Campos Basin

Peregrino phase 2 on stream

On 10 October at 20:00 (local time), the new platform in Brazil, Peregrino C, produced its very first oil.

T&B Petroleum/Press Release
13/10/2022 16:35
Peregrino phase 2 on stream Imagem: Ricardo Santos - Equinor ASA Visualizações: 2722 (0) (0) (0) (0)

Peregrino phase 2 will extend the Peregrino field life to 2040. Phase 2 adds 250-300 million barrels of oil, while at the same time halving expected CO2 emissions per barrel over the field remaining lifetime.

“I am thrilled that we have started production from the new Peregrino C platform. Covid-19 has made Peregrino phase 2 a challenging project, and I want to thank everyone involved for delivering the project with excellent HSE results,” says Geir Tungesvik, Equinor’s executive vice president for Projects, Drilling & Procurement.

Peregrino phase 2 consists of a new platform with drilling facilities and living quarters tied in to the existing Peregrino FPSO, as well as a new pipeline importing gas to the platform for power generation.

In operation the new platform will provide 350 long-term jobs offshore and onshore in Brazil.

The project was on schedule for planned start-up late in 2020 when Covid-19 hit the project hard, leading to cuts in the workforce several times in the crucial and normally labor-intensive hook-up phase. Still, Peregrino phase 2 is delivered within the original USD 3 billion cost estimate.

In line with Equinor’s low carbon strategy, measures have been taken to reduce CO2 emissions from the Peregrino field. By switching from diesel to gas for power generation on Peregrino C, phase 2 will avoid 100,000 tonnes of CO2 emissions from the Peregrino field per year.

This will also reduce costs and simplify logistics in the operational phase.

“The start-up of Peregrino Phase 2 is an important milestone in Equinor’s growth strategy in Brazil. This project showcases how we can bring valuable new resources onto production at the same time as investing in technology to cut carbon emissions. I am proud that Peregrino Phase 2 will increase field production to 110,000 barrels per day at plateau whilst halving our emissions intensity,” says Al Cook, Equinor’s executive vice president for Exploration & Production International.

The new platform is also equipped with the latest digital tools, like a 3D model of the entire platform that operators can use on an iPad in the field. This improves cooperation offshore and between the platform and the onshore operational support team in Rio de Janeiro.

New digital solutions will also contribute to optimized production, reducing energy usage and thereby CO2 emissions.

Facts

  • Located in the Campos Basin, the Peregrino field started production in 2011.
  • Equinor is the operator (60%), with Sinochem (40%) as partner in the field.
  • Peregrino Phase 1 consists of a floating production vessel (FPSO) supported by two wellhead platforms: Peregrino A and Peregrino B.
  • Peregrino is the largest field operated by Equinor outside Norway and the first of a series of major field developments in Brazil.
  • The Peregrino field has so far produced more than 210 million barrels of oil since the field came on stream in 2011.
Most Read Today
see see
Company News
Strohm completes successful field trials for Petrobras
16/07/25
Natural Gas
Gasmig: 39 Years of Energy, Innovation, and Commitment t...
16/07/25
Sustainability
Foresea earns Social Seal and reports significant result...
11/07/25
Results
Oil and Gas Sector Leads Dividend Distribution in 2024 w...
10/07/25
Natural Gas
Comgás Receives 41 Proposals in Public Call for Natural ...
10/07/25
People
Lucas Mota de Lima Appointed Executive Manager of ABPIP
10/07/25
Biomethane
Presidente Prudente (SP) Begins R$12 Million Biomethane ...
10/07/25
E&P
Hitachi Energy to evaluate electrification of offshore p...
10/07/25
Digitalization
TGS and Equinor Collaborate to Drive Digital Transformat...
10/07/25
People
Julia Cruz Appointed as New Secretary of Green Economy, ...
03/07/25
Sustainability
ABB among TIME’s World’s Most Sustainable Companies
03/07/25
Biofuels
Brazil Can Lead the Decarbonization of International Tra...
03/07/25
Pre-Salt
Oil States signs contracts to supply rigid jumpers for S...
03/07/25
Electric Energy
SMEs: Seven Tips for Joining the Free Energy Market
03/07/25
Energy Transition
CCEE Highlights Leadership in Energy Transition at EVEX ...
03/07/25
Award
WPC Energy Announces Vicki Hollub as Recipient of the Pr...
01/07/25
ANP
Final Results of the PRH-ANP 2025 Announced
01/07/25
Wind Energy
New Provisional Measure Will Not Be Enough to Counter Ha...
30/06/25
International
Oil discovery in the Johan Castberg area in the Barents Sea
30/06/25
Fuels
Gasoline Drops Just 0.78% in June Despite Petrobras' 5.6...
30/06/25
Event
Brazil Advances Energy Transition with E30 and B15, Rein...
30/06/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2