Brazil's power regulator Aneel has authorised Iberdrola to start commercial operations at the Caetité 2 and Caetité 3 wind farms of 30MW each.
RechargeThe two plants are located in the state of Bahia and were equipped with G90, 2MW turbines supplied by Spanish turbine makers Gamesa.
Caetité 2 and 3 sold power at the renewable power auction of 2010 and were due to start operations in January 2014, but were waiting for the grid connection at Igaporã2 to be completed.
Earlier in October, Aneel authorised Iberdrola to start operating Caetité 1, which is delivering power through non-regulated market contracts.
Contact us