzios Field pre-salt of Santos Basin

Petrobras Agency
12/11/2018 14:34
Start-up of P-75 in Búzios Field pre-salt of Santos Basin Imagem: Divulgation Visualizações: 2040 (0) (0) (0) (0)

Petrobras informs that yesterday it has started the production of oil and natural gas in the Búzios 2 area, in the pre-salt of Santos Basin, by means of platform P-75, second unit installed in the Búzios field. 

The FPSO (floating production, storage, and offloading unit of oil and gas) is located approximately 210 km off the coast of the state of Rio de Janeiro, at a water depth of 2,000 meters. 

With a daily capacity to process up to 150,000 barrels of oil and compress up to 6 million cubic meters of natural gas, P-75 will produce through ten producing wells, also using seven injection wells. Relief vessels will be used to offload the oil production, while gas will be drained by pre-salt pipeline routes. 

P-75 is the fourth platform to start production in 2018, after the FPSO Cidade Campos dos Goytacazes in the Tartaruga Verde field, the P-67 in the Lula field and the P-74 in the Búzios field. These platforms, together with P-67, which is already located in the Lula field, and P-76, which should go to the Búzios field in December, will conclude the six systems planned for this year in Brazil, contributing to the increase of Petrobras' production in the horizon of the 2018-2022 Business and Management Plan. 

 

Divulgação 

Búzios Field 

Búzios, discovered in 2010, is the main field under the Transfer of Rights Agreement and began its production this year in April through platform P-74. 

The Transfer of Rights regime gives Petrobras the exclusive right to explore and produce up to five billion barrels of oil equivalent in the Santos Basin.

Most Read Today
see see
Permanent Offer
Equinor acquires two new blocks in the Campos Basin duri...
23/10/25
OTC Brasil 2025
OTC Brasil 2025 Kicks Off in One Week with a Packed Prog...
22/10/25
Agreement
Wärtsilä Lifecycle agreement renewed to maintain safe, r...
22/10/25
Petrobras
Petrobras receives operating license for deepwater explo...
20/10/25
Equatorial Margin
License Grant for Drilling in the Equatorial Margin Is P...
20/10/25
Equatorial Margin
ABESPetro Statement on the Licensing of the Equatorial M...
20/10/25
Energy Transition
BNDES, Petrobras, and Finep select Valetec to manage the...
20/10/25
Pre-Salt
Petrobras and PPSA sign equalization agreement for Jubar...
20/10/25
WPC Energy Youth Forum
Kuwait to Host 8th WPC Energy Youth Forum in October 2025
20/10/25
Exports
Petrobras signs contract to sell six million barrels of ...
20/10/25
Petrobras
Petrobras puts the Harpia supercomputer into operation
10/10/25
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
International Company News
Alkhorayef Petroleum Company acquires GRC Technologies, ...
01/10/25
Pre-Salt
FPSO P-78 arrives at the Búzios Field
01/10/25
RD&I
Brazil Has the Capacity to Develop Its Own Technology fo...
01/10/25
Equatorial Margin
Ibama Approves Pre-Operational Assessment (APO) Conducte...
26/09/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.