Companies

ABB awarded $103 million order for world’s largest iron mine in Brazil

Mine of the future to be fitted with complete truckless transport system controlled by intelligent digital substations to reduce emissions and cut fuel costs

ABB
09/09/2014 19:22
Visualizações: 839 (0) (0) (0) (0)

ABB has won a $103 million contract from Brazilian mining company Vale to install electrical and automation systems at a modern iron ore mine in the Carajás mountains of northern Brazil as part of a major capacity expansion.

 

This order follows a previous $140 million contract won by ABB to complete the first phase of the S11D project, supplying and installing automation and electrical equipment for the process plant that separates the ore from the spoil material.

 

With this order, ABB will supply a 230 kilovolt in-feed substation to connect the mine to the electricity grid as well as 42 secondary substations. These secondary substations will be contained in ABB’s e-houses, prefabricated, walk-in, modular, outdoor enclosures designed to house a range of electrical and automation equipment. ABB will also supply the motors driving the mine’s conveyor belts.

 

Vale is developing a sustainable mine of the future in the Amazon. The S11D will still represent an industry vanguard in 20 to 30 years. To achieve this, ABB has developed highly customized solutions and has the capability to successfully deploy these solutions on massive scale.

 

“I’m proud that ABB and Vale’s close relationship over more than 10 years has culminated in this pioneering project that sets a new standard in productivity, sustainability and safety,” said Veli-Matti Reinikkala, head of ABB’s Process Automation division. “Cross-divisional collaboration on this project is enabling tight power and automation integration, a key differentiator for ABB.”

 

ABB’s first contract for S11D, announced in September 2012, required the installation and successful commissioning of the primary transmission substation, the first of its kind in Brazil.

 

With this next phase, ABB has now been asked to extend the electrification system to the excavators, stackers, reclaimers and conveyor-belt system at the mine itself.

 

Truckless transportation will use conveyor belts to move rock and ore around the site with lower carbon emissions, reduced operating costs and greater safety than the truck-based system it is replacing. This is the first time such a solution will have been used on a large scale at an iron ore mine.

 

If the S11D mine were to be operated using conventional means, it would need around 100 off-highway trucks that consume 77 percent more diesel per year.

 

The S11D Carajás ore deposit is expected to reach a peak production capacity of 90 million tons annually.

Most Read Today
see see
Offshore Operations
Crew training and connectivity are the true enablers of ...
23/12/25
Recognition
IBP Wins the “Events Oscar” Once Again with ROG.e 2024
11/12/25
FIRJAN
Rio Could Generate 676,000 New Jobs by Stimulating Nine ...
11/12/25
Inland Navigation
Grease-Free Revolution in Latin America’s Workboat Sector
10/12/25
PPSA
Production-Sharing Contracts to Produce 2 Million Barrel...
10/12/25
Recognition
National Public Transparency Program Grants Transpetro I...
10/12/25
Logistics
Transpetro expands its logistics operations with the int...
09/12/25
Auction
PPSA raises around R$ 8.8 billion from the sale of the F...
08/12/25
PPSA
Petrobras announces results of PPSA’s Non-Contracted Are...
08/12/25
Niterói
Niterói concludes second edition of Tomorrow Blue Econom...
02/12/25
Recognition
ABS Consulting Earns Third Elev8 GovCon Honor for Excell...
22/11/25
Award
Aed Energy Wins at the 2025 Energy Storage Awards
22/11/25
Mossoró Oil & Gas Energy 2025
PetroSupply Meeting to Boost Business at Mossoró Oil & G...
21/11/25
Results
Union’s Oil Production Reached 174 Thousand Barrels per ...
21/11/25
International Company News
TGS Extends Agreement with the Government of the Federal...
21/11/25
Company News
Belga Marine and Global Maritime Announce Strategic Part...
21/11/25
Niterói
Tomorrow Blue Economy sets Niterói in motion in the coun...
13/11/25
Cop30
ANP Participates in the Event and Advances Measures for ...
13/11/25
FIRJAN
Enaex 2025 Discusses Reindustrialization, Brazil’s Compe...
13/11/25
Mossoró Oil & Gas Energy 2025
Mossoró Oil & Gas Energy to Feature Strategic Debates in...
13/11/25
Company News
Norsul becomes the first company in Latin America to ado...
11/11/25
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.