Pre-Salt

Total announces first oil in Iara field in Santos Basin pre-salt

T&B Petroleum/Press Office
22/11/2019 14:55
Visualizações: 1254 (0) (0) (0) (0)

This marked the departure of the FPSO P-68, the first of two units to operate at the Iara field in the Santos Basin. The second is the P-70 which is expected to go live by 2020 and each platform has a capacity of 150,000 barrels of oil per day.

 

On January 12, 2018, Total acquired a 22.5% stake in Block BM-S-11A, where the Iara field is located, the acquisition is part of a strategic alliance with Petrobras, which is the operator with 42.5% in the field. Shell Brasil Petróleo 25% and Petrogal Brasil 10% also participate in the consortium.

 

"The first oil from the Iara field marks a new milestone for Total in Brazil. This increases our participation in the pre-salt area where the Total operated Lapa field is located and with the ongoing extended trials in the Mero field." said Arnaud Breuillac, president of exploration and production at Total.

Most Read Today
see see
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.