Pre-Salt

FPSO P-68 heads for Berbigão and Sururu fields in Santos Basin pre-salt

T&B Petroleum/Petrobras Agency
16/09/2019 14:31
FPSO P-68 heads for Berbigão and Sururu fields in Santos Basin pre-salt Imagem: Divulgation Visualizações: 1129 (0) (0) (0) (0)

Petrobras reports that the P-68 platform left today the Jurong Aracruz Shipyard, heading to the Berbigão and Sururu fields, in the Santos Basin pre-salt. Production of these fields is expected to begin in the fourth quarter of 2019.


In line with its 2019-2023 Business and Management Plan, P-68 will be the fourth platform to start-up in 2019, after P-67, P-76 and P-77, contributing to the projected growth of Petrobras production during this period.


This is a FPSO platform (floating, production, storage and offloading unit of oil and gas) and has the following characteristics:

  • Oil Processing Capacity: 150 thousand barrels/day;
  • Gas Processing Capacity: 6 million m³/day;
  • Injection Water Treatment Capacity: 180 thousand barrels/day;
  • Storage Capacity: 1.6 million barrels of oil;
  • Depth Anchorage: 2,280 m;
  • Total Length: 316 m;
  • Width: 54 m;
  • Height: 31.5 m.

 

The hull was built at the Rio Grande Shipyard, in Rio Grande do Sul, and the module integration and commissioning of the Unit were carried out at the Jurong Aracruz Shipyard, in Aracruz, Espírito Santo.


Berbigão and Sururu fields are located in the BM-S-11A concession, operated by Petrobras (42.5%), in partnership with Shell Brasil Petróleo Ltda. (25%), Total (22.5%) and Petrogal Brasil S.A. (10%), with the consortium companies owning P-68. The reservoirs of these fields extend to areas under the Transfer of Rights Agreement (100% Petrobras) and, after the unitization process, will constitute the shared reservoir of Berbigão and Sururu.

Most Read
see see
ROG.e 2026
ROG.e 2026 Reinforces the DE&I Agenda in the Energy Sect...
24/09/26
ROG.e 2026
IBP Launches Publication on Energy Companies’ Socio-envi...
23/09/26
ROG.e 2026
Industry Giants and Independent Producers Accelerate Pro...
22/09/26
ROG.e 2026
Firjan Attends ROG.e 2026 Opening Ceremony and Signs Tec...
22/09/26
ROG.e 2026
ROG.e 2026 Opening Ceremony Highlights Just Energy Trans...
21/09/26
ROG.e 2026
Global Leaders Position Brazil as a Hub of Stability, At...
21/09/26
ROG.e 2026
Exclusive Interview: Pelagus targets Brazil to strengthe...
21/09/26
ROG.e 2026
At ROG.e, Firjan SENAI Holds the 30th Edition of the Sup...
21/09/26
ROG.e 2026
ROG.e 2026 kicks off next Monday (21) with global energy...
19/09/26
ROG.e 2026
Camorim invests R$ 250 million in 2026 to expand fleet a...
18/09/26
ROG.e 2026
Firjan SENAI SESI Presents New Technologies at ROG.e Dev...
18/09/26
ADIPEC 2026
ADIPEC 2026 to mobilise investment in resilient, intelli...
18/09/26
Acquisition
CoreMarine takes a decisive step to expand its offshore ...
17/09/26
ROG.e 2026
M&O and Belga Marine to Showcase Global Energy and Offsh...
17/09/26
26th WPC
WPC ENERGY announces the theme, date and location for it...
16/09/26
New Contracts
Petrobras awards Strohm a contract to supply thermoplast...
15/09/26
ROG.e 2026
Equinor Celebrates 25 Years in Brazil and Showcases Its ...
15/09/26
ROG.e 2026
Sindicom to Host Lubricants Arena at ROG.e 2026
15/09/26
ROG.e 2026
ROG.e 2026 Expected to Generate R$ 593 Million for Rio d...
14/09/26
ABPIP
Independent Producers Propose Nine Measures for the Next...
14/09/26
Products and Services
RiverTough Bearings and Seals
05/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.