Pipeline

Caburé gas pipeline, in Bahia, receives authorization to operate definitively by ANP

T&B Petroleum/Press Office ANP
30/06/2020 20:32
Caburé gas pipeline, in Bahia, receives authorization to operate definitively by ANP Imagem: Divulgation Visualizações: 2706 (0) (0) (0) (0)

The ANP published today (6/30), in the Official Gazette (DOU), the definitive authorization for the operation, by Alvopetro, of the Caburé gas pipeline, which is part of the flow system for the production of the individualized area formed by the Cardeal do Northeast, Cardinal do Nordeste Leste, Caburé and Caburé Leste, in the Recôncavo Basin, in Bahia. The first two fields are operated by Imetame, which is the operator of the individualized area, and the last two, by Alvopetro.

 

It is an innovative solution for harnessing the gas, in which there are two forms of flow from the same individualized area (which works similarly to a field). The first, already in operation by Imetame, until the Thermoelectric Plant (UTE) Prosperidade 1, located in Camaçari, and the second, which should start operating tomorrow (1/7), for the pipeline to be operated by Alvopetro, until the Caburé Natural Gas Processing Unit (UPGN), in Mata de São João, also operated by this company.

 

After processing at UPGN, the gas will be traded with Companhia de Gás da Bahia (Bahiagás). The pipeline will greatly increase the flow capacity of the gas produced in the individualized area. To date, the highest monthly average flowed has been 140 thousand cubic meters per day (m3 / d) to the UTE, and the contract between Alvopetro and Bahiagás guarantees the supply of 300 thousand m3 / d, tripling the use of gas in the area.

 

UPGN will be the first to be operated by a company other than the Petrobras group, and may contribute to starting a decentralization of the natural gas processing market. In addition, the beginning of gas flow to the UPGN is relevant for the region of the Recôncavo Basin. The average gas available to the basin in 2020, according to the ANP's Monthly Production Bulletins, is 1,170 thousand m3 / d per day. The gas flow to be drained by the new pipeline therefore corresponds to an increase of 25% in the gas available in the basin.

Most Read Today
see see
ADIPEC 2025
From energy to intelligence to impact: ADIPEC 2025 sets ...
07/11/25
ADIPEC 2025
ADIPEC 2025 Day 3: Energy, finance and technology leader...
07/11/25
Results
Petrobras reaches net income of R$ 32.7 billion in the t...
07/11/25
Cop30
IBP Advocates Global Criteria for a Just Energy Transition
07/11/25
Offshore
Decommissioning Takes Center Stage
07/11/25
Natural Gas
ANP Approves Action Plan on Gas Pipeline Transportation ...
07/11/25
ADIPEC 2025
AI is no longer a side project: Technology leaders at AD...
05/11/25
Environment
ANP Holds Workshop on Methane Emissions in Partnership w...
05/11/25
International Event
International Energy Event Opens Registration for Activities
05/11/25
RD&I
Norway and Brazil Launch New Joint Research Funding Call...
05/11/25
Partnership
DeepOcean and Jana Marine enter Saudi Arabia subsea part...
04/11/25
ADIPEC 2025
ADIPEC 2025: Industry calls for policy pragmatism, embra...
04/11/25
ADIPEC 2025
Johnson Matthey: Leadership and Innovation Driving the G...
31/10/25
OTC Brasil 2025
OTC Brazil connects the Equatorial Margin’s potential to...
30/10/25
OTC Brasil 2025
New Version of ANP’s Greenhouse Gas Emissions Dynamic Da...
30/10/25
OTC Brasil 2025
Port of Açu and IKM Advance Partnership to Create Brazil...
30/10/25
OTC Brasil 2025
Port of Açu and SISTAC Sign Agreement to Provide Decommi...
29/10/25
Royalties
Royalties from August Production Distributed to States a...
29/10/25
OTC Brasil 2025
iUP Innovation Connections Links Innovation Strategy to ...
29/10/25
ANP
Permanent Production Sharing Offer: Registered Companies...
29/10/25
OTC Brasil 2025
Firjan Showcases Technology and Innovation Solutions for...
29/10/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.