Tecnology

Petrobras in partnership with the Senai Institute of Innovation of Joinville, develops robot for painting platforms

T&B Petroleum/Petrobras Agency
22/07/2019 18:10
Petrobras in partnership with the Senai Institute of Innovation of Joinville, develops robot for painting platforms Imagem: Petrobras Agency Visualizações: 297 (0) (0) (0) (0)

Petrobras has developed, in partnership with the Senai Institute of Innovation of Joinville, a robot to paint large vertical flat surfaces, such as ship hulls and platforms. The system is a pioneer in the world in terms of concept and productivity, and is in the licensing phase to become a commercial product. Tests carried out by the company on the P-35 hull, located in the Campos Basin, allowed a reduction of human exposure to risk by 88% and reduction of maintenance costs by 84%.

 

The robot has the potential to perform the painting of a surface of 300 m² in an hour, while a person is able to paint 20 m² in the same period. During the pilot project, the use of the robot allowed Petrobras to reduce the service time from 35 days (with scaffolding) to 14 days (with robot) and the number of performers from 20 to 6 people, considering the actual time of shipment and mobilization of equipment.

 

"With the simplification of the operation, in addition to greater productivity, there are gains in safety, environment and health. The service performed by robot avoids work accidents, since the system is operated through a control panel, located on the deck of the unit. The robotic activity depends less on sea conditions, so in the future the potential for productivity gains may be even greater than what is observed in the test phase, "says consultant André Koebsch, one of the creators of the project.

 

The development of the technology generated three patents, whose applications were deposited by Petrobras at the National Institute of Industrial Property (INPI), in January of this year. As a result, the company hopes to transfer technology to suppliers and enable maximum application in platform maintenance.

Most Read Today
see see
Results
ANP Releases Consolidated Data on Oil and Gas Production...
03/08/26
SOG 2026
Banco do Nordeste Has R$ 504 Million for the Energy Sect...
03/08/26
PPSA
TotalEnergies and ExxonMobil Win Atapu and Bacalhau Cargoes
31/07/26
SOG 2026
Sebrae Sergipe Strengthens Small Businesses and Expands ...
31/07/26
PPSA
PPSA Expects to Hold the First Auction of the Union’s Na...
30/07/26
SOG 2026
Sergipe Oil & Gas 2026 Begins with a Focus on Investment...
30/07/26
SOG 2026
Petrobras Director Opens Sergipe Oil & Gas with Analysis...
30/07/26
FIRJAN
Agrega + Indústria brings together entities, companies, ...
29/07/26
SOG 2026
ABPIP brings to Sergipe Oil & Gas a debate on strengthen...
28/07/26
Event
BR Aviation presents its portfolio of customized solutio...
23/07/26
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.

2