Oil & Gas

Det Norske spuds its first operated well in Barents Sea

Langlitinden prospect is in production license 659.

Det Norske
14/01/2014 13:11
Visualizações: 486 (0) (0) (0) (0)

 

Drilling of Det norske’s first operated well in the Barents Sea starts today 14 January, on the Langlitinden prospect in production license 659.
The target for the well (7222/11-2) is to prove hydrocarbons in the Kobbe formation on the Bjarmeland platform. The same structure was drilled in 2008, approximately six kilometers away. Then, a small gas column was encountered in the Snadd formation. In the Kobbe formation, two zones containing hydrocarbons were discovered; an oil column of approximately three meters, and an 11-meter oil and gas column situated somewhat deeper.
The license was awarded in February 2012, in connection with the APA 2011 licensing round.
Determined and efficient work in the license partnership makes us able to drill this well less than two years after the award. This is an exciting start to the new year, says Head of Det norske’s office in Harstad, Terje Solheim.
Seismic data have indicated several large channels in Kobbe that might possibly also function as stratigraphic traps. This structure has not been previously tested. The target is to prove hydrocarbons and good reservoir characteristics inside the channels. Although it is primarily expected to encounter gas, oil cannot be ruled out.
The well is located approximately 165 kilometers northwest of Hammerfest, which will serve as the helicopter and supply base during the operation.
The operation will be carried out by the semi-submersible drilling rig Transocean Barents. The rig is positioned by means of dynamic positioning, not requiring the usage of anchors. The total length of the well is 2,901 meters from the seabed. The ocean depth is 338 meters.
This is Det norske’s first own-operated well in the Barents Sea. Det norske is a driving force behind increased levels of activity in the High North. The activities in the Barents Sea are managed from the company’s office in Harstad.
Licensees in PL 659:
- Det norske oljeselskap, operator 30 percent*
- Petoro 30 percent
- Lundin Norway 20 percent
- Tullow Oil Norge 10 percent
- Rocksource Exploration Norway 5 percent
- Ithaca Petroleum Norge 5 percent
*Det norske has sold ten percent to Atlantic Petroleum Norge. The transaction is subject to approval by the authorities.
Det norske names its prospects after Norwegian mountains or mountain ranges. Langlitinden is a mountain located on the Andørja island in the municipality of Ibestad in Troms county. It measures 1,276 metres above sea level and is the highest mountain on an island in Scandinavia. The glacier Blåisen is situated below the summit on the north-eastern side.

Drilling of Det norske’s first operated well in the Barents Sea starts today 14 January, on the Langlitinden prospect in production license 659.


The target for the well (7222/11-2) is to prove hydrocarbons in the Kobbe formation on the Bjarmeland platform. The same structure was drilled in 2008, approximately six kilometers away. Then, a small gas column was encountered in the Snadd formation. In the Kobbe formation, two zones containing hydrocarbons were discovered; an oil column of approximately three meters, and an 11-meter oil and gas column situated somewhat deeper.


The license was awarded in February 2012, in connection with the APA 2011 licensing round.


Determined and efficient work in the license partnership makes us able to drill this well less than two years after the award. This is an exciting start to the new year, says Head of Det norske’s office in Harstad, Terje Solheim.


Seismic data have indicated several large channels in Kobbe that might possibly also function as stratigraphic traps. This structure has not been previously tested. The target is to prove hydrocarbons and good reservoir characteristics inside the channels. Although it is primarily expected to encounter gas, oil cannot be ruled out.The well is located approximately 165 kilometers northwest of Hammerfest, which will serve as the helicopter and supply base during the operation.


The operation will be carried out by the semi-submersible drilling rig Transocean Barents. The rig is positioned by means of dynamic positioning, not requiring the usage of anchors. The total length of the well is 2,901 meters from the seabed. The ocean depth is 338 meters.


This is Det norske’s first own-operated well in the Barents Sea. Det norske is a driving force behind increased levels of activity in the High North. The activities in the Barents Sea are managed from the company’s office in Harstad.


Licensees in PL 659:

- Det norske oljeselskap, operator 30 percent

- Petoro 30 percent- Lundin Norway 20 percent

- Tullow Oil Norge 10 percent

- Rocksource Exploration Norway 5 percent

- Ithaca Petroleum Norge 5 percent

 

Det norske names its prospects after Norwegian mountains or mountain ranges. Langlitinden is a mountain located on the Andørja island in the municipality of Ibestad in Troms county. It measures 1,276 metres above sea level and is the highest mountain on an island in Scandinavia. The glacier Blåisen is situated below the summit on the north-eastern side.

 

Most Read
see see
ROG.e 2026
ROG.e 2026 Reinforces the DE&I Agenda in the Energy Sect...
24/09/26
ROG.e 2026
IBP Launches Publication on Energy Companies’ Socio-envi...
23/09/26
ROG.e 2026
Industry Giants and Independent Producers Accelerate Pro...
22/09/26
ROG.e 2026
Firjan Attends ROG.e 2026 Opening Ceremony and Signs Tec...
22/09/26
ROG.e 2026
ROG.e 2026 Opening Ceremony Highlights Just Energy Trans...
21/09/26
ROG.e 2026
Global Leaders Position Brazil as a Hub of Stability, At...
21/09/26
ROG.e 2026
Exclusive Interview: Pelagus targets Brazil to strengthe...
21/09/26
ROG.e 2026
At ROG.e, Firjan SENAI Holds the 30th Edition of the Sup...
21/09/26
ROG.e 2026
ROG.e 2026 kicks off next Monday (21) with global energy...
19/09/26
ROG.e 2026
Camorim invests R$ 250 million in 2026 to expand fleet a...
18/09/26
ROG.e 2026
Firjan SENAI SESI Presents New Technologies at ROG.e Dev...
18/09/26
ADIPEC 2026
ADIPEC 2026 to mobilise investment in resilient, intelli...
18/09/26
Acquisition
CoreMarine takes a decisive step to expand its offshore ...
17/09/26
ROG.e 2026
M&O and Belga Marine to Showcase Global Energy and Offsh...
17/09/26
26th WPC
WPC ENERGY announces the theme, date and location for it...
16/09/26
New Contracts
Petrobras awards Strohm a contract to supply thermoplast...
15/09/26
ROG.e 2026
Equinor Celebrates 25 Years in Brazil and Showcases Its ...
15/09/26
ROG.e 2026
Sindicom to Host Lubricants Arena at ROG.e 2026
15/09/26
ROG.e 2026
ROG.e 2026 Expected to Generate R$ 593 Million for Rio d...
14/09/26
ABPIP
Independent Producers Propose Nine Measures for the Next...
14/09/26
Products and Services
RiverTough Bearings and Seals
05/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.