Seismic

Quest Progresses Seismic Reprocessing for Ranau PSC in South Sumatra

In October, Quest commenced the reprocessing and interpretation of 62 km of 1993 vintage 2D seismic data.

Quest Petroleum NL
24/01/2014 13:06
Visualizações: 1784 (0) (0) (0) (0)

 

Quest Petroleum NL (Quest), an Australia-listed oil and gas exploration firm, announced Friday progress on the seismic reprocessing and interpretation on its Ranau Production Sharing Contract (PSC) in South Sumatra, Indonesia.
As previously detailed to the market, Quest conducted a detailed review of the existing gravity data and also acquired further existing seismic data for the Ranau block. In October, Quest commenced the advanced reprocessing and interpretation of 38.5 miles (62 kilometers) of 1993 vintage 2D seismic data. These seismic lines were shot in the north-west section of the Ranau PSC and cover a gravity high identified in the gravity survey performed by Quest in 2012.
The original data was of good quality, with sufficient charge and recording spread to enable the modern reprocessing technology to produce a vastly improved seismic imaging of the subsurface. The reprocessed data shows a much clearer image of the subsurface and has also uncovered previously undefined leads and potential prospects.
Quest engaged PT Tesla Indonesia (PT Tesla), a firm very familiar with the regional geophysics and geology, to reprocess the existing seismic data using the latest state of the art Promax R5000 software for seismic processing in the time domain. PT Tesla used Paradigm GeoDepth software to create advanced imaging products issuing the Common Reflection Angle Migration (CRAM) to further improve image quality and create clear and accurate imaging of the subsurface in depth.
PT Tesla then conducted a detailed geological and geophysical study using the latest data to identify, qualify and quantify the prospects and leads over the area of the block that the reprocessed seismic lines covered. This work was conducted by an internationally recognized and licensed geophysical consulting expert.
The results of all the work performed indicate the presence of a structural high, known as Lead A, that coincides with the gravity high previously identified by Quest. At the primary reservoir horizon, the Lead is significant in size, covering more than 4.6 square miles (12 square kilometers) in areal extent and exhibiting 250 feet of structural closure. Seal integrity, source and maturity definition require further investigation and review, whereupon, a decision will be made whether to conduct more seismic over the block or work the structural high into a drillable target.

Quest Petroleum NL (Quest), an Australia-listed oil and gas exploration firm, announced Friday progress on the seismic reprocessing and interpretation on its Ranau Production Sharing Contract (PSC) in South Sumatra, Indonesia.

As previously detailed to the market, Quest conducted a detailed review of the existing gravity data and also acquired further existing seismic data for the Ranau block. In October, Quest commenced the advanced reprocessing and interpretation of 38.5 miles (62 kilometers) of 1993 vintage 2D seismic data. These seismic lines were shot in the north-west section of the Ranau PSC and cover a gravity high identified in the gravity survey performed by Quest in 2012.

The original data was of good quality, with sufficient charge and recording spread to enable the modern reprocessing technology to produce a vastly improved seismic imaging of the subsurface. The reprocessed data shows a much clearer image of the subsurface and has also uncovered previously undefined leads and potential prospects.

Quest engaged PT Tesla Indonesia (PT Tesla), a firm very familiar with the regional geophysics and geology, to reprocess the existing seismic data using the latest state of the art Promax R5000 software for seismic processing in the time domain. PT Tesla used Paradigm GeoDepth software to create advanced imaging products issuing the Common Reflection Angle Migration (CRAM) to further improve image quality and create clear and accurate imaging of the subsurface in depth.

PT Tesla then conducted a detailed geological and geophysical study using the latest data to identify, qualify and quantify the prospects and leads over the area of the block that the reprocessed seismic lines covered. This work was conducted by an internationally recognized and licensed geophysical consulting expert.

The results of all the work performed indicate the presence of a structural high, known as Lead A, that coincides with the gravity high previously identified by Quest. At the primary reservoir horizon, the Lead is significant in size, covering more than 4.6 square miles (12 square kilometers) in areal extent and exhibiting 250 feet of structural closure. Seal integrity, source and maturity definition require further investigation and review, whereupon, a decision will be made whether to conduct more seismic over the block or work the structural high into a drillable target.

 

Most Read Today
see see
PPSA
PPSA Publishes Notice for the Non-Contracted Areas Auction
10/10/25
ROG.e
IBP Launches the New ROG.e: The World’s Largest Energy F...
10/10/25
Pre-Salt
CNPE Sets Minimum Value of BRL 10.2 Billion for the Unio...
08/10/25
Natural Gas
Petrobras Carries Out First Natural Gas Import from Arge...
08/10/25
Agreement
Seagems renews Wärtsilä Lifecycle Agreement to support t...
07/10/25
Pre-Salt
Petrobras begins contracting for the construction of FPS...
03/10/25
International Company News
Alkhorayef Petroleum Company acquires GRC Technologies, ...
01/10/25
Pre-Salt
FPSO P-78 arrives at the Búzios Field
01/10/25
RD&I
Brazil Has the Capacity to Develop Its Own Technology fo...
01/10/25
Equatorial Margin
Ibama Approves Pre-Operational Assessment (APO) Conducte...
26/09/25
Sustainable Aviation
Embraer Advances SAF Studies Following Acquisition of Bi...
26/09/25
International Company News
ExxonMobil Guyana Expands Capacity With Seventh Offshore...
24/09/25
International Company News
More LNG for Europe
24/09/25
International Company News
Viking Completes Milestone Delivery to African Energy Pr...
24/09/25
Company News
CHC Helicopter Opens Hangar at Farol de São Tomé Helipor...
22/09/25
International Company News
“Sercel supplies sensors and trucks for major North Afri...
22/09/25
Geological Studies
R&D Clause Enables Project to Strengthen Critical Minera...
15/09/25
Fuels
ANP Approves Pilot Project with New Fuel Inspection Equi...
15/09/25
RD&I
Sensor Developed by Unicamp and UnB Advances in Internat...
15/09/25
Event
ABPIP Hosts SMS Oil & Gas Meeting Focused on Leadership,...
15/09/25
International
Petrobras announces participation in exploratory block i...
15/09/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.