Santos Basin

Petrobras begins commercial production at Santos Basin pre-salt Iracema Sul area

Petrobras announces that platform Cidade de Mangaratiba went into operation today (10/14)

Petrobras Agency
15/10/2014 15:04
Petrobras begins commercial production at Santos Basin pre-salt Iracema Sul area Imagem: Petrobras Agency Visualizações: 3846 (0) (0) (0) (0)

Petrobras announces that platform Cidade de Mangaratiba went into operation today (10/14) at the Santos Basin pre-salt area of Iracema Sul, in Lula field, located on block BM-S-11. The start-up of the new platform was anticipated since the original expected start-up, as provided for in the 2014-2018 Business & Management Plan, had been scheduled for November 6th, 2014.


The platform Cidade de Mangaratiba is an FPSO (floating production storage and offloading) type unit and it was contracted in September 2011 from the Schahin-Modec consortium. The hull of the FPSO was converted at the Cosco shipyard, in Dalian, China and the integration of the process plant modules took place at the BrasFels shipyard in Angra do Reis, Rio de Janeiro.


The platform, which is set up at a depth of 2,200 meters, some 240km off the coast, will have the capacity to process up to 150 thousand barrels of oil and 8 million m3 of gas per day, in addition to storing 1.6 million barrels of oil. Well 4-RJS-647, the first to be connected to the FPSO, has a production potential of over 30 thousand barrels per day. The oil produced at the Iracema Sul area is of high quality and of medium density (30º API) and will be transported by shuttle tankers.


The Santos Basin Integrated Gas Distribution Network will distribute the portion of the gas that is not used for reinjection in the field. FPSO Cidade de Mangaratiba will be connected to eight production wells and eight injection ones over the coming months. Production is expected to peak in the first half of 2016.


The estimated local content for the development of the Iracema Sul area is 42%, higher than the 30% minimum local content specified by Brazil’s National Petroleum, Natural Gas and Biofuels Agency (ANP) for block BM-S-11. The construction and integration of the platform’s modules in Brazil involved four construction sites in Rio de Janeiro – distributed across Itaguaí, Ilha do Fundão, Niterói, Angra dos Reis – as well as Bahia.


Concession BM-S-11 is operated by Petrobras (65%), in partnership with BG E&P Brasil Ltda (25%) and Petrogal Brasil S.A. (10%).


Technical specifications:

 

Production capacity: 150 thousand barrels per day

Natural gas treatment capacity: 8 million m3 per day

Storage capacity: 1.6 million barrels of oil

Accommodation: 150 people

Operating water depth: 2,200 meters

 

 

Most Read Today
see see
ROG.e 2026
ROG.e 2026 Reinforces the DE&I Agenda in the Energy Sect...
24/09/26
ROG.e 2026
IBP Launches Publication on Energy Companies’ Socio-envi...
23/09/26
ROG.e 2026
Industry Giants and Independent Producers Accelerate Pro...
22/09/26
ROG.e 2026
Firjan Attends ROG.e 2026 Opening Ceremony and Signs Tec...
22/09/26
ROG.e 2026
ROG.e 2026 Opening Ceremony Highlights Just Energy Trans...
21/09/26
ROG.e 2026
Global Leaders Position Brazil as a Hub of Stability, At...
21/09/26
ROG.e 2026
Exclusive Interview: Pelagus targets Brazil to strengthe...
21/09/26
ROG.e 2026
At ROG.e, Firjan SENAI Holds the 30th Edition of the Sup...
21/09/26
ROG.e 2026
ROG.e 2026 kicks off next Monday (21) with global energy...
19/09/26
ROG.e 2026
Camorim invests R$ 250 million in 2026 to expand fleet a...
18/09/26
ROG.e 2026
Firjan SENAI SESI Presents New Technologies at ROG.e Dev...
18/09/26
ADIPEC 2026
ADIPEC 2026 to mobilise investment in resilient, intelli...
18/09/26
Acquisition
CoreMarine takes a decisive step to expand its offshore ...
17/09/26
ROG.e 2026
M&O and Belga Marine to Showcase Global Energy and Offsh...
17/09/26
26th WPC
WPC ENERGY announces the theme, date and location for it...
16/09/26
New Contracts
Petrobras awards Strohm a contract to supply thermoplast...
15/09/26
ROG.e 2026
Equinor Celebrates 25 Years in Brazil and Showcases Its ...
15/09/26
ROG.e 2026
Sindicom to Host Lubricants Arena at ROG.e 2026
15/09/26
ROG.e 2026
ROG.e 2026 Expected to Generate R$ 593 Million for Rio d...
14/09/26
ABPIP
Independent Producers Propose Nine Measures for the Next...
14/09/26
Products and Services
RiverTough Bearings and Seals
05/09/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.