Products and Services

Kraken FPSO to receive topside power module from Wärtsilä

Vessel to be deployed at the Kraken oilfield.

Bumi Armada
28/01/2014 12:53
Visualizações: 1554 (0) (0) (0) (0)

 

Wärtsilä will supply a 62 MW topside power module solution for a Floating Production, Storage and Offloading (FPSO) vessel to be deployed at the Kraken oilfield located in the UK sector of the North Sea.
This EPC (engineering, procurement and construction) award has been given in December 2013 by Armada Kraken Pte.Ltd, a wholly owned subsidiary of the Malaysia based international offshore oilfield services provider, Bumi Armada.
The project will comprise the EPC delivery of two identical power generation modules, each housing two 16-cylinder Wärtsilä 50DF multi-fuel engines with generators, waste heat recovery units and all related fuel, oil and air and other utility systems. 
The modules are designed by Wärtsilä Ship Design. The engines are capable of being operated on a variety of fuel types, including treated well gas, heavy crude oil, and marine diesel oil (MDO). The ability to utilise produced gas and crude means that little or no MDO will need to be shipped to the FPSO. This will notably reduce operating costs. Furthermore, the efficient gas-fired power solution will have significantly lower levels of CO2 emissions compared to conventional technologies.
Bumi Armada Enters North Sea Market with Kraken FPSO Deal
Bumi Armada will be using a recently built Suezmax tanker for the FPSO conversion, which will have a storage capacity of 600,000 barrels. The Wärtsilä equipment will be delivered in mid 2015, and the FPSO is scheduled to start the production at the Kraken field in 2016.
“Wärtsilä is the marine and oil & gas industries’ leading solutions and services provider of power solutions. Our vast experience with multi-fuel technology and our ability to integrate complex projects provide the level of reliability that global operators expect. This engagement with Bumi Armada endorses the fact that our integrated power module solutions offer the critical fuel flexibility and the high levels of efficiency and availability that successful offshore operations demand,” says Magnus Miemois, Vice President Solutions, Wärtsilä Ship Power.
The Kraken oilfield development is one of the largest new oilfields in the U.K. sector of the North Sea, and among the largest investments announced for this sector in 2013. Approximately 140 million barrels of heavy oil are expected to be extracted from the Kraken field over the coming 25 years.

Wärtsilä will supply a 62 MW topside power module solution for a Floating Production, Storage and Offloading (FPSO) vessel to be deployed at the Kraken oilfield located in the UK sector of the North Sea.


This EPC (engineering, procurement and construction) award has been given in December 2013 by Armada Kraken Pte.Ltd, a wholly owned subsidiary of the Malaysia based international offshore oilfield services provider, Bumi Armada.The project will comprise the EPC delivery of two identical power generation modules, each housing two 16-cylinder Wärtsilä 50DF multi-fuel engines with generators, waste heat recovery units and all related fuel, oil and air and other utility systems. 


The modules are designed by Wärtsilä Ship Design. The engines are capable of being operated on a variety of fuel types, including treated well gas, heavy crude oil, and marine diesel oil (MDO). The ability to utilise produced gas and crude means that little or no MDO will need to be shipped to the FPSO. This will notably reduce operating costs. Furthermore, the efficient gas-fired power solution will have significantly lower levels of CO2 emissions compared to conventional technologies.


Bumi Armada enters North Sea market with Kraken FPSO Deal


Bumi Armada will be using a recently built Suezmax tanker for the FPSO conversion, which will have a storage capacity of 600,000 barrels. The Wärtsilä equipment will be delivered in mid 2015, and the FPSO is scheduled to start the production at the Kraken field in 2016.


“Wärtsilä is the marine and oil & gas industries’ leading solutions and services provider of power solutions. Our vast experience with multi-fuel technology and our ability to integrate complex projects provide the level of reliability that global operators expect. This engagement with Bumi Armada endorses the fact that our integrated power module solutions offer the critical fuel flexibility and the high levels of efficiency and availability that successful offshore operations demand,” says Magnus Miemois, Vice President Solutions, Wärtsilä Ship Power.


The Kraken oilfield development is one of the largest new oilfields in the U.K. sector of the North Sea, and among the largest investments announced for this sector in 2013. Approximately 140 million barrels of heavy oil are expected to be extracted from the Kraken field over the coming 25 years.

Most Read Today
see see
FIRJAN
Agrega + Indústria brings together entities, companies, ...
29/07/26
SOG 2026
ABPIP brings to Sergipe Oil & Gas a debate on strengthen...
28/07/26
Event
BR Aviation presents its portfolio of customized solutio...
23/07/26
Royalties
Royalties: amounts referring to May production distribut...
23/07/26
Fuels
Fuel and lubricants sector registers 1.8% drop in June, ...
22/07/26
IBP
Studies point to redundancy of the export tax and extra ...
22/07/26
PPSA
7th Spot Auction: PPSA markets cargoes from Atapu and Ba...
20/07/26
Results
Union oil production reaches 244 thousand barrels per da...
17/07/26
State of Ceará
Natural gas arrives in Cariri (CE) and strengthens econo...
16/07/26
Terminals
Vast announces contract extension with PETRONAS Brasil u...
15/07/26
International
War, oil and the dollar: how global fluctuations impact ...
13/07/26
ANP
Third-party access to natural gas flow pipelines and pro...
10/07/26
Agreement
ANP and Petrobras sign agreement to bring 335 offshore w...
07/07/26
Logistics
Vast Infraestrutura and Petrobras strengthen partnership...
07/07/26
IBP Positioning
Change of the instrument does not fix the illegalities o...
07/07/26
Energy Summit
Energy Summit 2026: Embrapii technologies strengthen Bra...
22/06/26
Energy Summit
Biodiesel and renewable fuels move to the center of the ...
22/06/26
Natural Gas
ANP extends public consultation on the calculation of th...
22/06/26
Rio de Janeiro
Firjan’s Oil Yearbook in Rio highlights that positive pr...
22/06/26
Biomethane
With a market five times larger since 2020, the biometha...
22/06/26
Petrobras
Petrobras approves investment in bio-jet fuel and renewa...
22/06/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.