Santos Basin

Petrobras begins commercial production at Santos Basin pre-salt Iracema Sul area

Petrobras announces that platform Cidade de Mangaratiba went into operation today (10/14)

Petrobras Agency
15/10/2014 15:04
Petrobras begins commercial production at Santos Basin pre-salt Iracema Sul area Imagem: Petrobras Agency Visualizações: 919 (0) (0) (0) (0)

Petrobras announces that platform Cidade de Mangaratiba went into operation today (10/14) at the Santos Basin pre-salt area of Iracema Sul, in Lula field, located on block BM-S-11. The start-up of the new platform was anticipated since the original expected start-up, as provided for in the 2014-2018 Business & Management Plan, had been scheduled for November 6th, 2014.


The platform Cidade de Mangaratiba is an FPSO (floating production storage and offloading) type unit and it was contracted in September 2011 from the Schahin-Modec consortium. The hull of the FPSO was converted at the Cosco shipyard, in Dalian, China and the integration of the process plant modules took place at the BrasFels shipyard in Angra do Reis, Rio de Janeiro.


The platform, which is set up at a depth of 2,200 meters, some 240km off the coast, will have the capacity to process up to 150 thousand barrels of oil and 8 million m3 of gas per day, in addition to storing 1.6 million barrels of oil. Well 4-RJS-647, the first to be connected to the FPSO, has a production potential of over 30 thousand barrels per day. The oil produced at the Iracema Sul area is of high quality and of medium density (30º API) and will be transported by shuttle tankers.


The Santos Basin Integrated Gas Distribution Network will distribute the portion of the gas that is not used for reinjection in the field. FPSO Cidade de Mangaratiba will be connected to eight production wells and eight injection ones over the coming months. Production is expected to peak in the first half of 2016.


The estimated local content for the development of the Iracema Sul area is 42%, higher than the 30% minimum local content specified by Brazil’s National Petroleum, Natural Gas and Biofuels Agency (ANP) for block BM-S-11. The construction and integration of the platform’s modules in Brazil involved four construction sites in Rio de Janeiro – distributed across Itaguaí, Ilha do Fundão, Niterói, Angra dos Reis – as well as Bahia.


Concession BM-S-11 is operated by Petrobras (65%), in partnership with BG E&P Brasil Ltda (25%) and Petrogal Brasil S.A. (10%).


Technical specifications:

 

Production capacity: 150 thousand barrels per day

Natural gas treatment capacity: 8 million m3 per day

Storage capacity: 1.6 million barrels of oil

Accommodation: 150 people

Operating water depth: 2,200 meters

 

 

Most Read Today
see see
Business
SBM Offshore signs US$400 million Sale and Leaseback agr...
09/04/25
Vitória Petroshow 2025
Vitória PetroShow 2025 reinforces Espírito Santo’s leade...
08/04/25
Vitória Petroshow 2025
Exploration of New Blocks Could Triple Reserves and Doub...
08/04/25
Event
Espírito Santo Unveils New Yearbook Highlighting the Fut...
08/04/25
Vitória Petroshow 2025
Entrepreneurship and Energy Sector Leaders Invite You to...
07/04/25
Vitória Petroshow 2025
Márcio Felix Highlights the Strategic Importance of Vitó...
07/04/25
Vitória Petroshow 2025
Vitória Petroshow highlights Espírito Santo as a nationa...
07/04/25
OTC Houston 2025
OTC Recognizes 2025 Spotlight on New Technology® Award W...
04/04/25
Agreement
Petrobras and Braskem Sign Agreement for Carbon Capture ...
04/04/25
Energy Transition
Oil and Gas Sector Reinforces Its Commitment to Energy T...
04/04/25
Onshore
Oil and gas production in onshore fields is expected to ...
03/04/25
ANP
Proven oil reserves in Brazil increased by 5.92% in 2024.
03/04/25
E&P
Investments in exploration could reach up to US$ 2.3 bil...
03/04/25
International
Sebrae Rio: Registrations for the Technical Mission to O...
02/04/25
Company News
Global Reach Inspires OMMICA to Significant Sales Increase
31/03/25
Local Content
The National Agency of Petroleum, Natural Gas, and Biofu...
28/03/25
Pernambuco
RNEST Increases Processing Capacity with Completion of T...
28/03/25
Equatorial Margin
Petrobras Contributes to the Expansion of Brazil’s Conti...
28/03/25
iBEM25
Engineering Students Adapt Vehicle for Renewable Energy ...
28/03/25
iBEM25
Closing of iBEM 25: A Milestone in Latin America's Energ...
28/03/25
iBEM25
iBEM 25: Conference Addresses Challenges of Recycling Ma...
27/03/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.