Event

Workshop on revision of ANP operational safety standards takes place on 12/14

T&B Petroleum/Press Office ANP
02/12/2020 23:32
Workshop on revision of ANP operational safety standards takes place on 12/14 Imagem: Divulgation Visualizações: 2320 (0) (0) (0) (0)

ANP will hold, on 12/14, at 2 pm, the Workshop on the revision of ANP Resolution 37/2015, which regulates the operational safety inspection procedure in cases where non-conformities are identified in the performance of regulated agents, and makes other provisions.

 

Registrations for the event must be made until 12/09, by e-mail regulacaossm@anp.gov.br. Those interested in making a presentation or exhibition at the event must inform at the time of registration and must forward the presentation.

 

The objective of the event is to promote the discussion on the model adopted by the current regulation and to present proposals for the revision of the resolution, to support the work of revision and restructuring of the standard, seeking a greater alignment with the best practices, as well as between the systems of management of regulated agents and ANP's technical operational safety regulations.

 

Access to the virtual room will be a priority for those registered and, if possible, other interested parties will be admitted on a first-come, first-served basis. It should be noted that the number of participants in the event is limited by the tool to be used, Microsoft Teams (300 people).

 

A version of the draft resolution is available with the possible changes to ANP Resolution No. 37/2015, together with the non-conformity graduation manual, which will accompany it. A form was also made available to receive suggestions for possible changes to ANP Resolution No. 37/2015. The three documents can be accessed on the workshop page: Access the link!

 

The revision of ANP Resolution No. 37/2015 is foreseen in the 2020-2021 Regulatory Agenda of the ANP, and the holding of this event will allow the participation of industry and society in general in the process. All contributions received will be assessed by the ANP technical team for possible changes to ANP Resolution No. 37/2015. The draft resulting from the contributions received during the workshop will be made available and will undergo public consultation and hearing before its final publication.

Most Read Today
see see
Rio Pipeline & Logistics 2025
ITP Brasil showcases high-performance engineering soluti...
10/09/25
Rio Pipeline & Logistics 2025
Overview of investments in pipeline and logistics infras...
10/09/25
Rio Pipeline & Logistics 2025
Young talents present innovative solutions at the Young ...
10/09/25
Rio Pipeline & Logistics 2025
Ministry of Ports and Airports aims to expand the role o...
10/09/25
Auction
PPSA makes available access to the Hybrid Data Package f...
10/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
FIRJAN
Brazilian industry records four consecutive months witho...
03/09/25
Copel
EPE President presents future outlook for the power sector
03/09/25
FIRJAN
Together with CNI, Firjan launches business mission in t...
03/09/25
Gulf of America
C-Innovation completes successful decommissioning projec...
28/08/25
Equatorial Margin
Rig chartered by Petrobras arrives in Amapá to take part...
19/08/25
FIRJAN
Rio gains Firjan SENAI Metalworking Reference Center
19/08/25
RD&I
CEPETRO develops for Petrobras a tool that integrates mu...
19/08/25
Pre-Salt
Búzios Field surpasses the record level of 900 thousand ...
19/08/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2