Oil & Gas

Kangaroo-2 Flows Oil at 3,700 stb/d

Kangaroo-2 Flows Oil at 3,700 stb/d from the Paleocene Reservoirs Adding to Earlier Maastrichtian Success

Karoon Gas Australia Ltd
06/01/2015 18:22
Kangaroo-2 Flows Oil at 3,700 stb/d Imagem: Karoon Gas Australia's Kangaroo-2 off the coast of Brazil Visualizações: 406 (0) (0) (0) (0)

 

Karoon Gas Australia Ltd’s Kangaroo-2 appraisal well, located in exploration Block S-M-1165, confirmed a 250 metre gross (135 metre net) oil column in Paleocene and Maastrichtian aged reservoirs, announced 26 November 2014. Karoon is the operator and has a 65% interest in the jointly held Block S-M-1165, Santos Basin, Brazil. Pacific Rubiales Energy Corp holds the remaining 35% interest.

As at 0600 hrs AEST on 6 January 2015, production testing over the Paleocene A, B and C oil bearing reservoirs was complete. Preparations are underway to commence a side-track program to better define the resource size and recovery factors. The results from the test are as follows:


Oil Flow Rate


Production test DST-2A was conducted in the Paleocene A, B and C sandstone reservoirs over the intervals 1,663- 1,681 mRT, 1,695-1,729 mRT and 1,735-1,753 mRT with a 12 hour main flow period.

The maximum oil flow rate attained was 3,700 stb/d (stabilised rate of 3,450 stb/d) through an 88/64” choke with a flowing tubing head pressure of 270 psia, a gas-oil-ratio of 540 scf/stb.

Production test DST-2 was conducted in the Paleocene C sandstone reservoir over the interval 1,735-1,753 mRT. The maximum oil flow rate attained was 2,500 stb/d through a 44/64” choke with a flowing tubing head pressure of 425 psia and a gas-oil-ratio of 450 scf/stb. The well was then flowed on a 40/64” choke at a stabilised rate of 1,820 stb/d with a flowing tubing head pressure of 420 psia, a gas-oil-ratio of 450 scf/stb. At the end of a main 24 hour flow period, the well was shut-in for a 48 hour pressure build-up period.


Oil Specification

DST-2A produced a 33° API oil with zero CO2, H2S, water or sand produced.

DST-2 produced a 31° API oil with zero CO2, H2S, water or sand produced.


Production Well Potential


Based on the oil rates obtained in DST-1A (Maastrichtian section) and DST-2A (Paleocene section), Managing Director, Mr Robert Hosking said “Karoon is very pleased with the production testing results from Kangaroo-2. Based on the flow rates achieved in both the Paleocene and Maastrichtian reservoirs, a vertical production well could produce 6,000 to 8,000 stb/d from the combined reservoirs. In addition, horizontal production wells could be expected to produce at higher rates.”


Kangaroo-2 Side-Track Program


After the well testing string is removed and the Paleocene reservoirs are plugged back with cement and a cement retainer, the well will be side-tracked in both a down-dip and up-dip location in order to better define the resource size and recovery factors.

Side-track-1 will be drilled to a down-dip location to target the Paleocene and Maastrichtian reservoirs on the eastern side of an interpreted north-south trending fault, and to evaluate potential hydrocarbon accumulations in the Campanian. Wire-line logs and a pressure survey will be conducted.

Side-track-2 will be drilled into Paleocene and Maastrichtian reservoirs in an up-dip location to test reservoir and hydrocarbon potential towards the salt wall.

The information obtained from Kangaroo-2 will be important for assessing the commerciality of the Kangaroo oil field and will be valuable for a Front End Engineering and Design (’FEED’) phase bringing the project a step closer to commerciality.

The Kangaroo-2 appraisal well is located in exploration Block S-M-1165, approximately 300 metres up-dip and 4 kilometres south of Kangaroo-1 and is the first well in the Santos Basin exploration and appraisal drilling campaign.


Forward Program


Following the completion of all operations on the Kangaroo-2 appraisal well, the rig will be moved to drill Kangaroo West-1 exploration well (the second firm well in the program) and evaluate the prospect approximately 4.5 kilometres distant on the western side of Kangaroo salt structure. Due to the large size and proximity to Kangaroo, a successful outcome at Kangaroo West-1 would materially add to any possible development of the Kangaroo oil field.

The exploration and appraisal drilling campaign is expected to continue through first half 2015.

The rig contract provides Karoon with 2 firm wells plus 2 option wells, and, in the event of a successful drilling outcome in the first 2 wells provides maximum flexibility for further appraisal of the Kangaroo oil discovery, additional drilling at Kangaroo West or possibly targeting other prospects.

The salt flank play was first proven by Kangaroo-1 with the intersection of a 76 metre gross oil column and oil recovered to surface from wireline DSTs. Results of the Kangaroo-2 further confirm the viability of the play. Kangaroo West-1 is located on the western flank of the same salt structure as Kangaroo-1 and has the same trap type and reservoir and seal intervals that have been mapped into the prospect from surrounding wells.

The ’Olinda Star’ semi-submersible rig is drilling the entire campaign.

 

 

 

Most Read Today
see see
Results
ANP Releases Consolidated Data on Oil and Gas Production...
03/08/26
SOG 2026
Banco do Nordeste Has R$ 504 Million for the Energy Sect...
03/08/26
PPSA
TotalEnergies and ExxonMobil Win Atapu and Bacalhau Cargoes
31/07/26
SOG 2026
Sebrae Sergipe Strengthens Small Businesses and Expands ...
31/07/26
PPSA
PPSA Expects to Hold the First Auction of the Union’s Na...
30/07/26
SOG 2026
Sergipe Oil & Gas 2026 Begins with a Focus on Investment...
30/07/26
SOG 2026
Petrobras Director Opens Sergipe Oil & Gas with Analysis...
30/07/26
FIRJAN
Agrega + Indústria brings together entities, companies, ...
29/07/26
SOG 2026
ABPIP brings to Sergipe Oil & Gas a debate on strengthen...
28/07/26
Event
BR Aviation presents its portfolio of customized solutio...
23/07/26
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2