Products & Services

Flexomarine delivers marine hoses to Petrobras’ UOTE Project

Flexomarine
19/03/2014 18:23
Flexomarine delivers marine hoses to Petrobras’ UOTE Project Imagem: Divulgation Visualizações: 449 (0) (0) (0) (0)

 

Flexomarine delivers marine hoses to Petrobras’ UOTE Project
 
Flexomarine, Brazilian producer of offshore marine hoses, sold 45 submarine hoses to Bluewater to be installed in Petrobras’ Offshore Transfer and Export Units (UOTE).  UOTE is a high seas advanced terminal designed to transfer oil from a dynamic positioning (DP) vessel to an FSO, which, in turn, distributes the load by two mooring buoys which transfer oil to shuttle tankers, responsible to transport the oil to its final destination, either in Brazil or abroad.  Therefore, the shuttle tankers do not need to go to an onshore marine terminal, increasing efficiency and agility in the high seas oil offloading process.  The transfer capacity is of 240,000 barrels per day, with total storage of two million bbl.
 
According to the figure below, the supplied submarine hoses have the purpose to transfer oil to the FSO 70 meters below sea level, where are then connected to the PLEMs and PLETs and distributed to the mooring buoys, which offload to the exporting vessels.  As a result with the boldness and innovation of the Project, Flexomarine, with great conviction of its products’ quality, met the requests of both Bluewater and Petrobras, also offering a two-year extended warranty on the hoses.

Flexomarine, Brazilian producer of offshore marine hoses, sold 45 submarine hoses to Bluewater to be installed in Petrobras’ Offshore Transfer and Export Units (UOTE).

 

UOTE is a high seas advanced terminal designed to transfer oil from a dynamic positioning (DP) vessel to an FSO, which, in turn, distributes the load by two mooring buoys which transfer oil to shuttle tankers, responsible to transport the oil to its final destination, either in Brazil or abroad. Therefore, the shuttle tankers do not need to go to an onshore marine terminal, increasing efficiency and agility in the high seas oil offloading process. The transfer capacity is of 240,000 barrels per day, with total storage of two million bbl.


The supplied submarine hoses have the purpose to transfer oil to the FSO 70 meters below sea level, where are then connected to the PLEMs and PLETs and distributed to the mooring buoys, which offload to the exporting vessels.  As a result with the boldness and innovation of the Project, Flexomarine, with great conviction of its products’ quality, met the requests of both Bluewater and Petrobras, also offering a two-year extended warranty on the hoses.

Most Read
see see
ROG.e 2026
ROG.e 2026 Reinforces the DE&I Agenda in the Energy Sect...
24/09/26
ROG.e 2026
IBP Launches Publication on Energy Companies’ Socio-envi...
23/09/26
ROG.e 2026
Industry Giants and Independent Producers Accelerate Pro...
22/09/26
ROG.e 2026
Firjan Attends ROG.e 2026 Opening Ceremony and Signs Tec...
22/09/26
ROG.e 2026
ROG.e 2026 Opening Ceremony Highlights Just Energy Trans...
21/09/26
ROG.e 2026
Global Leaders Position Brazil as a Hub of Stability, At...
21/09/26
ROG.e 2026
Exclusive Interview: Pelagus targets Brazil to strengthe...
21/09/26
ROG.e 2026
At ROG.e, Firjan SENAI Holds the 30th Edition of the Sup...
21/09/26
ROG.e 2026
ROG.e 2026 kicks off next Monday (21) with global energy...
19/09/26
ROG.e 2026
Camorim invests R$ 250 million in 2026 to expand fleet a...
18/09/26
ROG.e 2026
Firjan SENAI SESI Presents New Technologies at ROG.e Dev...
18/09/26
ADIPEC 2026
ADIPEC 2026 to mobilise investment in resilient, intelli...
18/09/26
Acquisition
CoreMarine takes a decisive step to expand its offshore ...
17/09/26
ROG.e 2026
M&O and Belga Marine to Showcase Global Energy and Offsh...
17/09/26
26th WPC
WPC ENERGY announces the theme, date and location for it...
16/09/26
New Contracts
Petrobras awards Strohm a contract to supply thermoplast...
15/09/26
ROG.e 2026
Equinor Celebrates 25 Years in Brazil and Showcases Its ...
15/09/26
ROG.e 2026
Sindicom to Host Lubricants Arena at ROG.e 2026
15/09/26
ROG.e 2026
ROG.e 2026 Expected to Generate R$ 593 Million for Rio d...
14/09/26
ABPIP
Independent Producers Propose Nine Measures for the Next...
14/09/26
Products and Services
RiverTough Bearings and Seals
05/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.