Thermoelectric

Siemens and Andrade Gutierrez to build thermoelectric plant at Açu Port

T&B Petroleum/Press Office
08/01/2018 18:23
Siemens and Andrade Gutierrez to build thermoelectric plant at Açu Port Imagem: Divulgation Visualizações: 885 (0) (0) (0) (0)

Gás Natural Açu (GNA), a subsidiary of Prumo Logística, concluded the contracting of the consortium Siemens and Andrade Gutierrez for the construction of the first thermoelectric plant in the Açu Port, UTE GNA I. The negotiations between the companies were concluded after the National Electric Energy Agency (Aneel) authorized the transfer of the UTE Novo Tempo thermoelectric plant to UTE GNA I, a company linked to GNA. The consortium will be responsible for engineering solutions, supplies and thermal construction, which will have installed capacity close to 1.3 GW.

 

The installation of the thermoelectric plant is part of Açu Gas Hub, a project under development in the Açu Port Complex, whose objective is to provide a logistics solution for receiving, processing, consuming and transporting natural gas produced in the Campos and Santos Basins, as well as importing and storage of imported LNG.

 

The construction of the first thermal in the Port of Açu is expected to begin in the first quarter of this year. The mobilization of the workers to provide service in the works of the thermoelectric will be carried out by the Network of Employability of the Porto do Açu, by the email curriculum.porto@gmail.com. The direct contracting of GNA is being disclosed in the portal vagas.com/prumologistica.

 

 

Most Read Today
see see
SOG 2026
Petrobras Director Opens Sergipe Oil & Gas with Analysis...
30/07/26
FIRJAN
Agrega + Indústria brings together entities, companies, ...
29/07/26
SOG 2026
ABPIP brings to Sergipe Oil & Gas a debate on strengthen...
28/07/26
Event
BR Aviation presents its portfolio of customized solutio...
23/07/26
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
IBP Positioning
Change of the instrument does not fix the illegalities o...
07/07/26
Energy Summit
Energy Summit 2026: Embrapii technologies strengthen Bra...
22/06/26
Energy Summit
Biodiesel and renewable fuels move to the center of the ...
22/06/26
Natural Gas
ANP extends public consultation on the calculation of th...
22/06/26
Rio de Janeiro
Firjan’s Oil Yearbook in Rio highlights that positive pr...
22/06/26
Biomethane
With a market five times larger since 2020, the biometha...
22/06/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.