Products and Services

Kraken FPSO to receive topside power module from Wärtsilä

Vessel to be deployed at the Kraken oilfield.

Bumi Armada
28/01/2014 12:53
Visualizações: 1857 (0) (0) (0) (0)

 

Wärtsilä will supply a 62 MW topside power module solution for a Floating Production, Storage and Offloading (FPSO) vessel to be deployed at the Kraken oilfield located in the UK sector of the North Sea.
This EPC (engineering, procurement and construction) award has been given in December 2013 by Armada Kraken Pte.Ltd, a wholly owned subsidiary of the Malaysia based international offshore oilfield services provider, Bumi Armada.
The project will comprise the EPC delivery of two identical power generation modules, each housing two 16-cylinder Wärtsilä 50DF multi-fuel engines with generators, waste heat recovery units and all related fuel, oil and air and other utility systems. 
The modules are designed by Wärtsilä Ship Design. The engines are capable of being operated on a variety of fuel types, including treated well gas, heavy crude oil, and marine diesel oil (MDO). The ability to utilise produced gas and crude means that little or no MDO will need to be shipped to the FPSO. This will notably reduce operating costs. Furthermore, the efficient gas-fired power solution will have significantly lower levels of CO2 emissions compared to conventional technologies.
Bumi Armada Enters North Sea Market with Kraken FPSO Deal
Bumi Armada will be using a recently built Suezmax tanker for the FPSO conversion, which will have a storage capacity of 600,000 barrels. The Wärtsilä equipment will be delivered in mid 2015, and the FPSO is scheduled to start the production at the Kraken field in 2016.
“Wärtsilä is the marine and oil & gas industries’ leading solutions and services provider of power solutions. Our vast experience with multi-fuel technology and our ability to integrate complex projects provide the level of reliability that global operators expect. This engagement with Bumi Armada endorses the fact that our integrated power module solutions offer the critical fuel flexibility and the high levels of efficiency and availability that successful offshore operations demand,” says Magnus Miemois, Vice President Solutions, Wärtsilä Ship Power.
The Kraken oilfield development is one of the largest new oilfields in the U.K. sector of the North Sea, and among the largest investments announced for this sector in 2013. Approximately 140 million barrels of heavy oil are expected to be extracted from the Kraken field over the coming 25 years.

Wärtsilä will supply a 62 MW topside power module solution for a Floating Production, Storage and Offloading (FPSO) vessel to be deployed at the Kraken oilfield located in the UK sector of the North Sea.


This EPC (engineering, procurement and construction) award has been given in December 2013 by Armada Kraken Pte.Ltd, a wholly owned subsidiary of the Malaysia based international offshore oilfield services provider, Bumi Armada.The project will comprise the EPC delivery of two identical power generation modules, each housing two 16-cylinder Wärtsilä 50DF multi-fuel engines with generators, waste heat recovery units and all related fuel, oil and air and other utility systems. 


The modules are designed by Wärtsilä Ship Design. The engines are capable of being operated on a variety of fuel types, including treated well gas, heavy crude oil, and marine diesel oil (MDO). The ability to utilise produced gas and crude means that little or no MDO will need to be shipped to the FPSO. This will notably reduce operating costs. Furthermore, the efficient gas-fired power solution will have significantly lower levels of CO2 emissions compared to conventional technologies.


Bumi Armada enters North Sea market with Kraken FPSO Deal


Bumi Armada will be using a recently built Suezmax tanker for the FPSO conversion, which will have a storage capacity of 600,000 barrels. The Wärtsilä equipment will be delivered in mid 2015, and the FPSO is scheduled to start the production at the Kraken field in 2016.


“Wärtsilä is the marine and oil & gas industries’ leading solutions and services provider of power solutions. Our vast experience with multi-fuel technology and our ability to integrate complex projects provide the level of reliability that global operators expect. This engagement with Bumi Armada endorses the fact that our integrated power module solutions offer the critical fuel flexibility and the high levels of efficiency and availability that successful offshore operations demand,” says Magnus Miemois, Vice President Solutions, Wärtsilä Ship Power.


The Kraken oilfield development is one of the largest new oilfields in the U.K. sector of the North Sea, and among the largest investments announced for this sector in 2013. Approximately 140 million barrels of heavy oil are expected to be extracted from the Kraken field over the coming 25 years.

Most Read Today
see see
ROG.e 2026
Camorim invests R$ 250 million in 2026 to expand fleet a...
18/09/26
ROG.e 2026
Firjan SENAI SESI Presents New Technologies at ROG.e Dev...
18/09/26
ADIPEC 2026
ADIPEC 2026 to mobilise investment in resilient, intelli...
18/09/26
Acquisition
CoreMarine takes a decisive step to expand its offshore ...
17/09/26
ROG.e 2026
M&O and Belga Marine to Showcase Global Energy and Offsh...
17/09/26
26th WPC
WPC ENERGY announces the theme, date and location for it...
16/09/26
New Contracts
Petrobras awards Strohm a contract to supply thermoplast...
15/09/26
ROG.e 2026
Equinor Celebrates 25 Years in Brazil and Showcases Its ...
15/09/26
ROG.e 2026
Sindicom to Host Lubricants Arena at ROG.e 2026
15/09/26
ROG.e 2026
ROG.e 2026 Expected to Generate R$ 593 Million for Rio d...
14/09/26
ABPIP
Independent Producers Propose Nine Measures for the Next...
14/09/26
Products and Services
RiverTough Bearings and Seals
05/09/26
International Company News
OES Group Returns to Private Ownership Following Managem...
31/08/26
Pre-Salt
Petrobras platforms P-80 and P-82, which will operate in...
31/08/26
Royalties
Values related to June production were distributed to st...
27/08/26
People
bp appoints Felipe Arbelaez head of country for Brazil
27/08/26
ROG.e 2026
ROG.e 2026 brings global leaders together to discuss the...
26/08/26
Pre-Salt
Búzios field sets monthly and daily natural gas export r...
26/08/26
Navalshore
Firjan SENAI presents the Supplier Opportunities Network...
17/08/26
Equatorial Margin
Morpho Well: Petrobras discovers hydrocarbons in ultra-d...
15/08/26
Power Generation
Campo Grande hosts four days of debates on bioenergy and...
12/08/26
VEJA MAIS
Newsletter TN

Contact us

We use cookies to ensure you have the best experience on our website. If you continue to use this site, we will assume that you agree with our Privacy Policy, terms of use and cookies.