Oil & Gas

Ocyan rig completes drilling in water depths of less than 500 meters

This type of operation may open a new market for the company

Press Release
10/06/2020 22:15
Visualizações: 166 (0) (0) (0) (0)

Ocyan offers the oil and gas industry a new paradigm for drilling in water depths below 500 meters using a drillship in dynamic positioning, without the use of anchoring. The novelty was achieved for the first time this month with the Norbe VIII rig, in the Albacora field, in the Campos Basin pre-salt, at a water depth of 450 meters and a total depth of 5000 meters.

 

“We completed the operation at the beginning of May with Norbe VIII, after the engineering study that allowed the action at an affordable cost. The demand was presented by the customer in January; we evaluated the use of a drillship in dynamic positioning for this project for one month and, in February, we were able to start the operation with the drilling of the well. This model opens a new market for Ocyan's rigs,” celebrates Heitor Gioppo, Superintendent director of Ocyan's Superintendent director of Ocyan's Drilling Unit.

 

Publicidade

 

Ocyan drillships have the capacity to operate in water depths of up to 3000 meters, meeting the demand of the E&P industry in ultra deep waters. However, recently the number of wells with smaller water depths and total depths equivalent to the pre-salt wells of the Santos Basin has been increasing. This trend has generated the new challenge of operating large drilling units, which work under the dynamic positioning system, in projects that require greater control of the angle between the position of the rig and the equipment connected to the wellhead.

 

"This differential achieved will allow us to offer our rigs for future exploration agreements in fields with reduced water depth, such as the mature fields in the Campos Basin," explains the executive.

 

For the Norbe VIII rig manager, Rafael Fontana, the solution will allow Ocyan to participate in bids where previously there was no technical possibility. “With our engineering work, we are making it possible to drill in increasingly smaller water depths, without the need for major investments in anchoring systems and reducing the environmental impact of this type of operation. This makes our asset competitive, as we have proven in practice to have the versatility to operate from shallow water locations to the ultra deep water fields of the Santos Basin pre-salt”, he concludes.

 

Most Read Today
see see
International
Petrobras announces participation in exploratory block i...
15/09/25
REVAP
Revap Maintenance Shutdown Involves R$ 1 Billion Investment
15/09/25
Rio Pipeline & Logistics 2025
Tanacas celebrates 25 years with the launch of the Smart...
11/09/25
Rio Pipeline & Logistics 2025
Offshore Projects to Strengthen Energy Security in Brazi...
11/09/25
Rio Pipeline & Logistics 2025
IBP Booth Hosts Inspiring Debate on Women in Midstream a...
11/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline 2025 Exhibition Showcases Innovations in En...
11/09/25
Production
Brazil’s Federal Government Oil and Natural Gas Producti...
11/09/25
Rio Pipeline & Logistics 2025
Brazil and Argentina Close to Agreement on Natural Gas T...
11/09/25
Rio Pipeline & Logistics 2025
ITP Brasil showcases high-performance engineering soluti...
10/09/25
Rio Pipeline & Logistics 2025
Overview of investments in pipeline and logistics infras...
10/09/25
Rio Pipeline & Logistics 2025
Young talents present innovative solutions at the Young ...
10/09/25
Rio Pipeline & Logistics 2025
Ministry of Ports and Airports aims to expand the role o...
10/09/25
Auction
PPSA makes available access to the Hybrid Data Package f...
10/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 Opens with Stronger Integr...
09/09/25
Rio Pipeline & Logistics 2025
At Transpetro, Social Responsibility Initiatives Support...
09/09/25
Rio Pipeline & Logistics 2025
DNV participates in Rio Pipeline & Logistics 2025
09/09/25
Rio Pipeline & Logistics 2025
Construtora Elevação Brings Innovation, Efficiency, and ...
09/09/25
ANP
A\Sense wins ANP technology challenge with advanced opti...
09/09/25
Rio Pipeline & Logistics 2025
Rio Pipeline & Logistics 2025 kicks off today, September 9
09/09/25
Minas Gerais
With R$ 314 million investment, pioneering macaúba biofu...
03/09/25
Recognition
Supergasbras earns Gold Seal in the Brazilian GHG Protoc...
03/09/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2