Companies

BW Offshore wins Catcher FPSO letter of award

Contract expected to be completed during Q2 2014.

BW Offshore
01/04/2014 13:26
Visualizações: 1055 (0) (0) (0) (0)

 

BW Offshore has signed a Letter of Award (LOA) with Premier Oil for an FPSO to operate on the Catcher oil field in the UK North Sea.
The LOA will be converted into a final contract subject to final partner sanction and Department of Energy and Climate Change (DECC) approval, expected to be completed during Q2 2014.
The field is owned by Premier Oil (50%, operator), Cairn Energy (30%) and MOL (20%). The firm charter period of the contract is 7 years, with extension options. Based on a field life of 10 years, the contract value is USD 2.3 billion including FPSO charter rate and opex.
BW Offshore was awarded a FEED study as part of a funded tender process by Premier Oil in Q4 2012, and has performed extensive engineering studies on the project during 2013 and Q1 2014.
BW Offshore’s scope includes the delivery of the FPSO, mooring system, installation and operation of the unit throughout the charter period. The FPSO will have a processing capacity of 60,000 bopd and a storage capacity of 650,000 bbl. BW Offshore will order a new built hull from Japan for the project, while conversion and integration work will be performed in Singapore. The FPSO shall be ready for production mid-2017. The project will be financed by a project specific bank facility of USD 800 million and BW Offshore’s existing liquidity.

BW Offshore has signed a Letter of Award (LOA) with Premier Oil for an FPSO to operate on the Catcher oil field in the UK North Sea.


The LOA will be converted into a final contract subject to final partner sanction and Department of Energy and Climate Change (DECC) approval, expected to be completed during Q2 2014.


The field is owned by Premier Oil (50%, operator), Cairn Energy (30%) and MOL (20%). The firm charter period of the contract is 7 years, with extension options. Based on a field life of 10 years, the contract value is USD 2.3 billion including FPSO charter rate and opex.


BW Offshore was awarded a FEED study as part of a funded tender process by Premier Oil in Q4 2012, and has performed extensive engineering studies on the project during 2013 and Q1 2014.


BW Offshore’s scope includes the delivery of the FPSO, mooring system, installation and operation of the unit throughout the charter period. The FPSO will have a processing capacity of 60,000 bopd and a storage capacity of 650,000 bbl. BW Offshore will order a new built hull from Japan for the project, while conversion and integration work will be performed in Singapore. The FPSO shall be ready for production mid-2017.

The project will be financed by a project specific bank facility of USD 800 million and BW Offshore’s existing liquidity.

Most Read Today
see see
FIRJAN
Agrega + Indústria brings together entities, companies, ...
29/07/26
SOG 2026
ABPIP brings to Sergipe Oil & Gas a debate on strengthen...
28/07/26
Event
BR Aviation presents its portfolio of customized solutio...
23/07/26
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
IBP Positioning
Change of the instrument does not fix the illegalities o...
07/07/26
Energy Summit
Energy Summit 2026: Embrapii technologies strengthen Bra...
22/06/26
Energy Summit
Biodiesel and renewable fuels move to the center of the ...
22/06/26
Natural Gas
ANP extends public consultation on the calculation of th...
22/06/26
Rio de Janeiro
Firjan’s Oil Yearbook in Rio highlights that positive pr...
22/06/26
Biomethane
With a market five times larger since 2020, the biometha...
22/06/26
Petrobras
Petrobras approves investment in bio-jet fuel and renewa...
22/06/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.